A'ang Subiyakto
Syarif Hidayatullah State Islamic University Jakarta

Published : 7 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search
Journal : Indonesian Journal of Electrical Engineering and Computer Science

Implementation of Input-Process-Output Model for Measuring Information System Project Success A'ang Subiyakto; Abd. Rahman Ahlan
Indonesian Journal of Electrical Engineering and Computer Science Vol 12, No 7: July 2014
Publisher : Institute of Advanced Engineering and Science

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.11591/ijeecs.v12.i7.pp5603-5612

Abstract

Measurement of the information system (IS) project success has become the interesting topic for researchers and practitioners since the Standish Group published their findings in 1994.  Project success theory is the main concept in this topic, but this theory is still an ambiguous concept and lack in agreement among researchers and practitioners. They are also still tend to focus on single or partial dimension. Therefore, they did not get a clear picture of the system measurements. This study developed an alternative model of the project success measurement based on input-process-output (IPO) model. The development was conducted using comparison, adoption, adaptation, and combination the previous theories and models: Davis's IPO model, the project success theories, Delone and McLean' model, and the project classificatory framework. As indicated in most studies that most of models are developed using the previous theories and models rather than on empirical proofs. The result is a IS project success model consisting of 9 variables and 36 relationships among the variables. Although, the model is only a conceptual model, but it was developed completely and coherently considering three main aspects of project success measurement, namely: processional and causal models, project success theories, and the influence concept of project environment.
The Information System Project Profiles among Universities in Indonesia A'ang Subiyakto; Abd. Rahman Ahlan; Mira Kartiwi; Nashrul Hakiem; Muhammad Qomarul Huda; Aries Susanto
Indonesian Journal of Electrical Engineering and Computer Science Vol 12, No 2: November 2018
Publisher : Institute of Advanced Engineering and Science

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.11591/ijeecs.v12.i2.pp865-872

Abstract

Information system (IS) utilizations may have been one of the determinant factors for the survival requirement of the higher education sector in Indonesia. Despite the IS projects have been conducted since the 1980s in this country, but many studies indicated that success of the projects seems like in the low level. This survey study was purposed to know the status of the IS project success among universities by involving the internal stakeholders. The higher education database of the Ministry of Research, Technology, and Higher Education (MRTHE) and the Association of Computing and Informatics Institutions Indonesia (ASCII-I) in the year 2015 were used for selecting around 1.230 respondents based on a purposive random sampling. The blended questionnaires were then distributed with almost 298 (±24%) responses. This paper presents five project profiles, including the aim, IS strategic plan availability, internal team involvement, budget allocation, and the success level of the projects.