Claim Missing Document
Check
Articles

Found 5 Documents
Search

PENILAIAN KINERJA IRIGASI BERDASARKAN PENDEKATAN PERMEN PUPR NO.12/PRT/M/2015 DAN METODE MASSCOTE DENGAN EVALUASI RAPID APPRAISAL PROCEDURE (RAP) DI DAERAH IRIGASI Chusni Mubarok; Slamet Imam Wahyudi; Gata Dian Asfari
Prosiding Seminar Nasional Inovasi Dalam Pengembangan SmartCity Vol 1, No 1 (2017)
Publisher : Prosiding Seminar Nasional Inovasi Dalam Pengembangan SmartCity

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

ABSTRAK  Evaluasi kinerja sistem irigasi merupakan salah satu indikasi untuk dapat menggambarkan suatu keadaan dan karakteristik pengelolaan suatu sistem irigasi.Penilaian kinerja sistem irigasi berdasarkan Permen PUPR No. 12/PRT/2015 dilakukan berdasarkan atas 6 (enam) parameter yaitu ; Prasarana Fisik, Produktivitas Tanam, Sarana Penunjang, Organisasi Personalia, Dokumentasi dan Perkumpulan Petani Pemakai Air (P3A), Sedangkan pendekatan metode MASSCOTE dilakukan dengan evaluasi RAP yang merupakan seperangkat prosedur sistematis untuk mendiagnosa pada tahap awal mengenai penilaian kinerja sehingga menghasilkan suatu nilai indeks dalam bentuk tingkat layanan sebagai penilaian awal serta identifikasi kemajuan,kendala/hambatan terhadap 4 (empat) indikator utama yaitu ; Indikator Pelayanan, Indikator P3A, Indikator SDM Operator, dan Indikator Modernisasi Operasi Saluran. Penilaian kinerja berdasarkan Permen PUPR No.12/PRT/2015 dilakukan melalui penelusuran di lapangan dan wawancara terhadap petugas pengelola OP/petugas OP di lapangan menghasilkan indeks sebesar 81,85 % atau berkategori sangat baik. Sedangkan penilaian dengan menggunakan pendekatan metoda MASSCOTE dengan evaluasi RAP dilakukan melalui survey terhadap petugas OP irigasi dan P3A menghasilkan indeks kinerja/tingkat layanan sebesar 2,904 pada kategori baik. Berdasarkan teknik analisis data persamaan regresi didapatkan pengaruh signifikan secara bersama variabel indikator utama meliputi variabel indikator layanan irigasi [X1], variabel indikator P3A [X2], terhadap variabel kinerja sistem irigasi (Y) sebesar 0,903atau 90,3%dengan residual error sebesar 0,097 atau 9,7%. Kata Kunci : Kinerja Sistem Irigasi , MASSCOTE, Permen PUPR, Regresi
EVALUASI DAN PENENTUAN PRIORITAS REHABILITASI JARINGAN IRIGASI (Studi Kasus Pada Daerah Irigasi di Kabupaten Brebes) Setyo Pramono; Slamet Imam Wahyudi; Gata Dian Asfari
Prosiding Seminar Nasional Inovasi Dalam Pengembangan SmartCity Vol 1, No 1 (2017)
Publisher : Prosiding Seminar Nasional Inovasi Dalam Pengembangan SmartCity

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

ABSTRAK Kabupaten Brebes memiliki curah hujan yang cukup tinggi dan memiliki cukup banyak sumber mata air dan perairan umum seperti sungai dan waduk. Jumlah waduk ada 2 buah yaitu Waduk Malahayu dan Waduk Penjalin. Jumlah mata air yang sudah teridentifikasi sebanyak 15 buah di wilayah Kecamatan Sirampog, 19 buah di wilayah Kecamatan Paguyangan dan 1 buah di wilayah Kecamatan Bumiayu. Daerah Aliran Sungai (DAS) yang ada di Kabupaten Brebes dibagi menjadi 3 (tiga) yaitu DAS Kabuyutan, DAS Pemali dan DAS Gangsa. DAS Kabuyutan terdiri dari 6 Sub DAS, DAS Pemali terdiri dari 7 Sub DAS dan DAS Gangsa terdiri dari 1 Sub DAS. Penelitian  dilakukan  untuk  memperoleh  efektivitas  pengelolaan  jaringan daerah irigasi (DI) Cigora Kabupaten Brebes. Dalam  perkembangannya  kerusakan  yang  terjadi  di  Daerah Irigasi (DI)  di Kabuapten Brebes  juga  tidak dapat  diabaikan.  Kerusakan-kerusakan  yang  terdapat  di  DI  Kabupaten Brebes antara  lain pendangkalan saluran irigasi yang diakibatkan oleh sedimentasi. Bagaimana cara menentukan prioritas rehabilitasi Daerah irigasi Cigora Kabupaten Brebes sesuai kondisi fisik jaringan.Urutan Prioritas Penanganan dari hasil evaluasi kondisi Daerah Aliran Sungai pada Daerah Irigasi Cigora di Kabupaten Brebes diperoleh bahwa yang diprioritaskan pada saluran utama karena memiliki kerusakan berat.Prioritas penanganan mempertimbangkan data kondisi wilayah pertanian yang akan diairi, dari hasil analisis evaluasi bahwa daerah irigasi Cigora karena lahan pertanian yang harus dialiri mencapai 172.000 Ha.Urutan prioritas penanganan Daerah Irigasi Cigora diperoleh hasil bahwa prioritas tertinggi adalah saluran utama jalan dengan bobot (28%) kemudian disusul tingkat Saluran pembawa dengan bobot (29,62%), kemudian saluran bagi dengan bobot (36,47%) dan Bagian pembuangan dengan bobot (50%). Dalam penentuan urutan prioritas rehabilitasi bangunan irigasi pada DI Cigora berpatokan pada analisa kondisi fisik jaringan, yaitu kondisi fisik jaringan yang memiliki kerusakan lebih besar akan diprioritaskan untuk diperbaiki lebih dulu.Kata Kunci: evaluasi, penentuan prioritas, rehabilitasi, irigasi
KAJIAN PENGARUH PEMBANGUNAN JALAN TOL SEMARANG - DEMAK TERHADAP KINERJA JALAN RAYA KALIGAWE Rachmat Mudiyono; Gata Dian Asfari
Jurnal Planologi Vol 18, No 1 (2021): April 2021
Publisher : Universitas Islam Sultan Agung Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30659/jpsa.v18i1.13316

Abstract

The increasing movement causes traffic jams. One of the congestion occurred on Jalan Raya Kaligawe, Semarang. Jalan Raya Kaligawe is a road located close to the coast. So that when the sea water experiences high tide, the road will be inundated by tidal floods. This condition results in very high traffic jams every year. To deal with congestion and overcome the problem of sea water flooding, the government plans to build the Semarang - Demak Toll Road. With the existence of this Toll Road, it is hoped that congestion on the Kaligawe Road will be reduced. But the reduction in congestion needs research. So the researchers conducted a study on the effect of the construction of the Semarang - Demak Toll Road on the performance of the Kaligawe Highway. The purpose of this study, among others, is to determine the level of service, prediction of the diversion of traffic loads and predictions of increasing work on Jalan Raya Kaligawe. This study uses three stages in the research method, namely the identification stage, the data collection and processing stage, and the analysis and conclusion stages. The analysis technique used in this research is the formulation of traffic loading around the location due to development, both at the time and post, added with base traffic to get a real loading on the area of influence with the construction of the Semarang - Demak toll road.
Flood/Rob Handling Study with Polder System In Port of Tanjung Emas Area Semarang Mahmudi Amir; Slamet Imam Wahyudi; Gata Dian Asfari
International Conference on Coastal and Delta Areas Vol 3 (2017): The 3rd International Conference on Coastal and Delta Areas
Publisher : International Conference on Coastal and Delta Areas

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Tanjung Emas Port is located in Semarang City which is the Capital of Central Java Province. Port of Tanjung Emas has a very vital role in supporting the economy of Central Java and surrounding areas as the entrance and exit of goods both regionally and internationally. But the problem of inundation, especially in the port of Tanjung Emas Semarang is a routine problem that can not be resolved and become a scourge for the port service user in the port. The purpose of this research is to know the management of polder system to handle flood disaster in Port of Tanjung Emas Port Semarang both from operational aspect and its maintenance and also evaluate polder system performance as flood / rob disaster management system. This study is a case study, which is to investigate in depth about flood / rob handling system using polder system. The approach method used in this research is descriptive method. Respondents of this research are the parties in the port area that is the manager (PT Pelindo III), port and port hydrological experts both the workers and the harbor. Data collection was done by field observation, questionnaires and interview. Data were analyzed by descriptive analysis. Keywords: flood / rob handling, polder system, port ofTanjung Emas
Technical Economy Study on Jurang Jero Small Dam Construction Project In Blora Regency Dedi Prasetio Suryono; Soedarsono Soedarsono; Gata Dian Asfari
International Conference on Coastal and Delta Areas Vol 3 (2017): The 3rd International Conference on Coastal and Delta Areas
Publisher : International Conference on Coastal and Delta Areas

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

One effort to improve the water resources sector in the field of water needs is to build a container of water reservoir either in the form of natural container shelters like situ or artificial storage containers such as small dam. The aim of this research is to know the benefits of Jurang Jero small dam construction in terms of technical economic aspects obtained from irrigation water and raw water for Jurang Jero small dam construction project. The research method is descriptive quantitative with NPV analysis technique, Net B / C, IRR and sensitivity analysis. Quantitative data in the form of project costs, agricultural and fishery data are needed to calculate project benefits. Primary data retrieval technique using interview. Keywords: ekonomi teknik, small dam, Jurang Jero