Claim Missing Document
Check
Articles

Found 1 Documents
Search
Journal : Journal of Applied Civil Engineering and Infrastructure Technology (JACEIT)

Analisis Biaya Pekerjaan Timbunan Tanah Dengan Metode Photogrammetry Oktavia, Andita; Kristiana, Retna
Journal of Applied Civil Engineering and Infrastructure Technology Vol 7 No 2 (2026): Desember 2026 (Articles in Press)
Publisher : Indonesian Society of Applied Science

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.52158/jaceit.v7i2.1279

Abstract

Recently, the construction industry has rapidly developed technology, particularly in infrastructure construction. One alternative is Free and Open Source Software (FOSS) Photogrammetry to factor in the cost of landfill work on the Padang – Sicincin toll road project. The photogrammetry method is a science and part of the art of obtaining mathematically precise measurements. The photogrammetry method can be an alternative solution for increasing cost effectiveness in projects with direct cost calculations. Surveyors conduct data measurement in the hoarding work for each layer of the Padang - Sicincin toll road project. Then, in the field, there was an inaccuracy in the x, y, z results when data was collected using a total station. According to the analysis results, the volume of the fill material deviated by 5.4%. The photogrammetry method indicated a difference of 26.95 m³ more than the manual method. The cost deviation from the previously calculated volume results was Rp2,234,719.26, making the photogrammetry method cheaper than the manual method.