A'ang Subiyakto
Syarif Hidayatullah State Islamic University Jakarta

Published : 7 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 7 Documents
Search

Measurement of Information System Project Success Based on Perceptions of the Internal Stakeholders A'ang Subiyakto; Abd. Rahman Ahlan; Mira Kartiwi; Husni Teja Sukmana
International Journal of Electrical and Computer Engineering (IJECE) Vol 5, No 2: April 2015
Publisher : Institute of Advanced Engineering and Science

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (338.318 KB) | DOI: 10.11591/ijece.v5i2.pp271-279

Abstract

In this research, adoption of the DeLone and McLean (D&M) information system (IS) success model and its adaptation with the project success theories were used to explore state of IS project success and to examine factors which affect its success. A survey towards the internal project stakeholder in an univerity with response rate 48% was carried out to collect the raw data for Partial Least Squares Structural Equation Modeling (PLS-SEM) analysis. Majority of the participants (80.7%) stated that level of the project success is more than 50% where information quality, system quality, service quality, system use, and user satisfaction substantially explain 64.5% of variance in the success variable. The three quality factors together explain 43.2% of the variance of system use and 70.4% of the variance of user satisfaction. Although, a number of the findings were consistent with the prior studies, these findings also presented inconsistencies especially related to aspects of information quality and system use. Accordingly, researchers and practitioners will be stand to benefit from the information provided in this study and it is hoped that future research will build upon the findings reported herein as efforts are made to attain the IS project success especially in the sampled institution.
Influences of the Input Factors towards Success of An Information System Project A'ang Subiyakto; Abd. Rahman Ahlan; Mira Kartiwi; Husni Teja Sukmana
TELKOMNIKA (Telecommunication Computing Electronics and Control) Vol 13, No 2: June 2015
Publisher : Universitas Ahmad Dahlan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12928/telkomnika.v13i2.1323

Abstract

This study examines the input factors that were reputed theoretically affecting the information system (IS) project success in term of the processional and causal perspectives. Adopting three of the four dimensions from the McLeod and MacDonell’s (M&M’s) classification project framework dimensions, the study is initiated by inviting the internal project stakeholders in a sampled institution. A stratified sampling then identified 130 people who experienced in the projects as the sample, contacted 90 of the samples via e-mail and  distributed the paper-based questionnaire into 40 certain people especially who are on the managerial level. A number of 62 (48%) valid responses, then were analyzed using the partial least squares-structural equation modeling  (PLS-SEM) software, i.e. SmartPLS. The significances of the whole path coefficients, the acceptances of the overall hypotheses, the relevances of the three predictors relevances, and the moderate coefficient determination of the IS project success variable may present acceptability of the proposed model for the subsequent studies.
Managers Perceptions towards the Success of E-performance Reporting System A'ang Subiyakto; Ditha Septiandani; Evy Nurmiati; Yusuf Durachman; Mira Kartiwi; Abd. Rahman Ahlan
TELKOMNIKA (Telecommunication Computing Electronics and Control) Vol 15, No 3: September 2017
Publisher : Universitas Ahmad Dahlan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12928/telkomnika.v15i3.5133

Abstract

Managers are the key informants in the information system (IS) success measurements. In fact, besides the determinant agents are rarely involved in the assessments, most of the measurements are also often performed by the technical stakeholders of the systems. Therefore, the results may questionable. This study was carried to explain the factors that influence the success of an e-performance reporting system in an Indonesian university by involving ± 70% of the managers (n=66) in the sampled institution. The DeLone and McLean model was adopted and adapted here following the suggestions of the previous meta-analysis studies. The collected data was analyzed using the partial least squares-structural equation modelling (PLS-SEM) for examining the four hypotheses. Despite the findings revealed acceptances of the overall hypotheses, the weak explanation of the user satisfaction variable towards the net benefit one had been the highlighted point. Besides the study limitations, the point may also be the practical and theoretical considerations for the next studies, especially for the IS success studies in Indonesia
A Coherent Framework for Understanding the Success of an Information System Project Syopiansyah Jaya Putra; A'ang Subiyakto; Abd. Rahman Ahlan; Mira Kartiwi
TELKOMNIKA (Telecommunication Computing Electronics and Control) Vol 14, No 1: March 2016
Publisher : Universitas Ahmad Dahlan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12928/telkomnika.v14i1.2711

Abstract

This paper elucidates the sequential revisions of an information system (IS) project framework across the research model development and its examinations. The authors adopted, adapted, and combined five concepts of the project management discipline and the information processing theory to revise the framework. Besides the use of this multi-dimensional perspective, the authors were also succeeded to present an interrelation between the framework and the examined model within a coherent representation. It was one of the essential points of this model development study, in particular for presenting the research focus. It may be trivial issue for the experts in the research fields, but the coherent illustration is one of the critical issues in the validity measurement of a model, whereas the inexpert ones may need a guideline to represent the interrelationship. Such points became the main contribution of this study to fill the gap in the literatures, particularly in the lack of comprehensive detail of a research model development.
An Alternative Method for Determining Critical Success Factors of Information System Project A'ang Subiyakto; Abdul Rahman Ahlan; Husni Teja Sukmana
TELKOMNIKA (Telecommunication Computing Electronics and Control) Vol 12, No 3: September 2014
Publisher : Universitas Ahmad Dahlan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12928/telkomnika.v12i3.105

Abstract

Historically, scholars have been determining deductively critical success factors (CSFs) since the end 1970s. Meanwhile, most of researchers in the information system (IS) project performance studies have been performing inductively this process. Definitely, each of both methods has strengths and weaknesses, but we argue that researchers and practitioners will get an alternative choice if both methods are combined for sharing the caracteristics. This study is conducted to respond this issue. Authors combined both methods using a compatibility analysis to inprove the result validity. This paper contributes to the debates on ensuring the interrelationship between the project succes criteria and their CSFs, incorporating the new factors, decomposing complexity of the project, and understanding focus of the stakeholders in the IS project environment. Although, the proposed method is only a combination of both previous methods, but this proposition is proposed together with a case study to prove its implementation feasibility
Implementation of Input-Process-Output Model for Measuring Information System Project Success A'ang Subiyakto; Abd. Rahman Ahlan
Indonesian Journal of Electrical Engineering and Computer Science Vol 12, No 7: July 2014
Publisher : Institute of Advanced Engineering and Science

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.11591/ijeecs.v12.i7.pp5603-5612

Abstract

Measurement of the information system (IS) project success has become the interesting topic for researchers and practitioners since the Standish Group published their findings in 1994.  Project success theory is the main concept in this topic, but this theory is still an ambiguous concept and lack in agreement among researchers and practitioners. They are also still tend to focus on single or partial dimension. Therefore, they did not get a clear picture of the system measurements. This study developed an alternative model of the project success measurement based on input-process-output (IPO) model. The development was conducted using comparison, adoption, adaptation, and combination the previous theories and models: Davis's IPO model, the project success theories, Delone and McLean' model, and the project classificatory framework. As indicated in most studies that most of models are developed using the previous theories and models rather than on empirical proofs. The result is a IS project success model consisting of 9 variables and 36 relationships among the variables. Although, the model is only a conceptual model, but it was developed completely and coherently considering three main aspects of project success measurement, namely: processional and causal models, project success theories, and the influence concept of project environment.
The Information System Project Profiles among Universities in Indonesia A'ang Subiyakto; Abd. Rahman Ahlan; Mira Kartiwi; Nashrul Hakiem; Muhammad Qomarul Huda; Aries Susanto
Indonesian Journal of Electrical Engineering and Computer Science Vol 12, No 2: November 2018
Publisher : Institute of Advanced Engineering and Science

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.11591/ijeecs.v12.i2.pp865-872

Abstract

Information system (IS) utilizations may have been one of the determinant factors for the survival requirement of the higher education sector in Indonesia. Despite the IS projects have been conducted since the 1980s in this country, but many studies indicated that success of the projects seems like in the low level. This survey study was purposed to know the status of the IS project success among universities by involving the internal stakeholders. The higher education database of the Ministry of Research, Technology, and Higher Education (MRTHE) and the Association of Computing and Informatics Institutions Indonesia (ASCII-I) in the year 2015 were used for selecting around 1.230 respondents based on a purposive random sampling. The blended questionnaires were then distributed with almost 298 (±24%) responses. This paper presents five project profiles, including the aim, IS strategic plan availability, internal team involvement, budget allocation, and the success level of the projects.