cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota malang,
Jawa timur
INDONESIA
Journal of Engineering and Management in Industrial System
Published by Universitas Brawijaya
ISSN : 23383925     EISSN : 24776025     DOI : -
Core Subject : Engineering,
Journal of Engineering and Management in Industrial System is a peer reviewed journal. The journal publishes original papers at the forefront of industrial and system engineering research, covering theoretical modeling, inventory, logistics, optimizations methods, artificial intelligence, bioscience industry and their applications, etc.
Arjuna Subject : -
Articles 7 Documents
Search results for , issue "Vol 5, No 2 (2017)" : 7 Documents clear
IMPLEMENTATION OF LEAN MANUFACTURING TO MINIMIZE WASTE IN THE PROCESS OF PLASTIC BOX 260 USING VSM AND AHP METHOD Roberth Marshall Ratlalan; Ishardita Pambudi Tama; Sugiono Sugiono
Journal of Engineering and Management in Industrial System Vol 5, No 2 (2017)
Publisher : Badan Penerbit Jurnal, Faculty of Engineering, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (697.623 KB) | DOI: 10.21776/ub.jemis.2017.005.02.2

Abstract

Abstract one of the national manufacturing industry company engaged in the manufacture of military products with the resulting product is plastic box 260. To minimize the waste that occurs lean manufacturing approach is assisted by one of the tools in the concept of lean value stream mapping (VSM) aims to describe the overall Information from the flow of raw materials to finished products. Waste identification begins with the waste relationship matrix (WRM) and waste assessment questionnaire (WAQ) to determine the percentage of waste with the 3rd largest rank. Further analysis is done by analytical hierarchy process (AHP) aims to know the criteria of weighting from waste that has the highest ranking. The recommendation of improvement based on the analysis of waste with the 3 largest (unccessary inventory, overproduction, motion) and takt time calculation is to apply 5S, to apply forecasting, to add a working facility in the form of cooling room, to do maintenance activities such as preventive maintenance, addition of tools and machine, Setting laser machine, and layout design of production floor layout.
A FRAMEWORK TO IMPROVE ENVIRONMENTAL PERFORMANCE IN SMES Marudut Sirait
Journal of Engineering and Management in Industrial System Vol 5, No 2 (2017)
Publisher : Badan Penerbit Jurnal, Faculty of Engineering, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (358.335 KB) | DOI: 10.21776/ub.jemis.2017.005.02.6

Abstract

The aim of this study is to develop a conceptual framework for assessing and minimzing industrial waste. A conceptual framework is developed by integrating Life Cycle Assessment (LCA) tool and cleaner production method. LCA is utilized to evaluate and identifi  industrial waste along the life cycle of product/services . On the other hand,  cleaner production method is implemented for mitigation strategy to minimizing the most significant waste along industrial activities. By using LCA, the significant waste will be identified. Furthermore, cleaner production will be implemented to the significant waste to improve the environmental performance of industries activities. Cleaner production strategies such as product modification, Input substitution, technology modification, reuse/recycling, and good housekeeping are applied to prevent industrial waste generation. Furthermore, the integration betwen LCA tool and CP method significanly improve the environmnetal performance  during the industrial activities. CP and LCA were succesfull for improving environmental performance in term of raw material saving, water saving, energy saving and wastewater reduction. 
DETERMINATION OF STANDARD TIME IN PACKAGING PROCESSING USING STOPWATCH TIME STUDY TO FIND OUTPUT STANDARD Rio Prasetyo Lukodono; Siti Kholisotul Ulfa
Journal of Engineering and Management in Industrial System Vol 5, No 2 (2017)
Publisher : Badan Penerbit Jurnal, Faculty of Engineering, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (798.141 KB) | DOI: 10.21776/ub.jemis.2017.005.02.5

Abstract

Time is one of the factors to assess a worker's performance in utilizing the available resources. Operator in his work requires efficient time to improve work productivity. One of factory in produce a shrimp feed in Surabaya has a large production level. In the production process, the packaging department in this company still uses human resources in their production process and the company define the standard of production without using standard time. This paper investigates the opportunity a logical analysis in determining the standard time in this company. The determination of the standard time in the packaging process requires comprehensive analysis. Objects observed are four operators in the packaging department that carried out the activities of filling bag the shrimp feed with 40 replication for each data. The work measurement was conducted by direct method using Stopwatch Time Study (STS) with snap-back method. The results of this study indicate the standard time value of the four lines packaging is not much different or almost the same. Sequentially the standard time workers line 1 to line 4 is 7.325 seconds, 7.240 seconds, 7.225 seconds, and 7.065 seconds. Allowance used for workers is 8%. However, the existing production rate of company is higher than the production rate of work measurement calculation. This is due to the difference of definition in employee allowance rate and performance rating.
THE INTEGRATION OF OVERALL EQUIPMENT EFFECTIVENESS (OEE) METHOD AND LEAN MANUFACTURING CONCEPT TO IMPROVE PRODUCTION PERFORMANCE (CASE STUDY: FERTILIZER PRODUCER) Adi Yermia Tobe; Denny Widhiyanuriyawan; Lilis Yuliati
Journal of Engineering and Management in Industrial System Vol 5, No 2 (2017)
Publisher : Badan Penerbit Jurnal, Faculty of Engineering, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (596.615 KB) | DOI: 10.21776/ub.jemis.2017.005.02.7

Abstract

High machine downtime and large number of rejected products is still become a big problem for company as a research object in this study. Overall Equipment Effectiveness (OEE) is one of the methods used to measure the effectiveness of a machine with three measurement factors, namely; availability rate, performance rate, and quality rate. The integration of OEE measurement and lean manufacturing analysis method is employed to improve production system in company. The measurement result shows that the value of availability rate is 88.82%, performance rate 93.70%, and quality rate 98.20%; then the OEE values obtained 81.73%. The root cause is investigated by using FMEA (Failure Mode and Effect Analysis) method particularly from the RPN (Risk Priority Number).
ALTERNATIVE PLASTIC BOX 260 ASSEMBLY LINE USING HEURISTIC METHOD AND SIMULATION METHOD APPROACH TO INCREASE ASSEMBLY LINE EFFICIENCY Sabdha Purna Yudha; Pratikto Pratikto; Ishardita Pambudi Tama
Journal of Engineering and Management in Industrial System Vol 5, No 2 (2017)
Publisher : Badan Penerbit Jurnal, Faculty of Engineering, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (3868.83 KB) | DOI: 10.21776/ub.jemis.2017.005.02.1

Abstract

assembly is the one step on productions. Efficiency of assembly line is affecting to the level of production. To increase the level of production, the efficiency of assembly line must increase to. Aims of this research is to create the alternative assembly line with using heuristic method and simulation approach, to meet higher level of efficiency and increase the assembly line capacity. The result from this research could increase the efficiency of assembly line from 53,2% to 91,5%, and result from simulation approach could increase capacity of assembly line from 9035 box per month to 11249 box per month
REVENUE SHARING CONTRACT AS COORDINATION MECHANISM WITH THE IMPLEMENTATION OF LOGISTICS OUTSOURCING IN DECENTRALIZED SUPPLY CHAIN Winda Narulidea; Artya Lathifah
Journal of Engineering and Management in Industrial System Vol 5, No 2 (2017)
Publisher : Badan Penerbit Jurnal, Faculty of Engineering, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (412.898 KB) | DOI: 10.21776/ub.jemis.2017.005.02.4

Abstract

By making logistics outsourcing decision, companies have been able to improve the logistics performance, maintain focus on core business, and minimize distribution cost. However in decentralized condition, there is only limited control of the third party logistics service provider (TPLSP), whose logistics service performance affect the products availability, quality, price, and market share. In this research, a model is developed as coordination mechanisms with the implementation of logistics outsourcing in decentralized supply chain. Revenue sharing contract model is developed in the proposed model to coordinate the supply chain consisting of manufacturers, TPLSPs, and retailers. Moreover the incentive and penalty scheme are implemented in accordance to the supply chain logistics service performance, so the risks and the necessary costs could be allocated to all players. To increase the desirability level of the contracts for all players, the contracts parameters are determined so that all players could obtain higher profit than in a common decentralized supply chain conditions, furthermore the win-win condition can be achieved. This paper provides new model of coordination mechanism in supply chain with logistics outsourcing and offers the incentive and penalty scheme into the basic model of revenue sharing contracts.
ANALYSIS OF TEMPERATURE DISTRIBUTION OF HEAT TRANSFER COEFFICIENT IN COOLING SYSTEM (SIMULATION) USING POROUS MEDIA WITH POROSITY VARIATION Ahmad Hamim Su'udy; Eko Siswanto; Rudy Soenoko
Journal of Engineering and Management in Industrial System Vol 5, No 2 (2017)
Publisher : Badan Penerbit Jurnal, Faculty of Engineering, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1236.58 KB) | DOI: 10.21776/ub.jemis.2017.005.02.3

Abstract

Abstract: Internal combustion engine is an engine that is old enough and today has much alternative energy that is found to shift from the role of motor fuel, The cooling system in internal combustion engine, if not handled properly will cause something that is fatal is the occurrence of overheating. Cooling during this time using the fin and radiator, and research continues to grow in terms of heat transfer, that is by using porous media, with the help of computer simulation then the role of the fin and radiator can be replaced with porous media with porosity variation 10%, 15%, 20% 25%, 30% so that the temperature distribution will be obtained. The result of the research by using simulation shows that the porosity value of porous media, the temperature distribution value is also bigger. The lower porosity of the value of (h) the heat transfer coefficient will increase.

Page 1 of 1 | Total Record : 7