cover
Contact Name
Syafii
Contact Email
jnte@ft.unand.ac.id
Phone
-
Journal Mail Official
Syafii@ft.unand.ac.id
Editorial Address
-
Location
Kota padang,
Sumatera barat
INDONESIA
JURNAL NASIONAL TEKNIK ELEKTRO
Published by Universitas Andalas
ISSN : 23022949     EISSN : 24077267     DOI : -
Core Subject : Engineering,
Jurnal Nasional Teknik Elektro (JNTE) adalah jurnal ilmiah peer-reviewed yang diterbitkan oleh Jurusan Teknik Elektro Universitas Andalas dengan versi cetak (p-ISSN:2302-2949) dan versi elektronik (e-ISSN:2407-7267). JNTE terbit dua kali dalam setahun untuk naskah hasil/bagian penelitian yang berkaitan dengan elektrik, elektronik, telekomunikasi dan informatika.
Arjuna Subject : -
Articles 14 Documents
Search results for , issue "Vol 4, No 1: Maret 2015" : 14 Documents clear
Perancangan Data Distribution Unit Sebagai Backup Data Posisi, Navigasi Dan Referensi Waktu Di Kapal Perang Republik Indonesia Untuk Sistem Pertahanan Terhadap GPS Jamming Alwi, Muhamad Bashori; Juhana, Tutun
JURNAL NASIONAL TEKNIK ELEKTRO Vol 4, No 1: Maret 2015
Publisher : Jurusan Teknik Elektro Universitas Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25077/jnte.v4n1.115.2015

Abstract

Semua kekuatan militer di seluruh dunia saat ini memiliki ketergantungan yang sangat penting pada data Positioning,  Navigation & Timing (PNT) yang diperoleh dengan menggunakan Global Positioning System (GPS). Ketersediaan data PNT yang diperoleh dari perangkat GPS pada kapal Perang Republik Indonesia (KRI) akan sangat berpengaruh pada penentuan posisi kapal, data navigasi serta ketersediaan referensi waktu yang digunakan oleh perangkat navigasi dan SEWACO (Sensor, Weapon and Command). Dalam penelitian ini kami merancang suatu sistem pertahanan terhadap GPS jamming pada kapal perang Republik Indonesia dengan menggunakan perangkat gyro inersial sebagai backup data PNT apabila GPS dalam kondisi terjamming melalui Data Distribution Unit (DDU). Analisa dan percobaan sistem tersebut dilaksanakan secara langsung di KRI sehingga hasil dari penelitian ini dapat diterapkan secara langsung pada sistem sewaco. Dari hasil percobaan, DDU dapat melakukan auto switching data PNT dari perangkat GPS ke perangkat gyro inersial apabila GPS dalam kondisi terjammer dan mendistribusikan data tersebut dengan format NMEA-0183. Dari analisa terhadap akurasi dan presisi terhadap gyro inersial, data PNT gyro tersebut memiliki nilai HDOP sebesar 0,695 dengan peak of error horizontal sebesar 2,62 meter dan standar deviasi (latitude/longitude) sebesar 0,742 meter / 0,861 meter.
Desain Sistem Kontrol Traffic Light Adaptif pada Persimpangan Empat berbasis PLC Siemens ., Zulfikar; ., Tarmizi; ., Oktavina
JURNAL NASIONAL TEKNIK ELEKTRO Vol 4, No 1: Maret 2015
Publisher : Jurusan Teknik Elektro Universitas Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (478.734 KB) | DOI: 10.25077/jnte.v4n1.137.2015

Abstract

Traffic light yang ada saat ini masih menggunakan waktu tetap sebagai pengendali nyala lampunya. Namun sistem ini memiliki kekurangan, salah satunya pada jam sibuk kendaraan harus menunggu lama disalah satu jalur. Sehingga diperlukan suatu sistem kontrol traffic light yang dapat memprioritaskan jalur yang lebih padat kendaraan. Kontrol traffic light adaptif bekerja dengan mendeteksi jumlah antrian kendaraan pada suatu jalur. Sistem ini bekerja dengan sensor yang mendeteksi panjang antrian kendaraan. Terdapat tiga sensor yang akan mendeteksi panjang antrian kendaraan pada setiap jalur. Jika antrian kendaraan mencapai sensor pertama maka waktu yang diberikan pada lampu hijau adalah 5 detik lebih lama dari waktu normal pada jalur tersebut. Jika antrian kendaraan mencapai sensor kedua maka waktu yang diberikan pada lampu hijau adalah 10 detik lebih lama dari waktu normal dan jika antrian kedaraan telah mencapai sensor ketiga sistem akan memberikan waktu nyala lampu hijau sangat lama yaitu 15 detik lebih lama dari waktu normal. Pada sistem kontrol traffic light adaptif ini terdapat dua buah sensor kemacetan yang diletakkan pada pertengahan jalur simpang empat yang akan menghidupkan seluruh lampu merah jika terjadi hal tidak terduga seperti saat setelah padamnya aliran listrik. Dengan sistem kontrol traffic light adaptif ini waktu terlama antrian kendaraan adalah 92 detik, jika seluruh sensor pada setiap jalur bekerja dan waktu tercepat adalah 47 detik yaitu waktu pada saat normal.Kata kunci: Traffic light, PLC Siemens Simatic S-7 300, Sensor Kemacetan, Traffic Light Adaptif.Abstract—Nowadays, traffic lights are using a fixed time as on-off light signal controller. However this system has many disadveantages, such as vehicles have to queue long time in certain road section (lane) at rush hour. As a consequence, it reguires a traffic light control system that can prioritize a more dense lane. Adaptive traffic light control detects the number of queues of vehicles on the lane. Sensors detect the vehicle queue’s length. There are three sensors that will detect queues’s length of vehicles on each lane. When the queue of vehicles reached the first sensor, the green light will be on longer 5 seconds compare to the normal traffic. When the queue of vehicles reaches the second sensor, the green light provide 10 seconds more compare to the normal traffic and if the queue of vehicles reaches the third sensor, the green light will be longer whic is about 20 seconds compare. In this adaptive traffic light control system, there are two jam sensors installed in the middle of the intersection that will turn on all the red lights when there is an unexpected problems happened. This adaptive traffic light control system will provide the longest queuing time 92 seconds, when all sensors on all lanes active and the fastest time is 47 seconds which is the time when the normal system.Keywords: Traffic light, PLC Siemens S-7 300, Traffic Sensor, Adaptive Traffic Light.
Rancang Bangun Sistem Informasi Jasa Ekspedisi Barang Studi Kasus: PT. XYZ Hamdani, Agus Umar; Pratiwi, Kurnia Rahayu
JURNAL NASIONAL TEKNIK ELEKTRO Vol 4, No 1: Maret 2015
Publisher : Jurusan Teknik Elektro Universitas Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25077/jnte.v4n1.126.2015

Abstract

PT. XYZ is a company engaged on expedition delivery services.Currently, in the data processing has still some problems, such as: Calculate of trasport expenses and commissions for driver which is often wrong, bills for customer are difficult to controlling, because it has created based on customer documents and work order has returned from delivery, Can not present about delivery information by quickly and accurate, documents are easily to lost and damaged, and takes a long time for processing and control of transaction. To solve these problems required a system that capable to handling all problems so that administrative services can be run effectively and efficiently. The purpose of this research is build a system that capable to overcome problems services in PT. XYZ. In this research, to analyze and design the proposed system use Object-Oriented Analysis and Design(OOAD metodology), programming language use Microsoft Visual .Net 2008, database use MySQL and system testing use the Black Box System.
Sistem Deteksi Petir Multistation Dengan Metode Time Of Arrival Tessal, Dasrinal; Emeraldi, Primas; Hazmi, Ariadi
JURNAL NASIONAL TEKNIK ELEKTRO Vol 4, No 1: Maret 2015
Publisher : Jurusan Teknik Elektro Universitas Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1370.49 KB) | DOI: 10.25077/jnte.v4n1.105.2015

Abstract

This study was done at ligtning detection system in Padang. The systems was consist of 3 electric field sensors with synchronous satelite GPS. Time of arrival and sensors coordinate was taken from each sensors. This data was used to calculate ligtning location by Time of Arrival Linear Spherical method. Then the distances between lighting and sensor can be calculated. The distances will compared with electric field waveforms recorded at lightning sensor to testing validity our results. After validity, lightning current peak can be calculated. 8 of 20 data sample are valid with lowest lightning current peak is -1,001 kA dan highest value is -2,661 kA. Keywords : Lightning, Lightning Detection System, Time of Arrival Ligtning Current Peak. AbstrakPenelitian ini dilakukan pada sistem deteksi petir yang dibangun di kota Padang. Sistem terdiri dari 3 sensor medan listrik dan GPS yang tersinkronisasi. Perbedaan waktu datang dan koordinat sensor didapatkan dari masing-masing sensor. Data ini digunakan untuk mendapatkan lokasi kejadian petir dengan metode Time of Arrival Linear Spherical. Setelah lokasi petir didapatkan maka jarak antara stasiun dengan lokasi kejadian petir dapat diketahui. Jarak sensor dengan petir dibandingkan dengan parameter gelombang medan listrik yang terekam sehingga dapat diketahui validnya hasil perhitungan. Setelah hasil perhitungan valid maka arus puncak dapat ditentukan. Dari 20 data  tersebut terdapat 8 data yang bentuk gelombang medan listriknya sesuai dengan jarak antara sensor dengan lokasi petir dengan arus puncak petir yang terendah  berada  pada  nilai -1,001 kA dan tertinggi berada pada nilai -22,661 kA.  Kata Kunci: Pembangkit Listrik Tenaga Hybrid, Diesel Generator, Photovoltaic Array, HOMER, Optimalisasi, TNPC  
Optimalisasi PID Power System Stabilizer Menggunakan Fire Fly Algorithm Pada Sistem Pembangkit Listrik Jawa-Bali Kurniawan, Adi
JURNAL NASIONAL TEKNIK ELEKTRO Vol 4, No 1: Maret 2015
Publisher : Jurusan Teknik Elektro Universitas Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (533.908 KB) | DOI: 10.25077/jnte.v4n1.112.2015

Abstract

Perubahan nominal beban menyebabkan terjadinya osilasi frekuensi dan tegangan generator pada sistem pembangkit multi mesin. Oleh sebab itu, perlu adanya kompensator yang dapat memperbaiki kestabilan frekuensi dan tegangan sehingga osilasi terjadi hanya dalam waktu yang singkat dan dengan amplitudo yang kecil. Pada makalah ini, dirancang kontroler untuk meningkatkan kestabilan dinamik pada sistem pembangkit listrik Jawa-Bali. Kontroler yang diusulkan adalah PID Power System Stabilizer (PSS) yang dituning dengan Fire Fly Algorithm (FFA). Hasil simulasi penerapan kontroler pada sistem pembangkit listrik Jawa-Bali menunjukkan bahwa kontroler yang diusulkan dapat meredam osilasi secara cepat dan dengan amplitudo yang rendah bila dibandingkan dengan sistem tanpa kontroler
Perkiraan Kestabilan Tegangan Secara Dinamis Menggunakan Eksponen Lyapunov Maksimum Triyatno, M. Widi; Zebua, Osea; Ginarsa, I Made
JURNAL NASIONAL TEKNIK ELEKTRO Vol 4, No 1: Maret 2015
Publisher : Jurusan Teknik Elektro Universitas Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (408.185 KB) | DOI: 10.25077/jnte.v4n1.138.2015

Abstract

Disturbances in the operation of the power system may cause disturbance in voltage stability. Therefore, dynamic voltage stability analysis before and after disturbance needs to be performed. This paper proposes dynamic voltage stability prediction using maximum Lyapunov exponent with Lampung’s electrical system as case study. Voltage stability simulation is performed with various types of disturbances that occur at line between of Baturaja substation and Bukit Kemuning substation. Time-series data of voltage measurement of simulation results at GI Baturaja is applied for voltage stability prediction analysis using maximum Lyapunov exponent. With the same number of data samples and the same time for circuit breakers to interrupt disturbances, the simulation results using maximum Lyapunov exponent show that the voltage can be stabilized at 1.7 seconds after the occurrence of the three-phase disturbance, at 1.2 seconds after the occurrence of the phase-to-ground disturbance, at 0,9 second after the occurrence of the disturbance between phase, at 1.2 seconds after the occurrence of the loss of line disturbance and 1.4 seconds after the occurrence of the loss of load disturbance. The amount of data samples used in analysis affect the time for the voltage reaches stability.
Perancangan Penguat Awal Menggunakan Tabung Hampa Pada Aras Tegangan Rendah Budhiantho, Matias H.W.; Dewantoro, Gunawan; Sabatino, Demas
JURNAL NASIONAL TEKNIK ELEKTRO Vol 4, No 1: Maret 2015
Publisher : Jurusan Teknik Elektro Universitas Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (470.105 KB) | DOI: 10.25077/jnte.v4n1.98.2015

Abstract

Vacuum tube amplifiers have been known as softly-cliping audio amplifiers, as opposed to solid-state based amplifiers which exhibit hard-cliping properties. However, vacuum tubes are operated in high voltage level. Meanwhile, in order to work in low voltage level, a vacuum tube amplifier must employ step down transformers that leads to complexity. This study aims to make use of vacuum tubes in a pre-amplifier working on 12 VDC level. First, several measurements were done to obtain graphics of characteristic of triode 12AT7 in low voltage level. Common-cathode topology was cascaded with a common-anode topology to realize such amplifier. The results show that the preamplifier has an input impedance of 1.11 MΩ, output impedance of 3.5 kΩ for the right channel and 3.2 kΩ for the left channel. Maximum Total Harmonic Distortion of 1.7% occurs on frequency of 4 kHz. Voltage gains of 20.08 dB and 20 dB were obtained for the right and left channels, respectively. This pre-amplifier also shows sensitivity of 212 mVrms, maximum output level of 2 Vrms, and relatively flat frequency response within 60 Hz–20 kHz with ripple of ± 0.5dB. This pre-amplifier can be alternatively used in two modes, namely linear mode and distorted mode.Keywords : Pre-amplifier, Vacuum Tube, Linear Mode, Distorted ModeAbstrakPenguat tabung hampa telah dikenal sebagai penguat audio dengan sifat soft-clipping, dan tidak seperti penguat transistor yang bersifat hard-clipping. Tabung hampa umumnya merupakan suatu komponen aktif yang bekerja pada aras tegangan tinggi (ratusan volt), namun pada aras tegangan tinggi penguat tabung membutuhkan transformator keluaran untuk menurunkan aras tegangan isyarat keluaran. Penelitian ini bertujuan untuk merancang penguat awal dengan menggunakan tabung hampa pada tegangan kerja 12 VDC. Untuk merancang untai tabung hampa pada aras tegangan rendah, telah dilakukan pengukuran untuk mendapatkan grafik karakteristik trioda 12AT7. Untai tabung hampa direalisasikan dengan topologi katoda bersama yang dikaskade dengan anoda bersama. Dari hasil pengukuran didapatkan spesifikasi penguat awal yaitu impedansi masukan sebesar 1.11 MΩ, impedansi keluaran 3.5 kΩ pada kanal kanan dan 3.2 kΩ pada kanal kiri, THD maksimal terjadi pada frekuensi 4 kHz di kanal kanan yaitu sebesar 1.7%, bati tegangan 20,08 dB pada kanal kanan dan 20 dB pada kanal kiri, sensitivitas 212 mVrms, aras keluaran maksimal 2 Vrms, tanggapan frekuensi yang rata pada rentang 60 Hz – 20 kHz dengan fluktuasi ± 0.5 dB. Penguat awal ini dapat digunakan secara bergantian dalam dua ragam, yaitu ragam linier dan ragam cacat berupa efek flanger.Kata Kunci : Penguat Awal, Tabung Hampa, Mode Linear, Mode Distorsi//
Analisa Performansi Tanggapan Tegangan Sistem Eksitasi Generator Terhadap Perubahan Parameter Laksono, Heru Dibyo; Febrianda, Adry
JURNAL NASIONAL TEKNIK ELEKTRO Vol 4, No 1: Maret 2015
Publisher : Jurusan Teknik Elektro Universitas Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (458.411 KB) | DOI: 10.25077/jnte.v4n1.117.2015

Abstract

This journal discusses about performance analysis of generator excitation system voltage response towards parameters changes. Changes in the parameters of the generator excitation system will affect the response voltage generator excitation system performance, in both time domain and frequency domain performances. The performance analysis of the generator excitation system voltage response in both time domain and frequency domain, conduct with the help of Matlab software. For performance in the time domain is consists of error analysis and transient analysis, while for performance in the frequency domain is consists of the open-loop performance and closed-loop performance. The parameters that to be changed are the amplifier gain constant, amplifier time constant, generator gain constant, and generator time constant. The analysis result shows that the performance of the generator excitation system voltage response in both time domain and frequency domain performances is very sensitive towards the changes in the parameters, especially for the changes of amplifier gain constant, the changes of amplifier time constant, the changes of generator gain constant, and the changes of generator time constant.
Analisis Motor Induksi Fasa Tiga Tipe Rotor Sangkar Sebagai Generator Induksi Dengan Variasi Hubungan Kapasitor Untuk Eksitasi Berlianti, Rahmi
JURNAL NASIONAL TEKNIK ELEKTRO Vol 4, No 1: Maret 2015
Publisher : Jurusan Teknik Elektro Universitas Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (612.998 KB) | DOI: 10.25077/jnte.v4n1.135.2015

Abstract

Motor induksi fasa  tiga dapat dapat dioperasikan sebagai generator induksi fase tiga. Kecenderungan menggunakan generator induksi (rotor sangkar) sebagai pengganti generator sinkron juga semakin meningkat khususnya untuk PLTMh kecil dengan beban penerangan (resistif). Hal ini dikarenakan alasan perawatannya rumit, susah didapat dipasaran, dan harganya mahal. Generator induksi  penguatan sendiri, memiliki banyak keuntungan dibandingkan dengan generator sinkron. Akan tetapi generator induksi menawarkan regulasi tegangan yang lemah dan nilainya bergantung pada kecepatan penggerak, kapasitor, dan beban.  Pada penelitian ini digunakan motor induksi  fasa  tiga rotor sangkar  0,9 KW, 2,7 A, pf 0,84, 50 Hz sebagai generator induksi, dengan variasi hubungan kapasitor Bintang dengan nilai kapasitansi 25µF, Delta 8µF, dan C-2C 8µF dan 16µF untuk beban R-RL yang variatif. Dan dari ketiga hubungan kapasitor tersebut yang lebih baik adalah hubungan bintang dengan  kapasitansi 25 µF.Kata kunci : motor induksi, generator induksi, kapasitor, bintang, delta,  C-2C, fasa tiga, penguatan sendiri
Optimalisasi Desain Sistem Pembangkit Listrik Tenaga Hybrid Diesel Generator - Photovoltaic Array Menggunakan Homer (Studi Kasus : Desa Sirilogui, Kabupaten Kepulauan Mentawai) Purnama Sari, Dewi; Nazir, Refdinal
JURNAL NASIONAL TEKNIK ELEKTRO Vol 4, No 1: Maret 2015
Publisher : Jurusan Teknik Elektro Universitas Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1476.302 KB) | DOI: 10.25077/jnte.v4n1.104.2015

Abstract

Pembangkit Listrik Tenaga Hybrid merupakan salah satu solusi untuk mengatasi kekurangan pasokan listrik di daerah tertinggal dan terisolir yang tidak terjangkau oleh jaringan listrik PLN, dikarenakan daerah tertinggal pada umumnya memiliki letak geografi dan topografi yang tidak memungkinkan adanya perluasan jaringan listrik PLN. Integrasi dua pembangkit listrik yaitu pembangkit listrik tenaga konvensional (diesel generator) yang bersumber dari bahan bakar minyak (BBM) dengan pembangkit listrik yang bersumber dari energi terbarukan (photovoltaic array) merupakan suatu solusi yang menguntungkan untuk memenuhi kebutuhan beban listrik harian di daerah terpencil seperti Desa Sirilogui yang terletak di Kecamatan Siberut Utara Kabupaten Kepulauan Mentawai, karena dengan integrasi diesel generator-photovoltaic array ini dapat memberikan solusi penerangan 24 jam bagi 310 kepala keluarga (KK) di Desa Sirilogui yang pada mulanya hanya menikmati penerangan selama 4 jam, itupun hanya di malam hari yaitu dari pukul 18.00-22.00 WIB yang bersumber dari 3 unit diesel generator. Dengan adanya integrasi dua pembangkit listrik ini, pengoperasian diesel generator dapat diminimalisir sehingga menghemat pemakaian BBM dan mengurangi emisi CO2 yang ditimbulkan akibat pengoperasian diesel generator. Penelitian ini memfokuskan pembahasan mengenai Optimalisasi Desain Sistem Pembangkit Listrik Tenaga Hybrid Diesel Generator-Photovoltaic Array dengan menggunakan HOMER sebagai alat bantu simulasinya. HOMER merupakan perangkat lunak yang dipergunakan untuk membantu menyederhanakan tugas modeler dalam mengevaluasi desain sistem pembangkit listrik tenaga hybrid yang memungkinkan dengan mengurutkan berdasarkan pada total net present cost (TNPC) terendah untuk mendapatkan sistem yang paling optimal. Pada penelitian ini, hasil desain untuk sistem dengan beban listrik harian sebesar 479,280 kWh yang paling optimal berdasarkan hasil simulasi menggunakan HOMER yaitu photovoltaic berkapasitas 65 kW, 3 unit diesel generator masing-masing berkapasitas 15 kW, 156 unit battery dan bidirectional converter berkapasitas 78 kW dengan TNPC sebesar $ 1.362.474 dan cost of energy (COE) sebesar 1,485 $/kWh. Sistem Pembangkit Listrik Tenaga Hybrid Diesel Generator-Photovoltaic Array diusulkan dapat mengurangi emisi CO2 0,06% per tahun dibandingkan dengan penggunaan diesel generator saja.           Kata Kunci: Pembangkit Listrik Tenaga Hybrid, Diesel Generator, Photovoltaic Array, HOMER, Optimalisasi, TNPC Abstract—Hybrid Power Plant is one of the solutions to overcome the shortage of electricity in underdeveloped and isolated areas not covered by PLN electricity network, due to underdeveloped regions generally have the geography and topography that does not allow for expansion of PLN electricity network. Integration of the two power plants is a conventional power plant (diesel generator) that comes from fuel oil (BBM) with power plants sourced from renewable energy (photovoltaic arrays) is an advantageous solution to meet the needs of daily electricity load in remote areas such as the Village Sirilogui located in the District of North Siberut Mentawai Islands, because the integration of photovoltaic arrays diesel generator can provide 24 hour lighting solution for 310 households (families) in the village Sirilogui which at first only enjoy the lighting for 4 hours, and even then only at night days, from 06.00 to 10.00 pm o'clock sourced from 3 units of diesel generator. With the integration of these two power plants, diesel generator operation can be minimized so it saves fuel consumption and reduce CO2 emissions caused by the operation of the diesel generator. This study focuses the discussion on Design Optimization of Hybrid Power Plant System Diesel Generator-Photovoltaic Array by using HOMER as a tool for simulation. HOMER software is used to help simplify the task of the modeler in evaluating the design of hybrid power plant system that allows to sort based on the total net present cost (TNPC), the lowest for the most optimal system. In this study, the results of the design for the system with the daily electricity load of 479,280 kWh most optimal based on the simulation results using HOMER ie photovoltaic capacity of 65 kW, 3 units of diesel generators with a capacity of each 15 kW, 156 units of battery and bidirectional converter with a capacity of 78 kW TNPC amounted to $ 1.362.474 and the cost of energy (COE) of $ 1,485/kWh. Hybrid Power Plant System Diesel Generator-Photovoltaic Array proposed can reduce CO2 emissions by 0,06% per year compared with the use of diesel generators only.Keywords: Hybrid Power Plant, Diesel Generator, Photovoltaic Array, HOMER, Optimization, TNPC  

Page 1 of 2 | Total Record : 14