Claim Missing Document
Check
Articles

Found 2 Documents
Search

KINERJA PEGAWAI DALAM MEMBERIKAN PELAYANAN KESEHATAN PADA PASIEN GANGGUAN JIWA DI RUMAH SAKIT JIWA PROVINSI SULAWESI TENGGARA Mila, Wa; Justawan, H.; Manguntara, La
REZ PUBLICA Vol 6, No 1 (2020): March - May
Publisher : Universitas Halu Oleo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33772/rzp.v6i1.13555

Abstract

This research is a descriptive qualitative study, as many as five informants in this study. Data collection techniques are direct observation and direct interviews. As for the data analysis used data reduction, data presentation, draw conclusions.The results of this study indicate that the performance of employees in providing services to mental patients in the Southeast Sulawesi Provincial Mental Hospital can be quite good. Said to be quite good because of the 4 indicators of performance achievement  (quality, quantity, timeliness, an work commitment) only 1 indicator that is fully in line with community expectations, namely the quality indicator. While the indicators of quality, timeliness, and work commitment are still said to be poor because there are still complaints from the community. While the quality of health services in the Mental Hospital of Southeast Sulawesi Province is included in the good category. Becauce of the 5 aspects of service quality (physical appearance, responsiveness, reliability, assurance, and empathy)  only 1 indicator does not meet the expectations of the community, namely the asspect of physical appearance.
Analisis Penjadwalan Pelaksanaan Gedung Pengadilan Negeri Dataran Hunipopu Klas II Menggunakan Metode CPM: Analysis of Scheduling Implementation of the Hunipopu Plain District Court Building Klas II Using the CPM Method Mila, Wa; Saleh, La Mohamat; Abdin, Maslan
LITERA: Jurnal Ilmiah Mutidisiplin Vol. 1 No. 2 (2024): LITERA: Jurnal Ilmiah Multidisiplin
Publisher : Litera Academica Publishing

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

A work network is a flow diagram visualization of the sequence, relationships and dependencies of each activity that must be fulfilled to complete the project. The work network describes the project activities that must be carried out, the logical sequence of activities, the dependencies between activities, the timing of activities through the critical path. By planning a work network, an analysis can be carried out on the project completion time schedule, problems that may arise if delays occur, the probability of project completion, the costs required to speed up project completion and so on. This research aims to determine the work that is referred to as the critical trajectory of the implementation of the construction of the Plains Hunipopu Class II District Court Building. This research carries out schedule planning using the CPM method. CPM (Critical path Method) assumes that the activity time is known with certainty so that only one time factor is needed for each activity. The research results show that in scheduling using the Critical Path Method (CPM) there is 1 critical path, namely A, B, C, F, L, P, Q, R (2+4+11+5+5+4+4+4= 39). From the calculation results, it was obtained that the project implementation time was 39 working weeks. Meanwhile, the planned scheduling is 43 working weeks. So it can be concluded that with the CPM method project work is 4 weeks faster with a time efficiency of 9.30%.