Analisis Aliran Daya Metode Fast Decoupled dengan Perhitungan Manual dan Simulasi Perangkat Lunak pada Pembangkit Listrik Tenaga Panas Bumi Unit 4 Kamojang Royb Fatkhur Rizal; Muhammad Zaki Al Mubarok; Tyto Nugraha
JURNAL TEKNIK ELEKTRO Vol 15 No 3 (2026): Vol 15 No 3 (2026): SEPTEMBER 2026
Publisher : Universitas Negeri Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26740/jte.v15n3.p304-312

Abstract

Penelitian ini membahas analisis aliran daya pada jaringan 4 bus di PLTP Unit 4 PT Pertamina Geothermal Energy Area Kamojang menggunakan metode Fast Decoupled. Perhitungan manual dilakukan untuk mencari nilai daya aktif (P) dan daya reaktif (Q) pada setiap saluran bus, kemudian dibandingkan dengan simulasi software ETAP 19.0.1. Hasil pengujian menunjukkan perhitungan manual mencapai konvergensi setelah 5 iterasi, namun terdapat selisih dengan hasil ETAP, dengan selisih daya nyata terbesar pada saluran Bus 1-2 sebesar 399.300 Watt atau sekitar 52%. Selisih ini diperkirakan disebabkan oleh keterbatasan ketelitian perhitungan manual serta faktor kapasitansi dan harmonisa yang lebih akurat diperhitungkan oleh software. Penelitian ini merekomendasikan penggunaan software seperti ETAP atau MATLAB untuk analisis aliran daya pada jaringan yang besar dan kompleks.
ANALISIS TEKNO-EKONOMI INVESTASI PEMBANGKIT LISTRIK TENAGA SURYA (PLTS) APUNG PADA WADUK WONOREJO SEBAGAI STRATEGI OPTIMALISASI ENERGI TERBARUKAN Nabella Sofa Nur Afiqoh; Royb Fatkhur Rizal
Elektrika Vol. 18 No. 2 (2026): Oktober 2026
Publisher : Universitas Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26623/elektrika.v18i2.14618

Abstract

The development of Floating Solar Power Plants (FSPP) in Indonesia has significant potential due to high solar radiation intensity and the availability of extensive water areas. This study aims to analyze the techno-economic feasibility of investing in a Floating Solar Power Plant at Wonorejo Reservoir, Tulungagung Regency, East Java, as a strategy for optimizing renewable energy utilization. The floating solar system was designed with a capacity of 10 MW using 18,182 JA Solar JAM72S30550 photovoltaic modules and 40 Sungrow SG250HX-20 inverters. The analysis was conducted using HOMER Pro software combined with manual calculations to evaluate energy production, investment costs, and the economic feasibility of the project. The results show that the system is capable of generating stable electrical energy over a 25-year operational period, with an initial annual production of approximately 14,278 MWh. The total investment cost of the system is estimated at IDR 74,828,180,240, with annual operation and maintenance (O&M) costs of IDR 980,000,000. The economic analysis resulted in a Net Present Value (NPV) of IDR 160,230,391,433, an Internal Rate of Return (IRR) of approximately 8.19%, and a discounted payback period of around 4.6 years. Based on these results, the floating solar power project at Wonorejo Reservoir is considered economically feasible and promising as a sustainable renewable energy source.                     ABSTRAK   Pemanfaatan Pembangkit Listrik Tenaga Surya (PLTS) apung di Indonesia memiliki potensi besar untuk dikembangkan karena didukung oleh intensitas radiasi matahari yang tinggi serta ketersediaan area perairan yang luas. Penelitian ini bertujuan menganalisis kelayakan tekno-ekonomi investasi PLTS apung pada Waduk Wonorejo, Kabupaten Tulungagung, Jawa Timur, sebagai strategi optimalisasi energi terbarukan. Sistem PLTS apung dirancang dengan kapasitas 10 MW menggunakan 18.182 modul surya JA Solar JAM72S30-550 dan 40 inverter Sungrow SG250HX-20. Analisis dilakukan menggunakan perangkat lunak HOMER Pro yang dikombinasikan dengan perhitungan manual untuk mengevaluasi produksi energi, biaya investasi, serta kelayakan ekonomi proyek. Hasil penelitian menunjukkan bahwa sistem mampu menghasilkan energi listrik secara stabil selama periode operasi 25 tahun dengan produksi awal sekitar 14.278 MWh per tahun. Total biaya investasi sistem diperkirakan sebesar Rp74.828.180.240 dengan biaya operation and maintenance (O&M) tahunan sebesar Rp980.000.000. Hasil analisis ekonomi menunjukkan nilai Net Present Value (NPV) sebesar Rp160.230.391.433, Internal Rate of Return (IRR) sebesar ±8,19%, serta discounted payback period sekitar 4,6 tahun. Berdasarkan hasil tersebut, proyek PLTS apung di Waduk Wonorejo dinyatakan layak untuk dikembangkan sebagai sumber energi terbarukan berkelanjutan.   Kata kunci: PLTS apung, Waduk Wonorejo, tekno-ekonomi, NPV, IRR, payback period.