cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota surabaya,
Jawa timur
INDONESIA
Jurnal Titra
ISSN : -     EISSN : -     DOI : -
Core Subject : Engineering,
Arjuna Subject : -
Articles 38 Documents
Search results for , issue " Vol 1, No 2 (2013)" : 38 Documents clear
Analisa Hubungan Faktor Demografis Karyawan dan Lingkungan Kerja terhadap Potensi Penyakit yang Diderita Karyawan PT Ecogreen Oleochemicals Batam Wijaya, Nyoto Hendy; Sutapa, I Nyoman
Jurnal Titra Vol 1, No 2 (2013)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

This article discuss about correlation between demographic factor of employees and work environment against potential disease suffered by employees. Demographic factor of employees such as job grade, age, weight, and blood pressure. The company wanted to know about description of potential disease suffered by employees based on demographic factor, the correlation between that variables, and know work environment factor which potentially against disease in workplace. Analysis method used Spearman’s Rho Test, Logistic Regression, and Fishbone Diagram. The higher demographic factor cause the disease suffered by employees more dominated by degenerative disease. All demographic factor have a correlation with potential disease suffered by employees, but only 13 from 24 disease have strong correlation. The potential disease suffered by employees also caused by 2 factors from work environment, namely man (employees awareness still lacking) and management (role of company not optimal). This research was ended by doing effectiveness of annual medical check up analysis, namely by eliminating blood glucose test and add USG mammae test. The company should give further attention to employees, such as give a punishment to employees who not wearing PPE, auditing SHE in workspace, improve the infrastructure and provide training for employees about SHE.
Perencanaan Perbaikan Proses Administrasi dan Analisis Kebutuhan Operator Proses Produksi PG 1160 di PT E-T-A Indonesia Chokro, William; Sutapa, I Nyoman
Jurnal Titra Vol 1, No 2 (2013)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

PT E-T-A Indonesia had problems on administrations and production process. In the administrations, it was found that the lead time to fulfill the customer order was too long. While, in the production process, the company wanted to know how many workers should be utilized in the production line. To answer these problems, we occupied Makigami Diagram for identifying inefficiency processes in the administration department. We also measured the daily KPI for deciding the optimized the number of workers. As the results of those improvement; the total day for administration process was reduced to two days and the number of workers could be reduced up to two persons.
Perancangan Emergency Response Plan di PT E-T-A Indonesia Glorius, Yoel; Panjaitan, Togar W S
Jurnal Titra Vol 1, No 2 (2013)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

PT E-T-A is a German based company and has designed several emergency response systems as its major business. The company would like to plan a complete emergency response system. This plan is executed by adding the active protection system, rescuing people procedures, and developing rescuerer team. In the new emergency response system design, we added an active protection system, consisting of smoke detector, manual call point, fire alarm. Additionally, we also relocated some APAR’s locations which carry out the government regulation: PermakerNo.04/Men/1980 in 2009. Moreover, we added an assembly point, evacuation route, and rescuerer team.
Value Stream Mapping sebagai Alat Identifikasi Waste ¬ pada PT. X untuk Departemen A Yulianto, Joko; Octavia, Tanti
Jurnal Titra Vol 1, No 2 (2013)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

PT. X is one of company that concerns with continuous improvement.  PT. X attempts to apply the concept of lean manufacturing in order to identify waste. Value stream mapping is one of the tools from lean manufacturing that can illustrate the entire process and identify waste ranging from the arrival of raw materials to the delivery of finished goods. Value stream mapping will be carried out at PT. X for department A. Through the current state value stream mapping can be seen that there are some waste in PT. X for department A ranging from the arrival of raw materials to become finished goods, among others is waste motion, over-processing waste, defect waste, inventory waste, and waste waiting. Design of future state value stream mapping is based on the proposed improvement given to the company. Future state value stream mapping can reduce lead time 41% from the current state value stream mapping.
Rancangan Sistem Perencanaan Produksi dan Pengendalian Persediaan dengan Mempertimbangkan Efisiensi Biaya Pada PT. X Sulayman, Yunita Velany; Palit, Herry Christian
Jurnal Titra Vol 1, No 2 (2013)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

PT. X is a manufacturing company with produce crude oil and cooking oil. The company has problem with determination appropriate of ROP which caused stock out in some products that produced by PT. X. Analyze of stock out condition did while 2011 and 2012. PT. X apply make to stock system. Metode that used at this project is continuous review policy to determine the appropriate of ROP and minimize the cost which adjusted with PT. X condition. The results of improvement of opportunity is there are different ROP and maximum capacity. The improvement will analyzed of the cost and compared with actual system. Cost reduce that resulted are 22% for first improvement and 15% for second improvement. Company can consider both of improvement with their profit.
Peningkatan Yield Departemen XYZ pada PT X Rahardjo, Benedictus; Rahardjo, Jani
Jurnal Titra Vol 1, No 2 (2013)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

XYZ Department at PT X didn’t achieve the yield target, which is one of the Key Performance Indicators, had been determined by Factory in 2012. Some improvements have been developed to increase yield in order to achieve the target. One of the improvements is to verify material transaction between two departments. Another improvement is to reduce the waste, from both Direct Incoming Material (DIM) and non DIM. DIM discussed in this research and contributing the top three waste materials in 2012, were filter rod, cigarette paper, and tipping paper. Non DIM waste that also gave contribution for increasing yield was tobacco. Yield has already increased by doing some of those improvements by 0.45% for AAA product, from 94.85% to 95.3%. Although the target of this year (95.4%) has not been achieved yet, these research’s results show yield increasing trend. In order to keep the consistency of the yield achievement, this Department made bulletin forms as standardization attached on the relevant machines. This bulletin form can be a standard operating procedure for those who operate that machine every day, so that the yield achievement can be stable and increase.
Penurunan Waste Proses Produksi Produk RJK di Departemen DEW PT. X dengan Value Stream Mapping Saputra, Franky; Widyadana, I Gede Agus
Jurnal Titra Vol 1, No 2 (2013)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

PT. X wants to increase profit that obtained from RJK product. Increasing the price can make RJK product will lose with its competing product. PT. X chooses to eliminate wastes that exist in production so higher profit can be obtained. PT. X wants to eliminate non value added activity that exists in RJK production process. Identification waste is done by the help of value stream mapping. Some wastes are located on Main line, CR line, and BYM line. Those wastes happen because of a lot of breakdown on combine line, over bulking, and BYM line does not have independent line because BYM line does not have a cutter. Combine line’s breakdown mainly caused by too long blend changeover or BCO time. Some improvements are done to eliminate waste on Main line, CR line, and BYM line. SMED concept is applied to speed up the BCO time so breakdown time of combine line will reduce. Alarm or visual alert installation is done so overbulking does not happen again. Searching for cutter at other affiliate is done so BYM line has independent line. Those improvements give impact by reducing NVA about 2.44 % at Main line, 0.48 % at CR line, and 1.4 % at BYM line.
Pengukuran Kesenjangan (Gap) Kualitas Layanan Perpustakaan UK Petra dengan Metode Servqual Kansil, Alvin; Sutapa, I Nyoman
Jurnal Titra Vol 1, No 2 (2013)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

The purpose of the research was to measure gap between perceive and expectation of the library users on quality of PCU Library services (gap 5), gap between library user expectations and library management perceptions (gap 1), gap between library user expectations and library staff perceptions (gap 6), and gap between library management perceptions and library staff perceptions about library user expectations (gap 7). The gap analysis used Servqual method.The research result showed that the most negative value of gap 5 is activity staff offer assistance to library users, with a score of -1,47. The most negative value of gap 1 is conformity Digital Theses collection with library user’s needs (-1,00). The most negative value of gap 6 is the existence of DiVo as a means of information and promotion (-0,15). The most negative value of gap 7 is conformity Digital Theses collection with library user’s needs (-1,19).
Pembaharuan Prosedur Departemen Produksi dan Departemen QSHE di PT Charoen Pokphand Indonesia Balaraja Chandra, Genesius; Halim, Siana
Jurnal Titra Vol 1, No 2 (2013)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

PT Charoen Pokphand Indonesia Balaraja is a company in feed production. One of the ways for PT Charoen Pokphand Indonesia maintaining their feed quality is through documentation of all activity that related with production in procedure. The last update of procedures was in 2008, so some procedures are no longer applicable in company’s current condition. So that, the procedures must be updated and those procedures can be used as work guidance and work standard. Total of 8 procedures, 34 work instructions, 14 forms, 10 appendixes in Production Department and 13 procedures, 109 work instructions, 31 forms, 7 appendixes in QSHE Department, which had been revised.
Peningkatan Efisiensi Manpower Berdasarkan Prinsip Shoujin di Area Produksi Head Lamp PT Astra Otoparts Divisi Adiwira Plastik Sanjaya, Robert Gorevi; Palit, Herry Christian
Jurnal Titra Vol 1, No 2 (2013)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

Regional Minimum Wage (RMW) enhancement in Kab. Bogor is adequately high which in 2013, the RMW increasing 61% from 2012. RMW enhancement which not followed with manpower (MP) efficiency could became a disadvantage for company. The initial condition evaluation indicate the MP efficiency value is 45% and the line efficiency value is 70,5%. Total initial manpower allocation is 8 MP. Improvement executed which consider to customer demand and production capability. Evaluation result indicates there’s unbalance work load distribution of each MP. Improvement planned such as balancing the work load of each MP, machine modification, and re-layout the production area. The implementation based on shoujin principle’s resulted manpower saving from 8 MP to 6 MP, which the MP efficiency value is 53% and the line efficiency value is 85,8%. Standardized work did as well as the control item in order to stabilize the improvement process. The next step is the analysis of production capability to face the increasing of customer demand. This analysis concluded that production needed additional overtime and additional work shift (for November only) in order to fulfill the customer demand.

Page 1 of 4 | Total Record : 38