Evaluation of Historical Building Economic Value To Improve Company Revenue With Value Engineering Method Suwandari, Yunita Dian; Mirnayani, Mirnayani
Jurnal Teknik Sipil dan Perencanaan Vol 23, No 1 (2021): Jurnal Teknik Sipil dan Perencanaan
Publisher : Semarang State University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.15294/jtsp.v23i1.25944

Abstract

Abstract: Historical buildings have high historical, cultural, and architectural values. This research aims to provide an overview of the economic benefits for building owners when utilizing the building. Case studies, the qualitative methods and Value Engineering were used in this research. This study identified three building functions to add economic value and are feasible in terms of investment value. The buildings are a budget hotel, restaurant/cafeteria, and co – working space. IRR value for budget hotels is 14.29%; the NPV value is IDR 58,375,939,253; 14 years payback; the distribution of the financing scheme 30% landowners and 70% investors; 30-year concession. Restaurant / café and co – working space; the value of IRR is 12.47%; the value of NPV is IDR 4,727,841,299.58; Payback 8 years. This research is useful for historic building owners, government, and academics to utilize their assets to have economic value.  
Analisa Aspek Kualitatif Pemilihan Kontraktor Untuk Pekerjaan Renovasi/Perbaikan Gedung Bersejarah Yunita Dian Suwandari; Mirnayani Mirnayani
Rekayasa Sipil Vol 10, No 2 (2021)
Publisher : Universitas Mercu Buana

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22441/jrs.2021.v10.i2.01

Abstract

Pemilihan kontraktor yang tepat menjadi salah satu penentu keberhasilan proyek kontruksi gedung baik gedung modern maupun gedung bersejarah.. Tujuan dari penelitian ini adalah untuk menganalisa kriteria pemilihan kontraktor gedung bersejarah dan kriteria dominan yang menjadi pertimbangan para pemilik gedung. Metode yang digunakan adalah kualitatif. Hasil penelitian ini terdapat 13 kriteria pemilihan kontraktor untuk pekerjaan perbaikan gedung bersejarah dan terdapat 3 variabel yang dominan.  Penelitian ini bermanfaat bagi pemilik Gedung bersejarah, pemerintah dan kalangan
PENGARUH LINGKUNGAN KLIEN DALAM INTEGRASI “SUPPLY CHAIN” PADA PROYEK KONSTRUKSI Mirnayani Mirnayani
Rekayasa Sipil Vol 4, No 1 (2015)
Publisher : Universitas Mercu Buana

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Industri konstruksi adalah sebuah proyek dimana terdapat beberapa pihak yang terlibat , yaitu klien/owner,konsultan, kontraktor, dan para supplier, yang masing-masing memiliki peran berbeda-beda dalam suatu rantaisupply chain. Supply Chain Management telah lama digunakan sebagai alat untuk meningkatkan kinerja supplychain di konstruksi. Meningkatkan koordinasi diantara pihak yang terlibat dalam satu rantai supply chainmerupakan tujuan dan dasar utama dalam peningkatan integrasi supply chain. Klien adalah inti dari supply chainyang berpengaruh terhadap derajat integrasi dalam supply chain dan secara keseluruhan menentukan kesuksesanproyek. Jenis penelitian yang digunakan adalah penelitian inferensial dengan menggunakan analisa regresiberganda untuk mengetahui hubungan antar lingkungan klien dengan integrasi supply chain. Penelitian inimenggunakan metode survey dengan bantuan kuisioner sebagai instrumen untuk mengumpulkan datanya.Berdasarkan analisa yang telah dilakukan, model persamaan regresi linier berganda antara lingkungan kliendengan integrasi supply chain untuk variabel terikat Koordinasi yaitu Y = 0,6763 + 0.2649 X1 + 0,0412 X2 +0,3184 X3 + 0,1531 X4 ; untuk variabel terikat Komitmen Y = 0,833 + 0,226 X1 + 0,362 X2 + 0,023 X3 + 0,111X4; untuk variabel terikat Kolaborasi Y = 2,024 - 0,082 X1 + 0,269 X2 + 0,145 X3 - 0,009 X4. Berdasarkan ujimodel yang dilakukan, disimpulkan bahwa hubungan variable bebas faktor lingkungan klien terhadapkoordinasi dan komitmen dalam integrasi supply chain secara signifikan berpengaruh. Sedangkan Faktor-faktorlingkungan klien menyangkut faktor personal, departemen, organisasi dan eksternal secara bersama-sama tidakberpengaruh signifikan terhadap kolaborasi pada proyek. Dari keempat variabel tersebut, departemen merupakanfaktor yang paling dominan pengaruhnya terhadap integrasi supply chain.
PENERAPAN EARNED VALUE METHOD SEBAGAI ALAT UKUR KINERJA BIAYA DAN JADWAL PADA PROYEK APARTEMEN Mirnayani Mirnayani; Armansyah Armansyah
Rekayasa Sipil Vol 5, No 1 (2016)
Publisher : Universitas Mercu Buana

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Keberhasilan pelaksanaan suatu proyek akan dikaitkan dengan sejauh mana ketiga sasaran proyek, yaitu biaya,waktu dan mutu dapat terpenuhi. Sehubungan dengan karakteristik proyek yang dinamis diperlukan pengelolaan proyek yang baik agar ketiga sasaran tersebut dapat terpenuhi. Dalam pembangunan Apartemen Easton Park terjadi keterlambatan dari jadwal awal. Tujuan penelitian ini adalah untuk menganalisis keterlambatan proyek dengan menggunakan konsep Earned Value Method dengan mengukur biaya dan jadwal. Earned Value Concept terdiri dari tiga indikator yaitu BCWS, BCWP, dan ACWP. Prosedur penelitian dimulai dengan melakukan studi kepustakaan, pengambilan data, melakukan pengamatan langsung pada proyek, dan merangkum hasil pengumpulan data-data yang ada. Hasil pembahasan menunjukkan nilai kinerja schedule proyek atau SPI sebesar 0.830 berarti proyek ini telah mengalami keterlambatan sebesar 10.005% dari rencana 95.587% dan realisasi 85.582%. Sedangkan dilihat dari segi kinerja biaya proyek nilai CPI sebesar 0.41 artinya biaya yang dikeluarkan cukup tinggi. Dari hasil analisa dapat diperkirakan biaya penyelesaian proyek sebesar Rp 194,487,569,560.821 sedangkan untuk waktu penyelesaian akhir pekerjaan didapat 1.023 hari
Peninjauan Kembali Lokasi Tower Crane pada Proyek Green Sedayu Apartemen Chika Puspita; Mirnayani Mirnayani; Mohamad F.N. Aulady
JURNAL TECNOSCIENZA Vol. 3 No. 1 (2018): TECNOSCIENZA
Publisher : JURNAL TECNOSCIENZA

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (314.674 KB)

Abstract

Latar belakang: Penggunaan Tower Crane (TC) sebagai alat berat pada proyek yang bersifat kompleks harus dipertimbangkan dengan baik. Ini dikarenakan penempatan TC dapat mempengaruhi kinerja proyek. Tujuan: Tujuan dari penelitian ini adalah untuk meninjau kembali posisi TC pada proyek Green Sedayu apartemen agar kinerja TC dapat maksimal. Metode: Penelitian ini menggunakan analisa terhadap supply point dan demand point. Kedua variabel tersebut dianalisis kedekatannya sehingga membentuk suatu kelompok pekerjaan. Hasil: Hasil penelitian menunjukkan dengan pergeseran posisi TC total waktu perjalanan pengait menjadi 7390,19 menit yang sebelumnya hanyalah 7435,31 menit. Simpulan: dengan pemindahan lokasi TC dapat mempercepat kinerja TC sehingga pembangunan apartemen akan berjalan dengan baik. Kata kunci: Kinerja, Tower Crane, Lebih baik
ANALYSIS OF THE MOTIVATION LEVEL OF CONSTRUCTION PROJECT WORKERS DURING THE COVID-19 PANDEMIC BASED ON MASLOW'S THEORY USING THE BAYESIAN BELIEF NETWORK METHOD Mirnayani; Lily Kholida
Jurnal Infrastruktur Vol 8 No 2 (2022): Jurnal Infrastruktur
Publisher : Jurnal Infrastruktur

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35814/infrastruktur.v8i2.3752

Abstract

Labor productivity is a very important factor in construction because it will affect the successful implementation of a construction project. Workers (labor) are human resources who are directly involved in construction projects from beginning to end and have a major influence on management in them. Worker motivation affects the productivity of workers, while the efforts made by workers are the physical embodiment of motivation. The higher the motivation of the worker, the greater the effort he makes. Maslow's theory is the basis of the theory of human needs. The emergence of the Covid-19 pandemic has made changes to life due to the new policies in force. This research will use a quantitative approach using the Bayesian Belief Network (BBN). The results showed that the percentage of the large motivation of construction project workers at the Jakarta Internasional Stadium project during the Covid-19 pandemic was 72.90 good and 27.10 bad. These results can be used as consideration for relevant agencies to carry out alternative strategies to increase worker motivation during the Covid-19 pandemic, so that worker productivity remains high.
Sosialisasi dan Pembuatan Biopori Yunita Dian Suwandari; Mirnayani Mirnayani; Nabila Nabila
Jurnal Pengabdian West Science Vol 3 No 06 (2024): Jurnal Pengabdian West Science
Publisher : Westscience Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.58812/jpws.v3i06.1213

Abstract

Sampah dan banjir merupakan hubungan sebab akibat suatu kondisi yang tidak menguntungkan bagi semua pihak, seperti kerugian ekonomi, kerusakan lingkungan, krisis air bersih, banyaknya penyakit yang muncul sampai timbulnya korban jiwa. Pada umumnya banjir terjadi karena selokan sudah tidak dapat lagi menampung volume air yang terjadi akibat curah hujan yang disebabkan antara lain adalah sampah. Banyaknya penduduk dan permukiman baru menghasilkan volume sampah yang besar setiap harinya, perlu dikelola dengan baik. Untuk mengurangi limbah sampah dapat diminimalkan dengan membuat perencanaan kapasitas volume sampah dan sumur resapan Biopori. Resapan Biopori merupakan teknologi tepat guna dan ramah lingkungan yang memiliki banyak manfaat antara lain meningkatkan muka air tanah, meningkatkan kualitas air tanah sebagai tempat pembuangan sampah, dan dapat mencegah timbulnya bencana banjir terutama di daerah perkotaan.
Perencanaan Kapasitas Volume Sampah dan Tahapan dalam Pengolahan Menggunakan Sumur Biopori Mirnayani, Mirnayani; Suwandari, Yunita Dian
WASANA NYATA Vol 8, No 1 (2024)
Publisher : STIE AUB Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36587/wasananyata.v8i1.1759

Abstract

Data Badan Pusat Statistik, kelurahan Meruya Selatan mempunyai luas wilayah 2,79 km² merupakan wilayah terkecil dari kecamatan Kembangan dengan jumlah penduduk yang terus meningkat sebesar 42,196 jiwa membuat wilayah ini hanya memiliki sedikit tempat terbuka, sedangkan volume sampah yang dihasilkan semakin banyak setiap harinya.  Permasalahan yang dihadapi oleh mitra Kelurahan Meruya Selatan adalah banyaknya produksi sampah setiap harinya yang belum diikuti dengan kesadaran masyarakat serta keterbatasan pengetahuan mengenai proses pengelolaan sampah yang baik menyebabkan permasalahan lingkungan seperti pencemaran dan banjir. Perencanaan kapasitas volume sampah dan pembuatan sumur resapan biopori merupakan salah satu solusi. Resapan Biopori merupakan teknologi tepat guna dan ramah lingkungan yang memiliki banyak manfaat antara lain meningkatkan muka air tanah, meningkatkan kualitas air tanah sebagai tempat pembuangan sampah, dan dapat mencegah timbulnya bencana banjir terutama di daerah perkotaan. Universitas Mercu Buana memberikan solusi edukasi melalui program pengabdian kepada masyarakat kelurahan Meruya Selatan yang merupakan mitra berupa kegiatan penyuluhan dan pelatihan mengenai perencanaan kapasitas volume sampah dan pembuatan sumur resapan biopori.  Kegiatan pelatihan dilaksanakan oleh dosen dan mahasiswa. Hasil pengabdian masyarakat yang telah dilakukan,  mitra merasa sangat puas dengan tingkat harapan sebesar 93% dan kepuasan mencapai 94%.
Analisis Kinerja Biaya Dan Waktu Dengan Konsep Earned Value Analysis Pada Masa Pandemi Covid-19 (Studi Kasus Proyek Pabrik Manufacture Automotive di Kawasan Industri Mitra Karawang Timur) Setyabudi, Prayogo Wisnu; Mirnayani, Mirnayani
Jurnal Teknik Sipil Vol 4, No 2 (2023)
Publisher : Institut Teknologi Adhi Tama Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31284/j.jts.2023.v4i2.4895

Abstract

Proyek konstruksi dimasa pandemi memiliki banyak sekali keterlambatan seperti contohnya pada proyek studi kasus berikut. Proyek terlambat dikarenakan keterlambatan pengiriman material pancang, dan terjadi pemberhentian sementara pekerjaan di karenakan penyebaran Covid – 19 yang semakin meningkat di area proyek. Tujuan penelitian ini adalah mengetahui kinerja proyek disaat terjadi pandemi, menganalisis faktor apa saja yang menjadi penyebab keterlambatan dan percepatan proyek, berapa perkiraan waktu dan biaya dalam pelaksanaan proyek di masa pandemi dan solusi untuk mengatasi permasalahan proyek di saat terjadi pandemi.Manajemen proyek melakukan percepatan dengan cara penambahan waktu pekerjaan dan pekerja untuk memitigasi keterlambatan tersebut. Biaya aktual pertambahan tersebut sekitar 3 % dari total rencana anggaran biaya. Solusi yang terbaik apabila ada pekerjaan di saat pandemi adalah memasukan biaya terkait pandemi dan juga jadwal pekerjaan yang ditambahkan agar tidak membebani kepada manajemen proyek.
Pendampingan Pengisian SPT Tahunan Melalui E-Filling Bagi UMKM Anggota “ACSB” Surakarta Suhardi, Edi; Fatonah, Siti; Susila, Linda Nur; Susanti, Nani Irma; Haryanto , Aris Tri; Mirnayani, Mirnayani
Jurnal Penelitian dan Pengabdian Masyarakat Vol. 2 No. 3 (2024): August 2024
Publisher : Yayasan Pondok Pesantren Sunan Bonang Tuban

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61231/jp2m.v2i3.278

Abstract

The purpose of community assistance activities is to provide socialization and assistance in filling the Annual Tax Return through E-Filling for 25 UMKM Members of ACSB Surakarta.  The activity was carried out on Tuesday, March 27, 2024 at the ACSB Surakarta office using the Participatory Learning and Action (PLA) method. Socialization and assistance on taxation provisions for MSMEs, procedures for submitting e-fin application forms, registering e-filling accounts and activating e-filling accounts to create e-filling accounts in organizing SPT 1770, SPT 1770s and SPT 1770ss and implementing online SPT filling in e-filling, so that MSMEs members of ACSB Surakarta can report their SPT. The results of mentoring activities participants can understand tax obligations, fill in the Annual Tax Return correctly, avoid delays in tax payments, and increase awareness about the importance of taxes.