Nur Cahya, Evi
Unknown Affiliation

Published : 5 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 5 Documents
Search

Study of Drainage Channel Planning with Building Information Modeling (BIM) Implementation in UB Forest Buntoro Taufiqurrohman, Muhammad; Dermawan, Very; Nur Cahya, Evi
Jurnal Teknik Pengairan: Journal of Water Resources Engineering Vol. 15 No. 1 (2024)
Publisher : Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.pengairan.2024.015.01.2

Abstract

The UB Forest Buntoro area is a biodiversity conservation zone that has the potential to be developed into a tourist forest, so it is planned to build a drainage channel in each section of the road to overcome the runoff that occurs. This research aims to describe an example of the application of BIM in construction planning for drainage channels. In this study, drainage channel planning was done using AutoCAD Civil 3D and Storm and Sanitary Analysis (SSA) software. The AutoCAD Civil 3D application is used to create a road route for which drainage channels are planned, and the SSA is used to analyze the hydrology and hydraulics of the drainage channel. Based on Building Information Modeling findings, the optimal drainage channel design yielded channel dimensions of 0.4 m × 0.4 m. The main channels (RC (Right Channel) and LC (Left Channel)) are planned to use gabion material, while the culverts are planned to use u-ditch material and a construction planning cost of 1.571.818.500,00 IDR. This study intends to give an example of how Building Information Modeling (BIM) is applied in Indonesia, particularly in the area of water resources. It does this by utilizing AutoCAD Civil 3D and SSA programs to design drainage channels. 
Studi Efektivitas Pembangunan Kolam Retensi pada Sungai Bremi untuk Mengatasi Banjir Menggunakan HEC-RAS 6.5 Salsabila, Sekar; Dermawan, Very; Nur Cahya, Evi
Jurnal Teknologi dan Rekayasa Sumber Daya Air Vol. 5 No. 1 (2025): Jurnal Teknologi dan Rekayasa Sumber Daya Air (JTRESDA)
Publisher : Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.jtresda.2025.005.01.011

Abstract

Sungai Bremi sebagai salah satu sungai di Kota dan Kabupaten Pekalongan tercatat mengalami banjir di setiap tahunnya. Kondisi topografi yang cenderung datar menghambat aliran sungai menuju ke laut. Tujuan dari studi ini yaitu mengetahui kondisi eksisting banjir serta penambahan kolam retensi sebagai upaya untuk mengatasi banjir. Kondisi eksisting dilakukan dengan pemodelan hidraulik memakai analisis aliran 2D HEC-RAS 6.5 dengan simulasi unsteady flow berupa debit banjir rancangan dengan HSS Nakayasu Q5, Q10, dan Q20. Dari hasil itu, ditambahkan kolam retensi sebagai upaya mengatasi banjir yang direncanakan di hulu sebesar 456.764,1 m3 dan hilir sebesar 220.926,7 m3. Kolam retensi direncanakan terdapat bendung samping sebagai inlet dan pintu klep otomatis sebagai outlet. Penambahan kolam retensi dapat mereduksi banjir sebeasar 79,83%.
Study of Drainage Channel Planning with Building Information Modeling (BIM) Implementation in UB Forest Buntoro Taufiqurrohman, Muhammad; Dermawan, Very; Nur Cahya, Evi
Jurnal Teknik Pengairan: Journal of Water Resources Engineering Vol. 15 No. 1 (2024)
Publisher : Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.pengairan.2024.015.01.2

Abstract

The UB Forest Buntoro area is a biodiversity conservation zone that has the potential to be developed into a tourist forest, so it is planned to build a drainage channel in each section of the road to overcome the runoff that occurs. This research aims to describe an example of the application of BIM in construction planning for drainage channels. In this study, drainage channel planning was done using AutoCAD Civil 3D and Storm and Sanitary Analysis (SSA) software. The AutoCAD Civil 3D application is used to create a road route for which drainage channels are planned, and the SSA is used to analyze the hydrology and hydraulics of the drainage channel. Based on Building Information Modeling findings, the optimal drainage channel design yielded channel dimensions of 0.4 m × 0.4 m. The main channels (RC (Right Channel) and LC (Left Channel)) are planned to use gabion material, while the culverts are planned to use u-ditch material and a construction planning cost of 1.571.818.500,00 IDR. This study intends to give an example of how Building Information Modeling (BIM) is applied in Indonesia, particularly in the area of water resources. It does this by utilizing AutoCAD Civil 3D and SSA programs to design drainage channels. 
Studi Perencanaan Anggaran Biaya Proyek (ABP) dan Penjadwalan Pelaksanaan Proyek PLTM Batu Brak Oktaviasari, Ayu; Tri Juwono, Pitojo; Nur Cahya, Evi
Jurnal Teknologi dan Rekayasa Sumber Daya Air Vol. 6 No. 1 (2026): Jurnal Teknologi dan Rekayasa Sumber Daya Air (JTRESDA) - Inpres
Publisher : Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.jtresda.2026.6.1.14

Abstract

Pengembangan PLTM menjadi bagian penting dalam mendukung penyediaan energi terbarukan yang berkelanjutan. Penelitian ini menyajikan perencanaan anggaran dan penjadwalan proyek PLTM Batu Brak dengan memanfaatkan metode fasttrack dan crashing sebagai pendekatan percepatan durasi. Proses analisis meliputi perhitungan kebutuhan sumber daya, pemetaan ketergantungan antar aktivitas, serta penyusunan dan optimalisasi jadwal. Hasil analisis menunjukkan bahwa penerapan metode crashing mampu menghemat biaya proyek sebesar 4% dan memangkas waktu pelaksanaan sebesar 1,1%, sementara metode fasttrack menghasilkan penghematan biaya 2% dan pemangkasan waktu sebesar 1,8%. Temuan ini menunjukkan bahwa kedua metode efektif diterapkan dalam perencanaan dan pengelolaan proyek energi terbarukan, khususnya untuk meningkatkan efisiensi waktu dan biaya konstruksi.
Studi Manajemen Konstruksi Pada Proyek Pelebaran Dermaga IV LCM Pelabuhan Ketapang Kabupaten Banyuwangi Nazirah HS, Halma; Marsudi, Suwanto; Nur Cahya, Evi
Jurnal Teknologi dan Rekayasa Sumber Daya Air Vol. 6 No. 1 (2026): Jurnal Teknologi dan Rekayasa Sumber Daya Air (JTRESDA) - Inpres
Publisher : Fakultas Teknik, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.jtresda.2026.6.1.9

Abstract

Pelebaran Dermaga IV LCM di Pelabuhan Ketapang, Kabupaten Banyuwangi, dilakukan sebagai respons terhadap meningkatnya arus penumpang dan barang di jalur penyeberangan antara Pulau Jawa dan Bali. Keberhasilan proyek ini sangat ditentukan oleh penerapan manajemen konstruksi yang terencana dengan baik, mulai dari tahap perencanaan, penjadwalan, hingga pengendalian sumber daya demi tercapainya efisiensi waktu dan biaya. Studi ini bertujuan mengkaji beberapa opsi percepatan proyek untuk mencapai efisiensi biaya serta efektivitas durasi pelaksanaan. Terdapat tiga opsi percepatan yang dikaji, yakni penambahan jam kerja bagi pekerja, penambahan kuantitas peralatan berat, serta kombinasi antara keduanya. Hasil studi menunjukkan bahwa penambahan jam kerja tenaga kerja mampu menghasilkan penghematan biaya sebesar 0,71% dengan percepatan durasi sebesar 3,33%. Di sisi lain, penambahan peralatan berat menghasilkan penghematan biaya sebesar 0,33% dengan pemangkasan waktu sebesar 2,50%. Opsi kombinasi mampu menekan biaya sebesar 1,39% serta mempercepat durasi pekerjaan hingga 6,00%. Berdasarkan hasil tersebut, kombinasi penambahan jam kerja dan penambahan alat berat merupakan percepatan yang paling optimal untuk proyek pelebaran Dermaga IV LCM Pelabuhan Ketapang, Kabupaten Banyuwangi berdasarkan pertimbangan aspek biaya dan durasi.