REDESIGN PEMBANGUNAN GEDUNG B TAHAP 1 RSUD HJ. ANNA LASMANAH BANJARNEGARA MENGGUNAKAN METODE BETON PRACETAK Faqih, Nasyiin; Purwati, Anika; Abdussalam, Ashal; Mushthofa, Mushthofa; Qomaruddin, Mochammad; Febrianty, Ruliana
Jurnal Penelitian dan Pengabdian Kepada Masyarakat UNSIQ Vol 11 No 2 (2024): Mei
Publisher : Lembaga Penelitian, Penerbitan dan Pengabdian Masyarakat (LP3M) UNSIQ

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32699/ppkm.v11i2.7147

Abstract

Seiring dengan terus meningkatnya perkembangan zaman populasi masyarakat juga ikut meningkat, ada beberapa masalah yang timbul di kota besar, salah satunya masalah kesehatan.. Dengan fasilitas yang sudah ada pada gedung lama (existing) kurang memadai, dalam hal ini Pihak RSUD terdorong untuk memberikan fasilitas yang lebih memadahi dengan dilakukannya pengadaan pembangunan gedung baru. Sebagai Studi Perencanaan pada Penelitian ini menggunakan metode beton pracetak.. Perencanaan merujuk pada pedoman yang berlaku di Indonesia yaitu SNI 03-1727-2020, SNI 1726-2019, SNI 2847-2019. Metodologi penelitian yang saya gunakan diawali dari tahap persiapan, pengumpulan data, menentukan desain bangunan dan pembebanan, Penentuan dimensi struktur, Analisa momen dengan menggunakan program SAP2000 v.14, pembuatan Gambar kerja perhitungan RAB struktur, dan diakhiri dengan Pembuatan Rencana Schedule.
STUDI LITERATUR HAMBATAN SOSIAL DAN BUDAYA PADA PENERAPAN BANGUNAN HIJAU Lendra, Lendra; Febrianty, Ruliana; Ghifari, Fazrial Ridha; Kurniawan, Rizkian; Naibaho, Oloan
Jurnal Kacapuri : Jurnal keilmuan Teknik Sipil Vol 7, No 2 (2024): Vol 7, No 2 2024 JURNAL KACAPURI : JURNAL KEILMUAN TEKNIK SIPIL (Edisi Desember
Publisher : Universitas Islam Kalimantan Muhammad Arsyad Al-Banjari Banjarmasin

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31602/jk.v7i2.15246

Abstract

Penelitian ini menggali hambatan sosial dan budaya yang menghalangi adopsi konsep bangunan hijau dalam industri konstruksi serta merancang strategi untuk mengatasi tantangan tersebut. Bangunan hijau, diakui sebagai strategi vital dalam mengurangi emisi karbon dan meningkatkan efisiensi energi. Namun, faktor-faktor seperti persepsi budaya yang menentang, kurangnya pemahaman masyarakat, minimnya edukasi formal, pola hidup yang kurang peduli lingkungan, serta dukungan pemerintah yang tidak memadai, semuanya menjadi penghalang signifikan. Studi ini menggunakan metode studi literatur dengan aplikasi perangkat lunak Publish or Perish untuk mencari dan mengevaluasi referensi yang relevan dari tahun 2018 hingga 2024. Hasilnya mengidentifikasi 25 faktor hambatan utama yang terbagi dalam kelompok Budaya dan Kebiasaan, Kesadaran dan Pemahaman, Sosialisasi dan Edukasi, Pola Hidup yang Kurang Peduli Lingkungan, serta Dukungan dan Komitmen Pemerintah. Hasil penelitian menyoroti kompleksitas hambatan ini dan menawarkan solusi potensial berupa kampanye edukasi yang lebih efektif, peningkatan pelatihan profesional, dan perbaikan kebijakan pemerintah. Penelitian ini diharapkan memberikan wawasan yang berguna bagi pembuat kebijakan, desainer, dan pemangku kepentingan industri untuk mengembangkan strategi yang dapat diterima secara budaya dalam mempromosikan bangunan hijau. Dengan mengintegrasikan elemen bangunan hijau ke dalam arsitektur vernakular dan mempertimbangkan konteks sosial dan budaya yang spesifik, diharapkan masyarakat dapat lebih menerima dan menerapkan praktik pembangunan berkelanjutan secara luas.
Impact of Green Building Implementation on Health and Well-being of Building Users in Indonesia Lendra, Lendra; Jesica, Jesica; Febrianty, Ruliana
Jurnal Presipitasi : Media Komunikasi dan Pengembangan Teknik Lingkungan Vol 22, No 1 (2025): March 2025
Publisher : Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.14710/presipitasi.v22i1.1-14

Abstract

This research conducts a systematic literature review, adopting the Preferred Reporting Items for Systematic Reviews and Meta-Analyses guidelines, to examine the impact of green building implementation on health and well-being of users in Indonesia. The aim is to systematically categorize and analyze both the positive and negative effects of green building practices on occupants while identifying specific challenges that influence occupant comfort and safety. After analyzing articles from 2018 to 2023, a total of 15 papers were identified as primary resources for this study. The research found that green buildings have both positive and negative impacts. Positive impacts include minimal air pollution, good natural lighting, cool natural ventilation, and reduced noise disturbance. There are negative impacts such as insufficient natural lighting and ventilation in some areas, high noise levels, and security issues. This research provides insights for improving green building concepts to better support public health and occupational safety. By considering these impacts, future building environments can be designed to be healthier and more conducive to promoting public health and well-being. Future research should address operational challenges by exploring hybrid systems that integrate natural and artificial elements for consistent comfort, along with innovative solutions for noise and wildlife control.
Pendampingan untuk Optimalisasi Kinerja Proyek Drainase: Produktivitas Alat Berat dan Kontribusi Terhadap Pembangunan Infrastruktur Lendra, Lendra; Febrianty, Ruliana; Perdian, Alprido
Sipakaraya : Jurnal Pengabdian Masyarakat Vol 4 No 1 (2025): Sipakaraya : Jurnal Pengabdian Masyarakat
Publisher : Universitas Sulawesi Barat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31605/sipakaraya.v4i1.5535

Abstract

Pengabdian kepada masyarakat ini bertujuan memberikan pendampingan kerja praktek mahasiswa Teknik Sipil pada proyek pembangunan drainase untuk meningkatkan kompetensi analisis produktivitas alat berat dan berkontribusi pada keberhasilan proyek infrastruktur. Kegiatan dilaksanakan selama enam bulan menggunakan pendekatan pembelajaran eksperiensial melalui orientasi proyek, pendampingan teknis konstruksi, analisis produktivitas alat berat, monitoring berkala, dan penyusunan laporan. Evaluasi pre-post test terhadap empat mahasiswa menunjukkan peningkatan kompetensi rata-rata 68,3%, dengan peningkatan tertinggi pada keterampilan analisis produktivitas (140%). Analisis produktivitas mengungkapkan semua alat berat (excavator standard, excavator long arm, dump truck, concrete mixer, dan concrete truck mixer) mencapai durasi kerja lebih cepat dari jadwal pelaksanaan, mengindikasikan perencanaan optimal. Kontribusi kegiatan meliputi dokumentasi sistematis, analisis terstruktur, dan identifikasi solusi permasalahan teknis. Tantangan utama mencakup koordinasi stakeholder, keterbatasan waktu pendampingan, dan akses data proyek. Pendampingan kerja praktek terbukti efektif meningkatkan kompetensi praktis, soft skills, dan pemahaman industri konstruksi, serta memberikan kontribusi positif terhadap optimalisasi proyek drainase.
REDESIGN PEMBANGUNAN GEDUNG B TAHAP 1 RSUD HJ. ANNA LASMANAH BANJARNEGARA MENGGUNAKAN METODE BETON PRACETAK Faqih, Nasyiin; Purwati, Anika; Abdussalam, Ashal; Mushthofa, Mushthofa; Qomaruddin, Mochammad; Febrianty, Ruliana
Jurnal Penelitian dan Pengabdian Kepada Masyarakat UNSIQ Vol 11 No 2 (2024): Mei
Publisher : Lembaga Penelitian, Penerbitan dan Pengabdian Masyarakat (LP3M) UNSIQ

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32699/ppkm.v11i2.7147

Abstract

Seiring dengan terus meningkatnya perkembangan zaman populasi masyarakat juga ikut meningkat, ada beberapa masalah yang timbul di kota besar, salah satunya masalah kesehatan.. Dengan fasilitas yang sudah ada pada gedung lama (existing) kurang memadai, dalam hal ini Pihak RSUD terdorong untuk memberikan fasilitas yang lebih memadahi dengan dilakukannya pengadaan pembangunan gedung baru. Sebagai Studi Perencanaan pada Penelitian ini menggunakan metode beton pracetak.. Perencanaan merujuk pada pedoman yang berlaku di Indonesia yaitu SNI 03-1727-2020, SNI 1726-2019, SNI 2847-2019. Metodologi penelitian yang saya gunakan diawali dari tahap persiapan, pengumpulan data, menentukan desain bangunan dan pembebanan, Penentuan dimensi struktur, Analisa momen dengan menggunakan program SAP2000 v.14, pembuatan Gambar kerja perhitungan RAB struktur, dan diakhiri dengan Pembuatan Rencana Schedule.