A'ang Subiyakto
Syarif Hidayatullah State Islamic University Jakarta

Published : 7 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 4 Documents
Search
Journal : TELKOMNIKA (Telecommunication Computing Electronics and Control)

Influences of the Input Factors towards Success of An Information System Project A'ang Subiyakto; Abd. Rahman Ahlan; Mira Kartiwi; Husni Teja Sukmana
TELKOMNIKA (Telecommunication Computing Electronics and Control) Vol 13, No 2: June 2015
Publisher : Universitas Ahmad Dahlan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12928/telkomnika.v13i2.1323

Abstract

This study examines the input factors that were reputed theoretically affecting the information system (IS) project success in term of the processional and causal perspectives. Adopting three of the four dimensions from the McLeod and MacDonell’s (M&M’s) classification project framework dimensions, the study is initiated by inviting the internal project stakeholders in a sampled institution. A stratified sampling then identified 130 people who experienced in the projects as the sample, contacted 90 of the samples via e-mail and  distributed the paper-based questionnaire into 40 certain people especially who are on the managerial level. A number of 62 (48%) valid responses, then were analyzed using the partial least squares-structural equation modeling  (PLS-SEM) software, i.e. SmartPLS. The significances of the whole path coefficients, the acceptances of the overall hypotheses, the relevances of the three predictors relevances, and the moderate coefficient determination of the IS project success variable may present acceptability of the proposed model for the subsequent studies.
Managers Perceptions towards the Success of E-performance Reporting System A'ang Subiyakto; Ditha Septiandani; Evy Nurmiati; Yusuf Durachman; Mira Kartiwi; Abd. Rahman Ahlan
TELKOMNIKA (Telecommunication Computing Electronics and Control) Vol 15, No 3: September 2017
Publisher : Universitas Ahmad Dahlan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12928/telkomnika.v15i3.5133

Abstract

Managers are the key informants in the information system (IS) success measurements. In fact, besides the determinant agents are rarely involved in the assessments, most of the measurements are also often performed by the technical stakeholders of the systems. Therefore, the results may questionable. This study was carried to explain the factors that influence the success of an e-performance reporting system in an Indonesian university by involving ± 70% of the managers (n=66) in the sampled institution. The DeLone and McLean model was adopted and adapted here following the suggestions of the previous meta-analysis studies. The collected data was analyzed using the partial least squares-structural equation modelling (PLS-SEM) for examining the four hypotheses. Despite the findings revealed acceptances of the overall hypotheses, the weak explanation of the user satisfaction variable towards the net benefit one had been the highlighted point. Besides the study limitations, the point may also be the practical and theoretical considerations for the next studies, especially for the IS success studies in Indonesia
A Coherent Framework for Understanding the Success of an Information System Project Syopiansyah Jaya Putra; A'ang Subiyakto; Abd. Rahman Ahlan; Mira Kartiwi
TELKOMNIKA (Telecommunication Computing Electronics and Control) Vol 14, No 1: March 2016
Publisher : Universitas Ahmad Dahlan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12928/telkomnika.v14i1.2711

Abstract

This paper elucidates the sequential revisions of an information system (IS) project framework across the research model development and its examinations. The authors adopted, adapted, and combined five concepts of the project management discipline and the information processing theory to revise the framework. Besides the use of this multi-dimensional perspective, the authors were also succeeded to present an interrelation between the framework and the examined model within a coherent representation. It was one of the essential points of this model development study, in particular for presenting the research focus. It may be trivial issue for the experts in the research fields, but the coherent illustration is one of the critical issues in the validity measurement of a model, whereas the inexpert ones may need a guideline to represent the interrelationship. Such points became the main contribution of this study to fill the gap in the literatures, particularly in the lack of comprehensive detail of a research model development.
An Alternative Method for Determining Critical Success Factors of Information System Project A'ang Subiyakto; Abdul Rahman Ahlan; Husni Teja Sukmana
TELKOMNIKA (Telecommunication Computing Electronics and Control) Vol 12, No 3: September 2014
Publisher : Universitas Ahmad Dahlan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12928/telkomnika.v12i3.105

Abstract

Historically, scholars have been determining deductively critical success factors (CSFs) since the end 1970s. Meanwhile, most of researchers in the information system (IS) project performance studies have been performing inductively this process. Definitely, each of both methods has strengths and weaknesses, but we argue that researchers and practitioners will get an alternative choice if both methods are combined for sharing the caracteristics. This study is conducted to respond this issue. Authors combined both methods using a compatibility analysis to inprove the result validity. This paper contributes to the debates on ensuring the interrelationship between the project succes criteria and their CSFs, incorporating the new factors, decomposing complexity of the project, and understanding focus of the stakeholders in the IS project environment. Although, the proposed method is only a combination of both previous methods, but this proposition is proposed together with a case study to prove its implementation feasibility