Claim Missing Document
Check
Articles

Found 12 Documents
Search

PENYULUHAN PENGGUNAAN FACEBOOK SEBAGAI MEDIA INTERNET MARKETING Donoriyanto, Dwi Sukma; Saputro, Erwan Adi; Widjajati, Endang Pudji; Indiyanto, Rus; Safirin, Moch Tutuk
JURNAL PENGABDIAN AL-IKHLAS UNIVERSITAS ISLAM KALIMANTAN MUHAMMAD ARSYAD AL BANJARY Vol 9, No 1 (2023): AL-IKHLAS JURNAL PENGABDIAN
Publisher : Universitas Islam kalimantan MAB

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31602/jpaiuniska.v9i1.11057

Abstract

Desa Kembangbelor merupakan salah satu Desa yang terletak di wilayah Kecamatan Pacet, Kabupaten Mojokerto. Sebagian masyarakat di Desa ini berprofesi sebagai petani. Salah satu komoditas yang dihasilkan yaitu ubi jalar. Sayangnya usaha untuk memasarkan produk olahan ubi jalar belum dibarengi dengan strategi pemasaran melalui internet karena kurangnya tingkat pemahaman dalam menggunakan aplikasi Facebook. Oleh karena itu kegiatan pengabdian masyarakat ini bertujuan untuk memberikan penyuluhan penggunaan Facebook sebagai media internet marketing kepada pelaku usaha produk olahan ubi jalar di Desa Kembangbelor. Metode yang digunakan adalah survei, penyuluhan dan evaluasi (obersvasi dan wawancara). Kegiatan ini berjalan dengan baik dan lancar. Peserta telah mampu menggunakan fitur-fitur yang ada di facebook seperti facebook ads, marketplace, page, messenger, beranda, status, dan grup.
Line Balancing Analysis Using Ranked Positional Weight and Region Approach Method in Nail Production Aji, Rindra Samawa; Widjajati, Endang Pudji
Journal La Multiapp Vol. 5 No. 3 (2024): Journal La Multiapp
Publisher : Newinera Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37899/journallamultiapp.v5i3.1361

Abstract

At the moment industrial development, there is open competition on a national and international scale, the manufacturing and service industry sectors are developing very quickly. To create good, quality products and efficiency, the company must have a good track balance. As is the case in nail production. CV. XYZ is a company engaged in manufacturing. This company is located in the city of Sidoarjo, East Java. The aim of this research is to improve the balance of the work station trajectory of the nail production process at CV. XYZ. The method used in this research is the Region Approach and ranked positional weight. The best method chosen for this problem is the Region Approach method, because this method has the greatest line efficiency (68.17%), the smallest balance delay (31.83%), and the smallest smoothes index (100.63), so this method was chosen as the best method and can improve line balancing conditions in the company. The increase in line efficiency from 54.68% using the company method to 68.17% using the Region Approach method can occur due to a reduction in the number of work stations from 5 work stations as well as a decrease in the number of smoothing indexes from 168.20 to 100.63. which indicates that there is an increase in balance between work stations.
Analysis lean and green manufacturing in the ship production process at PT XYZ Agustin, Alika Kurnia; Widjajati, Endang Pudji
Operations Excellence: Journal of Applied Industrial Engineering Vol. 16, No. 3 (2024): OE November 2024
Publisher : Universitas Mercu Buana

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22441/oe.2024.v16.i3.120

Abstract

The manufacturing industry, especially in sectors like shipbuilding, is experiencing rapid growth and heightened competition, necessitating ongoing enhancements in productivity and operational efficiency. PT XYZ, a prominent shipyard in Indonesia, is dedicated to advancing its business operations, which include new ship construction, maintenance, repair, and engineering consultancy. Despite these efforts, the company faces significant challenges in optimizing production processes, resulting in inefficiencies and potential delays in project delivery. This study examines waste in ship production processes at PT XYZ using lean manufacturing principles and proposes strategies for waste reduction through green manufacturing approaches. By identifying and addressing issues such as waiting times and inventory waste in fabrication workshops, the research seeks to boost operational efficiency and secure a competitive edge in the shipbuilding industry. The results reveal that implementing targeted improvements using VALSAT and other lean methodologies has markedly enhanced system efficiency. The identification and rectification of waste sources have led to increased production efficiency and improved product quality, demonstrating the effectiveness of these lean strategies in refining manufacturing operations.
PENYULUHAN STRATEGI PEMASARAN USAHA PRODUK MINUMAN HERBAL TELANG PANJARE DI DESA GUNUNG ANYAR Widjajati, Endang Pudji; Aryanny, Enny; Donoriyanto, Dwi Sukma
Jurnal Pengabdian Kolaborasi dan Inovasi IPTEKS Vol. 2 No. 2 (2024): April
Publisher : CV. Alina

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59407/jpki2.v2i2.630

Abstract

Dalam melakukan suatu usaha, dipelrukan strategi pemasaran yang tepat sesuai dengan target dan permintaan pasar agar usaha tersebut dapat menghasilkan keuntungan dan bertahan di tengah persaingan dengan produk kompetitor. Salah satu usaha yang dapat dijalankan oleh warga Desa Gunung Anyar, Surabaya adalah dengan memproduksi Minuman Herbal Telang PANJARE dan memasarkannya dengan memanfaatkan sosial media serta e-commerce. Kegiatan penyuluhan dilakukan oleh Tim Abdimas UPN “Veteran” Jawa Timur tidak hanya membahas tentang proses produksi, namun strategi pemasaran yang tepat meliputi penentuan segmentasi pasar, strategi bauran pemasaran, dan timing strategy. Selanjutnya akan diberikan contoh pembuatan business model canvas (BMC) yang bertujuan untuk mempermudah warga dalam memahami dan mengimplementasi metode strategi pemasaran yang tepat untuk usaha Minuman Herbal Telang PANJARE. Kata kunci: Minuman Herbal, Penyuluhan, Strategi Pemasaran
Analysis of Lean Manufacturing Implementation through the Single Minute Exchange of Dies (SMED) Method to Reduce Setup Time in the Injection Molding Machine Process Marcella, Sania; Widjajati, Endang Pudji
Journal of Applied Science, Engineering, Technology, and Education Vol. 6 No. 1 (2024)
Publisher : PT Mattawang Mediatama Solution

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35877/454RI.asci2698

Abstract

In an era of increasingly intense industrial competition, operational efficiency and reduced production time become the important factors to increase a company's competitiveness. The production improvement process must be carried out continuously to reduce waste in work methods and time. This research aims to analyze the implementation of lean manufacturing through the Single Minute Exchange of Dies (SMED) method in to reduce set-up time in the injection machine of molding process on CV. XYZ. Lean manufacturing refers to a systematic approach for identifying and eliminating waste through continuous improvement, emphasizing the efficiency and effectiveness of production processes. The research results indicate that implementing SMED significantly reduces set-up time of molding injection machine, increasing productivity, and reducing production downtime. It was obtained a decrease in set-up time by 16.68%, where the mattress replacement time was successfully shortened to 236.96 minutes from the previous 197.44 minutes. Implementation of SMED in CV. XYZ succeeded in identifying internal and external activities that could be simplified or eliminated, as well as optimizing work preparation and completion steps. This can be concluded that the implementation of lean manufacturing through the SMED method is effective in increasing operational efficiency and providing added value for the company.
Line Balancing Analysis Using Ranked Positional Weight and Region Approach Methods on Broad Plate Production Line Rizki Rahmantto, Muhammad; Widjajati, Endang Pudji
Journal La Multiapp Vol. 6 No. 1 (2025): Journal La Multiapp
Publisher : Newinera Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37899/journallamultiapp.v6i1.1767

Abstract

PT. Risa Implantama is a company engaged in the production of bone implants that focuses on the production of bone pins and screws. This company produces bone pins with various types and then markets the production results through distributors and also produces goods according to incoming orders, both from distributors and hospitals. Rapid advances in medical science and technology have significantly improved the quality and longevity of human life. The field of orthopedics in the world of medicine has also experienced technological advances in dealing with various cases in its field, one of which is bone fractures. Based on initial calculations, the line efficiency was 51.07%, then the balance delay was 48.93% and the idle time was 1.90 minutes. After processing the data using the ranked positional weight method for the line efficiency of the broad plate production process, the line efficiency results were 64.42%, then the balance delay was 35.58% and the idle time was 14.64 minutes. Furthermore, after data processing using the region approach method for the line efficiency of the broad plate production process, the line efficiency results were 54.47%, then for the balance delay of 45.53% and idle time of 14.64 minutes. Based on the calculation results, the Ranked Positional Weight (RPW) method is the optimal method in solving line balancing, because it has the highest Line Efficiency (LE) value and the lowest Balance Delay (BD).
Proposed Preventive Maintenance of Air Screw Compressor Machine Using Failure Mode and Effect Analysis and Modularity Design Methods at PT XYZ Susilo, Dave Dee; Widjajati, Endang Pudji
IJIEM - Indonesian Journal of Industrial Engineering and Management Vol 5, No 3: October 2024
Publisher : Program Pascasarjana Magister Teknik Industri Universitas Mercu Buana

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22441/ijiem.v5i3.23742

Abstract

Current developments in the industrial world made competition between companies increasingly tight. This required companies to increase the effectiveness and efficiency of their production processes, one of which was by implementing proper machine maintenance so that the machines used could operate well and optimally. PT XYZ is a company engaged in the manufacturing industry which is engaged in making hydrogen peroxide chemical liquid in Indonesia. This company experienced problems with damage to its air screw compressor machine because the maintenance system was carried out when components were damaged, resulting in long downtime. Therefore, this research was carried out with the aim of providing preventive maintenance suggestions using the failure mode and effect analysis (FMEA) method to find critical components of the machine and modularity design to group machine components so as to reduce downtime and minimize maintenance costs. By implementing preventive maintenance with FMEA and modularity design, ten critical sub-components were obtained with a total maintenance cost of IDR 884,839,695, lower than the company's current total maintenance cost of IDR 1,513,836,000. So by applying the proposed method, the company gets an efficiency of 41.55%.
Penerapan Metode Lean Warehousing dalam Analisis Pemborosan pada Proses Aliran Pergudangan Putra, Wiedy Irawan; Widjajati, Endang Pudji
Ekonomis: Journal of Economics and Business Vol 9, No 2 (2025): September
Publisher : Universitas Batanghari Jambi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33087/ekonomis.v9i2.1971

Abstract

PT. XYZ is one of the leading manufacturers of ceramic tiles for walls and floors. The application of the lean warehousing method is carried out using Value Stream Mapping to map each flow of the process that occurs in warehousing activities. Determining the weight of each waste that occurs using the Waste Assessment Model (WAM) method. The results of the study show the order of waste or waste from the highest to the lowest percentage, namely defects are 20.15%, overproduction is 17.44%, unnecessary motion is 16.86%, unnecessary inventory is 16.78%, transportation is 11.55%, waiting is 11.33% and unappropriate processing is 5.88%. The three types of waste with the highest frequency of values in the warehousing flow process are waste defects with a value of 20.15%, waste overproduction with a value of 17.44%, and waste unnecessary motion with a value of 16.86%, unnecessary inventory 16.78%. The results of the activity simplification obtained a total number of activities which previously amounted to 30 activities to 24 activities with an initial lead time of 19428 seconds and a lead time after improvement of 14100 seconds, so there is a time efficiency of 5328 seconds from the previous time.
The Analysis of the Redesign of the Rice Storage Warehouse Layout Using the Shared Storage Method at PT. XYZ Awwali, Fariq; Widjajati, Endang Pudji
Advance Sustainable Science Engineering and Technology Vol. 6 No. 3 (2024): May - July
Publisher : Science and Technology Research Centre Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/asset.v6i3.626

Abstract

In the manufacturing industry, problems often occur with warehouse layout arrangements. A finished product warehouse that is not arranged based on a good warehouse layout designer will experience difficulties in operating the product entry and exit process and is not based on the capacity of the warehouse itself. Increasingly advanced industry and increasingly fierce business competition encourage. The problems that occurred in the 4C Warehouse of the PT.XYZ Complex were in the storage warehouse and the placement of rice, causing several problems in the process of loading and unloading goods. PT.XYZ uses the Shared Storage method to arrange the warehouse space layout using the FIFO (First In First Out) principle, namely where products that are quickly sent are placed in the storage area closest to the entrance and exit. Data collection was carried out through observation, interviews and literature study. Data is calculated and analyzed by comparing the total distance of the initial layout and the proposed layout. The research results show that the total distance of the proposed layout is smaller than the initial layout with a total distance of 617,7.
The Analysis of Bottle Warehouse Facility Layout Design Using the System Layout Planning Method (SLP) Using Software Craft In PT.XYZ Nugraha, Nayandra Agustira; Widjajati, Endang Pudji
Advance Sustainable Science Engineering and Technology Vol. 6 No. 3 (2024): May - July
Publisher : Science and Technology Research Centre Universitas PGRI Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26877/asset.v6i3.628

Abstract

Increasingly advanced industry and increasingly fierce business competition encourage companies to improve employee work output and supporting facilities, including warehouses. PT. XYZ, a bottled water manufacturing company, is facing inefficiencies in its bottle warehouse. The initial layout was not optimal, with less than optimal space utilization and high moving costs. This causes obstruction to the smooth flow of materials and products, as well as reduced productivity. This research aims to redesign the layout of PT's bottle warehouse facilities. Atlantic Biruraya uses the Systematic Layout Planning (SLP) method to maximize productivity. The SLP method was used to redesign the layout of the bottle warehouse by considering factors such as material flow, space requirements and efficiency. Data was collected through observation, interviews and literature study. Data were analyzed using SLP software. The research results show that the new layout can increase productivity by reducing total costs by IDR 90.439. With the results of the proposed layout that has been created using craft software, the company can maximize productivity because the costs and distances required have been optimized using the Layout Planning System method using craft software.