PENYULUHAN PENGGUNAAN LISTRIK YANG AMAN DAN HEMAT BAGI MASYARAKAT BTN WAITATIRI DESA SULI KABUPATEN MALUKU Mbitu, Elisabeth Tansiana; Parera, Lory Marcus; Yesaya, Mey Chyntia; Salamony, Theny Daus
EBAMUKAI PAPUA JURNAL PENGABDIAN ILMU PENGETAHUAN DAN TEKNOLOGI
Publisher : Universitas Cenderawasih

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31957/ejpipt.v2i1.175

Abstract

Listrik memegang peranan penting dalam kehidupan sehari-hari. Dari penerangan hingga pengoperasian peralatan elektronik, Penyuluhan mengenai manfaat listrik dapat membantu meningkatkan kesadaran masyarakat dalam menggunakan listrik yang aman dan efisien. Listrik memiliki manfaat sebagai sumber energi yang bersih dan ramah lingkungan. Listrik juga memungkinkan adanya inovasi teknologi yang lebih canggih dan efisien dalam berbagai sektor seperti transportasi, komunikasi, dan industri. Dalam penyuluhan mengenai manfaat listrik, penting untuk juga memberikan informasi mengenai cara penggunaan listrik yang aman dan hemat. Mengajarkan tentang pentingnya mematikan peralatan listrik saat tidak digunakan, menggunakan peralatan listrik yang berkualitas dan hemat energi, serta melakukan perawatan secara berkala dapat membantu masyarakat untuk menggunakan listrik secara efisien. Dengan pemahaman yang baik mengenai manfaat listrik, diharapkan masyarakat dapat memanfaatkan sumber energi ini secara bijaksana demi kesejahteraan bersama dan keberlanjutan lingkungan.
Desain Pembangkit Listrik Tenaga Surya (PLTS) Off Grid Dusun I Negeri Hutumuri: Studi kasus di Negeri Hutumuri, Kecamatan Leitimur Selatan, Kota Ambon Matakena, Chelsya; Parera, Lory Marcus; Jamlaay, Marselin
JURNAL SIMETRIK Vol 15 No 2 (2025): Desember
Publisher : Pusat Penelitian dan Pengabdian Kepada Masyarakat (P3M) Politeknik Negeri Ambon

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/js.v15i2.3390

Abstract

This research aims to design an Off-Grid Solar Power Plant (PLTS) in Dusun I Negeri Hutumuri, to overcome the limited electricity supply from PLN, which often experiences periodic blackouts. Off-Grid PLTS was chosen as an alternative solution because it uses abundant solar energy in the region, is environmentally friendly, and does not depend on conventional power grids. This research begins with an analysis of the daily load requirements in Dusun I Negeri Hutumuri, which include household needs, public facilities such as schools and health centers, with total energy consumption reaching 605.064 kWh. In the design of this Off-Grid PLTS system, the main components used include solar modules, batteries, and inverters. The peak capacity required for this solar system is 172 kWp with a total energy of 168,073 Wh. Based on the calculation results, this system uses 210 solar modules connected in a series-parallel configuration, as well as five inverters with a capacity of 20 kW each. Keywords: PLTS Off-Grid, DOD, MPPT
RANCANGAN PLTS ATAP/ROOFTOP(ON GRID) MENGGUNAKAN PVSYST DI SPN PASSO Mahulette, Angela Carolina; Latupeirissa, Hamles L.; Parera, Lory Marcus
JURNAL SIMETRIK Vol 15 No 2 (2025): Desember
Publisher : Pusat Penelitian dan Pengabdian Kepada Masyarakat (P3M) Politeknik Negeri Ambon

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/js.v15i2.3389

Abstract

This study aims to design a rooftop Solar Power Plant (PLTS) system at the State Police School (SPN) Passo in Ambon using pvsyst software. This PLTS is designed with an on-grid system, connected to the PLN network, to utilize solar energy as a renewable energy source. The study began by collecting data on solar radiation intensity, daily energy consumption, and location characteristics such as roof area and orientation. This data was then processed using PVSyst to calculate the daily energy load, the required roof area, and the optimal solar panel capacity. The simulation results show that a PLTS system with a capacity of 41,27 kWp can meet the energy needs of SPN Passo, producing around 50,589 kWh per year with a Performance Ratio (PR) of around 80.87% This design is considered feasible with stable efficiency throughout the year, contributing to reducing energy consumption from PLN and supporting the use of environmentally friendly solar energy at SPN Passo. Keywords: PLTS ON GRID, Using PVSyst in SPN Passo
IMPLEMENTASI E-PRESENSI BERBASIS WEBSITE PADA DESA AKOON, DESA AMETH DAN DESA NALAHIA Parera , Josseano Amakora Koli; Alyona, Caryl; Parera, Lory Marcus
JURNAL PENGABDIAN MASYARAKAT JAMAK Vol. 8 No. 2 (2025): Desember
Publisher : Politeknik Negeri Ambon

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/jpmj.v8i2.3717

Abstract

Sistem e-presensi bagi desa Akoon, Ameth dan Nalahia merupakan solusi digital yang dirancang untuk meningkatkan efisiensi, akurasi, dan transparansi dalam pencatatan kehadiran aparatur desa serta pelaksana kegiatan desa. Sistem ini memanfaatkan teknologi informasi seperti autentikasi digital, geolokasi, dan basis data terpusat untuk memastikan proses presensi berlangsung secara real-time, mudah diakses, serta minim manipulasi. Melalui e-presensi, pemerintah desa Akoon, Ameth dan Nalahia dapat memantau tingkat kehadiran perangkat desa, mengelola jadwal kerja, dan menghasilkan laporan otomatis yang mendukung proses administrasi dan pengambilan keputusan. Implementasi sistem ini juga berperan dalam mendukung transformasi digital desa, meningkatkan akuntabilitas pelayanan publik, serta memperkuat tata kelola pemerintahan desa yang lebih modern, efektif, dan transparan.Kata kunci: e-presensi; geolokasi; realtime.
PERENCANAAN SISTEM KELISTRIKAN BERBASIS PLTS UNTUK MENINGKATKAN KETERSEDIAAN ENERGI DI DUSUN TAENO BAWAH Gandhy Keliwawa, Yasril Ihza; Yesaya, Mey Chyntia; Parera, Lory Marcus
Jurnal ELKO (Elektrikal dan Komputer) Vol. 6 No. 2 (2025): Jurnal Elko
Publisher : Politeknik Negeri Ambon

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54463/2v813f46

Abstract

Tidak dapat dipungkiri lagi bahwa peningkatan jumlah penduduk merupakan faktor yang paling mempengaruhi semakin tingginya kebutuhan energi di dunia.  Minyak bumi dan batubara saat ini masih menjadi sumber energi yang mendominasi, namun tidak terbantahkan lagi bahwa suatu saat cadangan minyak bumi dan batubara tersebut akan habis dikarenakan sumber energi tersebut adalah sumber daya alam yang tidak dapat diperbaharui. Teknologi pembangkit listrik tenaga surya (PLTS) merupakan  teknologi tepat guna untuk mengatasi ketersediaan pasokan listrik di masyarakat dan banyak digunakan didalam kehidupan manusia,seperti pompa air, alat pengering dan penangkap ikan, lampu penerangan jalan, solar home system dan lain-lain. Tujuan penelitian ini adalah Untuk menentukan kapasitas PLTS yang dibutuhkan untuk memenuhi kebutuhan tenaga listrik di Dusun Taeno Bawah. Metode penelitian yang digunakan dalam penelitian ini adalah analisis kuantitatif yang mana metode penelitian tersebut digunakan untuk menganalisa penelitian dengan data berupa angka-angka. Dari hasil analisis perencanaan dapat disimpulkan bahwa. Berdasarkan tabel perhitungan konsumsi energi peralatan listrik di Dusun Taeno Bawah total konsumsi energi keseluruhan 893013 Wh (893,01 kWh). Dengan kapasitas PLTS yaitu 241,029 kWp, Daya Puncak PLTS 265 kWp, Luas area efektif untuk penempatan PLTS-nya 1178 m2. Dengan jumlah modul PV yaitu 530 Unit. Kata kunci : perencanaan, pembangkit listrik tenaga surya,on grid