Claim Missing Document
Check
Articles

Found 2 Documents
Search
Journal : Jurnal Agregate

KAJIAN KAPASITAS JALAN PANTAI LOSARI DENGAN METODE ANALISIS BERDASARKAN PKJI 2014 Selviana Walsen; Penina Istia
Journal Agregate Vol. 1 No. 1 (2022): September
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Ambon City is the capital of Maluku province, which every year there is an increase in the number of vehicles. So it is necessary to review the traffic density on each road segment. The function of traffic density identification is to estimate the degree of traffic saturation, and to anticipate future traffic developments. One of the roads that needs to be reviewed is street Losari beach. Street Losari beach is the main access in the movement of vehicles to the traditional shopping center of the Ambon city community, namely Mardika Market.In this study, an analytical method was used based on the Indonesian Road Capacity Guide (PKJI 2014). This method uses primary data in the form of the number of vehicles. For validation of PKJI's calculated speed, speed data is also taken. Then the data is processed to estimate the degree of saturation of the road segment.The results of the study illustrate that there are 2 patterns for peak hours, namely Monday 27 January 2020 and Thursday 30 January 2020 at 08-09 am and 17-18 pm. The number of vehicles from the market direction to Amplaz is higher than the number of vehicles from the Amplaz direction to market. The calculated and actual travel speed ranges from 29-36 km/h. Based on the results of the analysis of the degree of road saturation in current conditions, it can be seen that on Monday, January 27, 2020, it has reached 0.83 and is still below the limit set by PKJI (2014) which is 0.85. however, this figure is already close, so anticipation is needed before it reaches 0.85.Keywords: Capacity; Street; Losari beach
EVALUASI KINERJA SABO DAM SUNGAI WAIPIAH KABUPATEN MALUKU Henny Soplantila; Renny Betaubun; Penina Istia
Journal Agregate Vol. 2 No. 1 (2023): Maret
Publisher : Jurusan Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/ja.v2i1.1306

Abstract

Sabo is a dam building with a roller built to prevent the dangers of floods and lava. Sabo Dam has enormous benefits. As a controller of forest erosion and agricultural areas and prevent the dangers of landslides. Sand materials and rocks stuck in Sabo can also be used by the community as a source of income, the problem is whether the condition of physical facilities. In this writing is a quantitative analysis method/ technique, where the data that needs to be calculated using the evaluation of the impact of damage to the Sabo Dam Dam Wai Pia building, evaluating water levels on sabo dam and evaluating sedimentation in sabo dams, the condition of flooding fluctuations in floods can Affecting the condition of Sabo Dam, and whether the sediment arising in the Sabo Dam shelter affects the height of the water level in Sabo Dam. With the aim of writing to know The results of the analysis are based on the results of the Sabo Dam performance and performance evaluation of the condition of the building is used to calculate the total score of the inspection results, the total item of the building condition, the total number of the largest score and the total score of the entire item and the level of damage in percent (%), the maintenance recommendations are determined based on the parameters and good conditions , if the damage rate is still below 10% of the initial construction conditions, the condition is slightly damaged, if the damage rate is 10% to below 20% of the initial conditions