cover
Contact Name
Nur Hasanah
Contact Email
nur.hasanah@batan.go.id
Phone
+6221-5204243
Journal Mail Official
jpen@batan.go.id
Editorial Address
Kawasan Kantor Pusat Badan Tenaga Nuklir Nasional Jl. Kuningan Barat, Mampang Prapatan, Jakarta 12710 Kotak Pos 4390 Jakarta 12043
Location
Kota adm. jakarta selatan,
Dki jakarta
INDONESIA
Jurnal Pengembangan Energi Nuklir
ISSN : 14109816     EISSN : 25029479     DOI : https://doi.org/10.17146/jpen
Jurnal Pengembangan Energi Nuklir publishes scientific papers on the results of studies and research on nuclear energy development with the scope of energy and electricity planning, nuclear energy technology, energy economics, management of nuclear power plants, national industries that support nuclear power plants, aspects of the nuclear power plant site and environment, and topics others that support the development of nuclear energy.
Articles 9 Documents
Search results for , issue "Vol 15, No 1 (2013): Juni 2013" : 9 Documents clear
PEMETAAN SEBARAN SUBSTRAT SEDIMEN DASAR PERAIRAN PESISIR DI SEMENANJUNG MURIA KABUPATEN JEPARA Heni Susiati; June Mellawati
Jurnal Pengembangan Energi Nuklir Vol 15, No 1 (2013): Juni 2013
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2013.15.1.1618

Abstract

ABSTRAK PEMETAAN SEBARAN SUBSTRAT SEDIMEN DASAR PERAIRAN PESISIR DI SEMENANJUNG MURIA, KABUPATEN JEPARA. Kawasan pesisir Semenanjung Muria telah dilakukan studi untuk pemilihan lokasi pembangkit listrik, salah satunya adalah rencana pembangunan PLTN. Sehubungan dengan hal itu, studi terhadap sebaran substrat sedimen permukaan dasar di perairan tersebut perlu dilakukan. Tujuan penelitian ini adalah untuk mengetahui ukuran butir sedimen permukaan dasar di perairan pesisir Semenanjung Muria. Ukuran butir sedimen dan karakteristiknya akan bermanfaat dalam desain sistem pendingin PLTN. Metode penelitian dengan pengambilan sampel dan analisis laboratorium untuk penentuan besar ukuran butir. Hasil penelitian menunjukkan bahwa sedimen yang terdistribusi di perairan Semenanjung Muria didominasi oleh ukuran butir kecil yaitu dalam kelompok lanau (silt). Pola akumulasi sedimen dasar di perairan Semenanjung Muria mempunyai pola sejajar dengan garis pantai. Sebaran substrat sedimen sangat dipengaruhi oleh kondisi fisik perairan, salah satunya adalah kondisi arus dan gelombang. Kata kunci: Pesisir, PLTN, sedimen ABSTRACT SUBSTRATE SEDIMENT DISTRIBUTION MAPPING IN THE MURIA PENINSULA COASTAL WATERS, JEPARA DISTRICT. Muria Peninsula coastal area has been conducted to study the development of the power station, one of which is a plan to build Nuclear Power Plants (NPP). In this connection, the study of sediment substrate bottom surface water distribution needs to be done. The purpose of this study was to determine the grain size of the sediment surface in coastal at Muria Peninsula. Sediment grain size and characteristics will be useful in the design of NPP cooling system Research methods with sampling and laboratory analysis for the determination of grain size of sediment. The results showed that the sediments are distributed in water is dominated small grain size in the silt. The pattern of accumulation of sediments in the Muria Peninsula waters have a pattern parallel to the coastline. Distribution of sediment substrate is strongly influenced by the physical condition of the water, one of which is a condition of current or wave. Keywords: Coastal, NPP, sediment
Hal Belakang JPEN 2013 Volume 15 Nomor 1 Juni Hal Belakang
Jurnal Pengembangan Energi Nuklir Vol 15, No 1 (2013): Juni 2013
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2013.15.1.3429

Abstract

PERHITUNGAN FAKTOR EMISI CO2 PLTU BATUBARA DAN PLTN Ari Nugroho
Jurnal Pengembangan Energi Nuklir Vol 15, No 1 (2013): Juni 2013
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2013.15.1.1614

Abstract

ABSTRAK MODIFIKASI BENCHMARK DAN PENGARUHNYA TERHADAP AKURASI PENGUKURAN DEFORMASI DI MURIA. Monitoring deformasi di sekitar Gunung Muria, Jawa Tengah direkomendasikan oleh IAEA (International Atomic Energy Agency) untuk dilakukan di sekitar calon tapak PLTN (Pembangkit Listrik Tenaga Nuklir). Hal ini dilakukan untuk mendapatkan data tentang perubahan deformasi akibat adanya aktivitas vulkanik dari Gunung Muria sebagai analisis awal bahaya Gunung Muria terhadap keselamatan bangunan PLTN. Tujuan penelitian ini adalah untuk mengetahui ketelitian dari dua sesi pengukuran deformasi dengan BM (Benchmark) yang berbeda. Pada penelitian ini digunakan alat GPS (Global Positioning System) geodetik jenis Trimble R7 GNSS. Pengukuran pada Bulan April s/d Juli 2011 digunakan BM standar, dilakukan di delapan BM yaitu BKI (Bopkri), UJW (Ujung Watu), PDP (Perdopo), RTW (Rahtawu), RGG (Rengging), KTP (Ketek Putih), CRG (Cranggang), DM (Danyang Mulyo) dan di pantau terhadap satu BM bernama Mijen. Pengukuran pada bulan November 2011 digunakan BM yang sudah dimodifikasi, dilakukan di enam BM yaitu BKI, PDP, RTW, RGG, KTP, CRG dan di pantau terhadap BM yang sama. Hasil pengukuran dengan BM standar menghasilkan ketelitian horisontal berkisar  4 - 7 mm dan vertikal 16 - 28 mm, sedangkan untuk BM yang sudah dimodifikasi menghasilkan ketelitian horisontal berkisar 0,6 mm - 1,3 mm, dan vertikal 0,3 - 0,6 mm. Kata kunci: Deformasi, global positioning system, metode diferensial ABSTRACT THE EFFECT OF MODIFIED BENCHMARK ON THE ACCURACY OF MEASURING THE DEFORMATION AT MURIA. The monitoring of deformation surrounding the Muria mountain is recommended by The IAEA (International Atomic Energy Agency). In addition, this study also to provide the   data of deformation caused by the volcanic activity of Mount Muria, as a basic study in analyzing the volcanic hazard toward the NPP (Nuclear Power Plant). The main purpose of this study is to discover the accuracy between the two measurements by using the different BM (Benchmark). This study uses geodetic GPS (Global Positioning System) Trimble R7 GNSS.  The measurement in the month of April to July 2011 used the standar BM and conducted in eight BM which are BKI (Bopkri), UJW (Ujung Watu), PDP (Perdopo), RTW (Rahtawu), RGG (Rengging), KTP (Ketek Putih), CRG (Cranggang), DM (Danyang Mulyo) and refer to one reference BM named Mijen. The measurement in the month of November 2011 used the modified BM and conducted in six BM which are BKI, PDP, RTW, RGG, KTP, CRG refered to the same reference BM named Mijen. These measurements resulted data in the range of 4-7 mm (horizontal), 16-28 mm (vertical), and in the range of 0.6 mm - 1.3 mm (horizontal), 0.3 mm – 0.6 mm, respectively. Keywords: Deformation, global positioning system, differential method
Hal Muka JPEN 2013 Volume 15 No 1 Juni Hal Muka
Jurnal Pengembangan Energi Nuklir Vol 15, No 1 (2013): Juni 2013
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2013.15.1.3430

Abstract

KAJIAN SISTEM KESELAMATAN SVBR-100 Sahala Maruli Lumbanraja
Jurnal Pengembangan Energi Nuklir Vol 15, No 1 (2013): Juni 2013
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2013.15.1.1615

Abstract

ABSTRAK KAJIAN SISTEM KESELAMATAN SVBR-100. Kecelakaan nuklir yang terjadi di PLTN Fukushima Daiichi pada Maret 2011 menyebabkan penerimaan masyarakat terhadap PLTN sebagai sumber energi listrik semakin menurun. Untuk meminimalisir kecelakaan yang mungkin terjadi dilakukan berbagai perubahan rancang bangun dan sistem keselamatan. Kajian dilakukan dengan membandingkan sistem keselamatan aktif terhadap pasif dan melekat, jenis pendingin, dan jenis materal kelongsong bahan bakar. Tujuan dari studi ini adalah untuk membandingkan sistem keselamatan dari reaktor berpendingin air dengan reaktor berpendingin logam cair.  Sistem keselamatan SVBR-100 sangat tinggi karena diperoleh dari kombinasi  rancang bangun reaktor berbentuk integral, bejana monoblok dan pendingin logam cair lead-bismuth eutenic (LBE). Rancang bangun integral dan monoblok meminimalisir kemungkinan kecelakaan karena semua sistem primer berada di dalam bejana reaktor. Jenis pendingin logam cair LBE lebih unggul dari jenis pendingin air karena LBE merupakan bahan inert, sedangkan air tidak. Kelongsong bahan bakar terbuat dari stainless steel tidak reaktif terhadap pendingin (LBE) dan lingkungannya. Kata kunci: SVBR-100, keselamatan pasif dan melekat, LBE, inert ABSTRACT ASSESMENT OF SAFETY SYSTEM SVBR-100. Nuclear accident occurred at the Fukushima Daiichi NPP in March 2011 led to public acceptance of nuclear power as a source of electrical energy decreases. To minimize accidents that may occur conducted various design changes and safety systems changes. The study was conducted by comparing active safety systems to passive & inherent safety systems, the type of cooland, and the type of cladding. The purpose of this study was to compare the safety system of water-cooled reactors with liquid metal cooled reactors . Safety systems SVBR-100 is very high because it is obtained from a combination of design reactor vessel (integral and monoblock) and liquid metal cooling LBE. Integral and monoblock design minimize the possibility of accidents because of all the primary system is in the reactor vessel. Type of liquid metal coolant lead-bismuth eutenic (LBE) is superior compared to water cooled reacotrbecause LBE is an inert material, while water is not. The fuel cladding of SVBR does not interact with the coollant (LBE) and its enviroment. Keywords: SVBR-100, passive and inherent safety, LBE, inert
KAJIAN PENENTUAN JARAK AMAN INSTALASI PRODUKSI HIDROGEN DENGAN REAKTOR RGTT200K Siti Alimah; Sriyono Sriyono
Jurnal Pengembangan Energi Nuklir Vol 15, No 1 (2013): Juni 2013
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2013.15.1.1616

Abstract

ABSTRAK KAJIAN PENENTUAN JARAK AMAN INSTALASI PRODUKSI HIDROGEN DENGAN REAKTOR RGTT200K. Salah satu metode proses produksi hidrogen yang dikopel dengan RGTT200K adalah menggunakan steam reforming dengangas alam (metana) sebagai bahan baku. Integrasi reaktor RGTT200K dengan pabrik hidrogen harus mempertimbangkan berbagai macam aspek keselamatan dan salah satunya adalah pemisahan jarak antara kedua sistem. Tujuan kajian ini adalah mempelajari sumber-sumber terjadinya kebakaran/ledakan untuk penentuan jarak aman antara instalasi produksi hidrogen proses steam reforming dan reaktor RGTT200K. Metodologi yang digunakan adalah studi literatur dan perhitungan jarak aman berdasar persamaan R = k.W1/3. Pada studi ini, penentuan jarak aman pada integrasi RGTT200K dan pabrik hidrogen menggunakan rumusan berdasar referensi USNRC Regulatory Guide 1.91 dan massanya adalah ekivalen dengan massa TNT (kg). Hasil studi menunjukkan bahwa pabrik hidrogen dengan produk 160.000 m3/hari, menggunakan tangki penyimpan sebesar 400.000 m3, dengan faktor k adalah 8, diperoleh jarak aman yang dibutuhkan adalah 1 km. Jarak ini dapat diperpendek dengan menambahkan tembok penghalang tahan api dan memerlukan kajian lebih lanjut. Kata kunci: Pemisahan, jarak aman, instalasi hidrogen, RGTT200K ABSTRACT THE ASSESMENT ON SAFETY DISTANCE DETERMINATION OF HYDROGEN PRODUCTION  PLANT  WITH  RGTT200K REACTOR. The one of the hydrogen production process method coupled to RGTT200K is the utilization of steam reforming with (methane) natural gas as the feedstock. The integration between RGTT200K and hydrogen plant must consider many safety aspects and one of it is separation distance between these two systems. The purpose of this assessment is to study the sources of fires/explosionand to determine the safety distance between the steam reforming hydrogen production plant and RGTT200K reactor. The used methodology was literature assessment and safety distance calculation with equation R = k.W1/3. In this studi, safety distance determination in integration between RGTT200K and hydrogen plant was using equation based on reference of the USNRC Regulatory Guide 1.91 and mass on the equation was mass equivalent of TNT (kg). The results of the study show the hydrogen plant produces 160,000 m3/day, if requires storage tanks of 400,000 m3 (based USNRC equal to 1.859 million tons of TNT equivalent) with factor k is 8, based on the equation R = k.W1/3, so the requirement for safety distance is 1 km. This distance may be shortened by adding a fire proof wall barrier and requires further assessment. Keywords: Separation, safety distance, hydrogen installation, RGTT200K
PERHITUNGAN FAKTOR EMISI CO2 PLTU BATUBARA DAN PLTN Rizki Firmansyah Setya Budi; Suparman Suparman
Jurnal Pengembangan Energi Nuklir Vol 15, No 1 (2013): Juni 2013
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2013.15.1.1612

Abstract

ABSTRAK PERHITUNGAN FAKTOR EMISI CO2 PLTU BATUBARA DAN PLTN. Perubahan iklim adalah fenomena global akibat kegiatan manusia karena penggunaan bahan bakar fosil untuk mendukung kegiatan industri maupun produksi listrik. Kegiatan tersebut merupakan sumber utama emisi gas rumah kaca (GRK) terutama gas karbon dioksida (CO2). Salah satu cara mengurangi kandungan CO2 di udara adalah dengan menggunakan pembangkit listrik yang mempunyai  faktor emisi CO2 rendah. Tujuan penelitian adalah untuk menghitung dan membandingkan faktor emisi PLTU Batubara dan PLTN guna mengetahui waktu membangkitkan energi listrik pada level tertentu. Metodologi yang digunakan adalah pengumpulan dan pengolahan data sekunder dilanjutkan dengan perhitungan  faktor emisi, analisis dan perbandingan faktor emisi. Dalam studi ini menggunakan data PLTU Batubara Banten, PLTU Indramayu, PLTU Rembang dan PLTN tipe PWR kapasitas 1000 MWe. Hasil penelitian diperoleh faktor emisi untuk masing-masing pembangkit adalah PLTU Banten 1,033 kg/kWh, PLTU Indramayu 1,002 kg/kWh, PLTU Rembang 1,136 kg/kWh, dan PLTN 0 kg/kWh. Nilai rata-rata faktor emisi adalah 1,05 kg/kWh. Pembangkitan daya sebesar 1700 MWyr dengan menggunakan PLTU Banten, Indramayu, dan Rembang akan menghasilkan CO2 sebesar 16 ribu kTon, namun bila pembangkitan daya tersebut diganti dengan 2 unit PLTN 1000 MWe akan mengurangi CO2 sebesar 16 ribu kTon. Kata kunci: Faktor emisi CO2, PLTU batubara, PLTN ABSTRACT CALCULATION OF CO2 EMISSION FACTOR FOR COAL POWER PLANT AND NUCLEAR POWER PLANT. Climate change is a global phenomenon that caused by human activity that use fosil fuel to support industry activity and electricity generation. That activity is the main source of green house gas (GHG) emission, especialy CO2 emission. Using power plant which has low CO2 emission factor is the solution to reduce CO2 emission. The objective of the study is to calculate CO2 emission factor of coal power plant (CPP) and nuclear power plant (NPP). With the emission factor, the value of CO2 emission can be calculated easily. The methodology are collected and processed data, calculated emission factor, analysis and comparation emission factor, conclusion. CPP that had been use are Banten CPP, Indramayu CPP, and Rembang CPP. NPP that had been use is NPP 1000 MWe. Based on the calculation, CO2 emission factor each power plant is Banten CPP 1,033 kg/kWh, Indramayu CPP 1,002 kg/kWh, Rembang CPP 1,136 kg/kWh and NPP 1000 MWe 0 kg/kWh. The average CO2 emission factor of three CPP is 1,05 kg/kWh. Electricity generation in the value 1700 Mwyr using the three CPP make 16 thousand kTon of CO2 emission. If that generation replace by 2 unit NPP 1000 MWe, will reduce CO2 emission 16 thousand kTon. Keywords: CO2 emission factor, coal power plant, nuclear power plant
PERHITUNGAN PARAMETER DEPOSISI LEPASAN PRODUK FISI DI PERMUKAAN TANAH TAPAK PLTN Pande Made Udiyani
Jurnal Pengembangan Energi Nuklir Vol 15, No 1 (2013): Juni 2013
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2013.15.1.1617

Abstract

ABSTRAK PERHITUNGAN PARAMETER DEPOSISI LEPASAN PRODUK FISI DI PERMUKAAN TANAH TAPAK PLTN. Deposisi adalah satu parameter  penting yang digunakan untuk kajian konsekuensi radiasi, terutama untuk menentukan aktivitas deposisi produk fisi di permukaan tanah. Aktivitas deposisi diperlukan untuk menentukan penerimaan dosis radiasi dari paparan permukaan dari groundshine dan ingestion. Tujuan penelitian adalah mengetahui parameter deposisi produk fisi dari kecelakaan AP-1000 di permukaan tanah tapak PLTN. Tapak yang disimulasikan adalah Tapak Ujung Watu, Bojonegara, dan Bangka. Selain itu untuk mendapatkan faktor-faktor yang mempengaruhi parameter deposisi. Metode perhitungan menggunakan Modul deposisition Concern dari PC Cosyma, dengan input data: source term dengan skenario kecelakaan AP-1000, data meteorologi dan kontur  tapak. Hasil penelitian menunjukkan bahwa parameter deposisi untuk tapak Bangka lebih besar dibandingkan tapak lainnya. Parameter deposisi dipengaruhi oleh kondisi meteorologi seperti stabilitas cuaca, kecepatan angin, dan curah hujan. Selain itu dipengaruhi juga oleh kekasaran permukaan kontur tapak, ketinggian lepasan produk fisi di atmosfir dan jarak  dari reaktor. Parameter deposisi tidak dipengaruhi oleh besarnya source term, tetapi dipengaruhi oleh jenis dan sifat radionuklida produk fisi Kata kunci: Deposisi, produk fisi, tanah, tapak, PLTN ABSTRACT THE CALCULATION OF DEPOSITION PARAMETER FOR FISSION PRODUCT IN SURFACE SOIL OF NPP SITE. Deposition parameter is one of the important parameters for the consequences of radiation. Primarily to determine the activity of fission product deposition on the ground surface. Deposition activity is needed to determine the radiation dose acceptance of surface exposure and ingestion of groundshine. The purpose of this study was to determine the parameters of the fission product deposition of AP-1000 accident in the NPP ground surface. The simulation has done at site of Ujung Watu, Bojonegara, and Bangka. This study is also to obtain the factors that affect the deposition parameters. Calculation method is to use a module deposisition Concern of Pc Cosyma with input data: the source term of AP-1000 accident scenario, meteorological data and the roughnes contour of site. The results showed that the deposition parameters for the Bangka is bigger than the other site. Deposition parameters are influenced by meteorological conditions such as: the weather stability, wind speed and precipitation, also by the surface roughness of site contour, height fission product releases in the atmosphere and the distance from the reactor. Deposition parameters are not affected by the magnitude of the source term, but  influenced by the type and nature of fission product radionuclides. Keywords: Deposition, fission product, soil, site, NPP
IDENTIFIKASI SISTEM KELURUSAN DI TAPAK BANTEN MENGGUNAKAN DATA CITRA SATELIT SPOT-5 Yuliastuti Yuliastuti; Heni Susiati; Yunus Daud; Achmad Sarwiyana Sastratenaya
Jurnal Pengembangan Energi Nuklir Vol 15, No 1 (2013): Juni 2013
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2013.15.1.1613

Abstract

ABSTRAK IDENTIFIKASI SISTEM KELURUSAN DI TAPAK BANTEN MENGGUNAKAN DATA CITRA SATELIT SPOT-5. Telah dilakukan studi identifikasi sistem kelurusan di tapak Banten menggunakan data citra satelit SPOT-5. Berdasarkan hasil survei tapak regional di Pulau Jawa, Banten merupakan salah satu calon tapak potensial. Tujuan studi untuk menentukan arah dan kronologi pembentukan kelurusan morfologi regional yang berhubungan dengan sesar atau pensesaran di calon tapak tersebut. Metodologi yang digunakan mencakup pemotongan citra satelit, pemilihan band, edge enhancement filtering, ekstraksi kelurusan dan analisis kelurusan. Hasil studi menunjukkan adanya tiga kelompok arah kelurusan regional yang cukup dominan, yaitu arah Utara-Selatan, Baratlaut-Tenggara, dan Timur-Barat. Berdasarkan kronologinya, kelompok kelurusan Utara-Selatan merupakan kelompok kelurusan yang paling tua diikuti arah Timur-Barat dan yang termuda adalah arah Baratlaut-Tenggara. Kelompok-kelompok kelurusan tersebut dapat dikonfirmasi sebagai manifestasi dari sistem sesar. Kata kunci: Citra satelit, kelurusan, sesar, survei tapak ABSTRACT LINEAMENT SYSTEMS INDENTIFICATION IN BANTEN SITE USING SPOT 5 SATTELITE IMAGE. Lineament systems identification in Banten site using SPOT 5 satellite image has been performed. Based on regional site survey in Java Island, Banten is one of the potential candidate sites. The objective of this study was to determine direction and chronology of regional lineament morphology which was consider as fault or faulting in Banten site. The methodology used in this study covered satellite image cropping, band selection, edge enhancement filtering, lineament extraction and lineament analysis. Result of the study showed that there were three dominant lineament groups, namely N-S, NW-SE, and E-W. Based on the forming chronology of the lineament, N-S group was the oldest one, followed by E-W group and NW-SE as the youngest group. These lineament groups have been confirmed as a manifestation of fault system structure. Keywords: Faults, lineaments, site survey, satellite image

Page 1 of 1 | Total Record : 9


Filter by Year

2013 2013


Filter By Issues
All Issue Vol 23, No 2 (2021): Desember 2021 Vol 23, No 1 (2021): Juni 2021 Vol 22, No 2 (2020): Desember 2020 Vol 22, No 1 (2020): Juni 2020 Vol 21, No 2 (2019): Desember 2019 Vol 21, No 1 (2019): Juni 2019 Vol 20, No 2 (2018): Desember 2018 Vol 20, No 1 (2018): Juni 2018 Vol 19, No 2 (2017): Desember 2017 Vol 19, No 1 (2017): Juni 2017 Vol 18, No 2 (2016): Desember 2016 Vol 18, No 1 (2016): Juni 2016 Vol 17, No 2 (2015): Desember 2015 Vol 17, No 1 (2015): Juni 2015 Vol 16, No 2 (2014): Desember 2014 Vol 16, No 1 (2014): Juni 2014 Vol 15, No 2 (2013): Desember 2013 Vol 15, No 1 (2013): Juni 2013 Vol 14, No 2 (2012): Desember 2012 Vol 14, No 1 (2012): Juni 2012 Vol 13, No 2 (2011): Desember 2011 Vol 13, No 1 (2011): Juni 2011 Vol 12, No 2 (2010): Desember 2010 Vol 12, No 1 (2010): Juni 2010 Vol 11, No 2 (2009): Desember 2009 Vol 11, No 1 (2009): Juni 2009 Vol 10, No 2 (2008): Desember 2008 Vol 10, No 1 (2008): Juni 2008 Vol 9, No 2 (2007): Desember 2007 Vol 9, No 1 (2007): Juni 2007 Vol 8, No 2 (2006): Desember 2006 Vol 8, No 1 (2006): Juni 2006 Vol 7, No 2 (2005): Desember 2005 Vol 7, No 1 (2005): Juni 2005 Vol 6, No 2 (2004): Desember 2004 Vol 6, No 1 (2004): Juni 2004 Vol 5, No 2 (2003): Desember 2003 Vol 5, No 1 (2003): Juni 2003 Vol 4, No 2 (2002): Desember 2002 Vol 4, No 1 (2002): Juni 2002 Vol 3, No 2 (2001): Desember 2001 Vol 2, No 4 (2000): Desember 2000 Vol 2, No 3 (2000): September 2000 Vol 2, No 2 (2000): Juni 2000 Vol 2, No 1 (2000): Maret 2000 Vol 1, No 4 (1999): Desember 1999 Vol 1, No 3 (1999): September 1999 Vol 1, No 1 (1999): Maret 1999 More Issue