Pengaruh Peran Konsultan pada Performa Proyek Jalan di Kabupaten Dharmasraya Albar, Yuda E. D.; Yulius, Nursyaifi; Anif, Bahrul
Jurnal Civronlit Unbari Vol 9, No 2 (2024): Oktober
Publisher : Universitas Batanghari

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33087/civronlit.v9i2.136

Abstract

In the development of road infrastructure development, many are still found to be less than optimal in its implementation, not on time, and contract termination. One of them is road improvement work in Dharmasraya Regency. This study aims to identify the role of consultants in the performance of road projects in Dharmasraya Regency and to assess the most dominant role of consultants that influence the success of a road construction project. This research was conducted using a quantitative method. The data source uses primary data obtained from interviews and secondary data obtained from literature reviews. The research population was 81 respondents consisting of the owner, namely the Dharmasraya Regency PU Service, supervisory consultants, and implementing contractors involved in road construction and improvement projects in Dharmasraya Regency for the 2020 to 2022 budget years. The research sample used was the entire population. Data analysis techniques used factor analysis and multiple regression analysis. The results of the study found 61 sub-factors or variables that were the role of consultants in the successful implementation of road construction projects in Dharmasraya Regency. The dominant factor that is the role of consultants in controlling the implementation of road supervision in Dharmasraya Regency is the task factor with the sub-factor of coordinating all construction supervision personnel for each implementation of field measurements or engineering. The factors that are the role of consultants in controlling the implementation of road supervision in Dharmasraya Regency greatly influence costs, quality, and time with levels of influence reaching 48.3%; 56.8%; and 55.7% respectively.
Analisis Faktor Penyebab Waste Pada Proyek Konstruksi Jalan Di Kabupaten Kuantan Singingi Provinsi Riau Gemuruh, Gemuruh; Yulius, Nursyaifi; Wahyudi, Wahyudi
Jurnal Ilmiah Rekayasa Sipil Vol 21 No 2 (2024): Oktober 2024
Publisher : Pusat Penelitian dan Pengembangan Masyarakat (P3M), Politeknik Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30630/jirs.v21i2.1338

Abstract

One of the problems in working on construction projects is the occurrence of waste. One of them is a road project. The occurrence of waste in road projects is closely related to construction work methods, human resources, sorting and reuse processes. In connection with this potential waste, contractors must have a strategy to minimize this occurrence, because it can result in losses to the project and environmental sustainability. The aim of this research is to identify the dominant factors and causes of waste in road construction projects in Kuantan Singingi Regency, Riau. Next, provide solutions to overcome the occurrence of waste in road construction projects in Kuantan Singingi Regency, Riau. This study uses a quantitative method by distributing questionnaires to respondents and the results of respondents' answers are tested for assumptions, validity, reliability and factor analysis. Based on the identification results, the factors that cause waste in road construction projects are obtained, namely skill and supervision factors, work discipline factors, technical factors, equipment factors and information factors. Based on the analysis, the dominant factor causing waste in road construction projects in Kuantan Singingi Regency, Riau, is the skill and supervision factor with an extraction percentage value of 28.181% which consists of the variables of lack of workforce skills, late supervision, lack of foremen, and lack of complete contract documents. The solution to overcome the occurrence of waste in road construction projects is to maintain and maintain the implementation of supervision and assign personnel who have competence or experienced skills.