PERENCANAAN GEDUNG PARKIR MOBIL TERMINAL DOMESTIK DI BANDAR UDARA I GUSTI NGURAH RAI BALI Friska Mandasari; Oka Fatra; Djoko Priambodo
Langit Biru: Jurnal Ilmiah Aviasi Vol 12 No 2 (2019): Langit Biru: Jurnal Ilmiah Aviasi
Publisher : Politeknik Penerbangan Indonesia Curug

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1289.13 KB)

Abstract

The design of the car parking area at I Gusti Ngurah Rai Airport cannot accommodate the total number of vehicles. To overcome this problem, it is necessary to build a car park building area in the domestic terminal. Plans for the construction of a parking building with an area of 6,656 m2, the design of a 90 ° parking angle, a building with a reinforced concrete structure and consisting of two floors. The beam dimensions are 650 mm x 500 mm, column dimensions are 500 mm x 500 mm and plate thickness is 200 mm. The foundation used is a pile foundation with a depth of 6 m and dimensions of 450 mm x 450 mm. The parking building can accommodate four-wheeled vehicles as many as 763 vehicles in 2027. In planning car parking buildings, data are used including the results of land sundir, the number of domestic passengers at busy times. Analysis of calculations using the application design and structure of SAP2000 Version20
PERENCANAAN JALAN INSPEKSI DARI TERMINAL EKSISTING KE TERMINAL BARU DI SISI TIMUR RUNWAY 31 BANDAR UDARA INTERNASIONAL AHMAD YANI SEMARANG Jesida Alfiyana; Djoko Priambodo; Oka Fatra
Langit Biru: Jurnal Ilmiah Aviasi Vol 12 No 3 (2019): Langit Biru: Jurnal Ilmiah Aviasi
Publisher : Politeknik Penerbangan Indonesia Curug

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1709.116 KB)

Abstract

The condition of the inspection road at Ahmad Yani International Airport Semarang currently only has inspection roads on the west side of runway 13 with an inadequate width of road to be passed by inspection vehicles and the absence of inspection roads in the east side of the runway 31. New road inspection planning is needed on the east side of runway 31 using a flexible pavement type with Component Analysis calculation method and geometric planning of the road using the rules for the Procedure for Inter-City Road Geometric Planning No.038 / TBM / 1997. From the results of the calculation analysis, the thickness of the road for the age of 10 years 34.125cm with surface layer 4.125cm, basecourse layer 20cm and subbase layer 10cm. The thickness of the planned 20 year old road 35.50cm with a layer surface 5.5cm, the basecourse layer 20cm and the subbase layer 10cm. The plan speed is 60km/h, the road length is 1903m and the road width is 2 x 2.75m (5.5m) consisting of 2 2-way lanes. Transverse slope of 2%, road shoulder 3% and width of drainage channel 0.5m. For the results of road geometric planning, the road inspection conditions at Ahmad Yani International Airport Semarang currently only have inspection roads on the west side of runway 13 with 5 bends with Spiral - Spiral and Spiral - Circle - Spiral types with widening at each bend of 3.17m.
NORMALISASI DRAINASE APRON B-C DI BANDAR UDARA HUSEIN SASTRANEGARA BANDUNG Agie Santoso Margono; Djoko Priambodo; Oka Fatra
Langit Biru: Jurnal Ilmiah Aviasi Vol 11 No 3 (2018): Langit Biru: Jurnal Ilmiah Aviasi
Publisher : Politeknik Penerbangan Indonesia Curug

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (761.353 KB)

Abstract

Right now, Husein Sastranegara International Airport have a drainage problem, clogged frequent, flooded, and some parts of trails cover are damaged because it is age in Apron B-C Airside. Therefore have to repair it, them is drainage trails cover change, clean the sediment so there is no clogged anymore. In the to make the drainage system condition (2015 KP 39 or FAA AC 150_5320_5c). The daily rain maximum data obtained from BMKG rain station location in Husein Sastranegara International Airport for the total if 30 years. This rain data will processed of analysis top of flood debit. Meanwhile, the new drainage model using a closed channel using a box culvert precast with 90 x 90 x 9 dimension. To accommodate drainage channel inlet, will create an open channel segment which is in same time serves as man hole using u-ditch precast followed cover from hollow steel. This inlet or man hole are placed every 50 meter.
Pemberdayaan Pemuda Karang Taruna di Kelurahan Cipedak Jagakarsa Melalui Pelatihan Instalasi Listrik Rumah Sederhana Irmayani Irmayani; Djoko Priambodo; Achmad Muhyidin Arifai; Muhamad Alvin Aufar; M. Fahmi Arsyad; Heriyanto Wibowo; Agus Nugroho; Gendoet Indarto Wibisono; Haniva Mulyani
ASPIRASI : Publikasi Hasil Pengabdian dan Kegiatan Masyarakat Vol. 1 No. 3 (2023): Mei : Publikasi Hasil Pengabdian dan Kegiatan Masyarakat
Publisher : Asosiasi Periset Bahasa Sastra Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/aspirasi.v1i1.1663

Abstract

This community service activity aims to empower the youth of Karang Taruna in Rukun Warga 06, Cipedak area, Jagakarsa, South Jakarta, through training in basic home electrical installation. The empowerment initiative is expected to enhance the participants’ technical skills and economic independence in facing the challenges of the job market, particularly in the electrical sector, which offers broad prospects. The implementation methods include material delivery/counseling sessions, hands-on practical training, and participant skill evaluation. The results of the activity show an increase in participants' understanding of basic electrical installation and adequate practical skills applicable at the household level. Participant success was assessed based on their ability to assemble electrical circuits and conduct electricity through prepared media, as indicated by the illumination of light bulbs in each installed circuit. This activity has had a positive impact in shaping more productive youth who are ready to compete in the workforce, while also contributing to community-based local development. The results of the counseling and training on electrical installation for simple houses showed that 80% of the participants were able to carry out residential electrical installations properly and in accordance with the PUIL 2000 standards.