PEMANFAATAN POTENSI GAS METANA DI PABRIK KELAPA SAWIT SEI SILAU, PTPN3, SUMATERA UTARA
Febijanto, Irhan
Jurnal Teknologi Lingkungan Vol. 11 No. 3 (2010)
Publisher : Center for Environmental Technology - Agency for Assessment and Application of Technology
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
Full PDF (872.068 KB)
|
DOI: 10.29122/jtl.v11i3.1192
Water waste in Palm Oil Mill (POM) is not effectively utilized yet. Before waste water discharge from POM, the waste water is processed by an aerobic treatment in several ponds to decrease the influence of organic matter. Methane gas generated in the anaerobic ponds is a Green Gas House giving a contribution to global warming impact. In Palm Oil Mill of Sei Silau located in North Sumatera, the potential generated methane gas in two anaerobic ponds has been investigated using measurement of Chemical Oxygen Demand (COD) of waste water in the sites. Based on the potential generated methane gas, the reduction of GHG emission is calculated, and the feasibility of the project as CDM project was evaluated.Keywords : Pabrik Kelapa Sawit, gas metana, gas rumah kaca, proyek CDM (CleanDevelopment Mechanism),, COD (Chemical Oxygen Demand)
PERHITUNGAN FAKTOR EMISI DI SISTEM JARINGAN KETENAGALISTRIKAN JAWA-MADURA-BALI
Febijanto, Irhan
Jurnal Teknologi Lingkungan Vol. 11 No. 2 (2010)
Publisher : Center for Environmental Technology - Agency for Assessment and Application of Technology
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
Full PDF (672.394 KB)
|
DOI: 10.29122/jtl.v11i2.1207
The methodology of calculation for emission factor for grid connection is determined by IPCCC Intergovernmental Panel Climate Change). The methodology is revised periodically,and become comprehensive calculation. Mainly in developed countries, the emission factor is provided by government related institution yearly. Therefore the developers who need that value can get easily, and they can save a time and money in the developing Clean Development Mechanism Project. In Indonesia, until now there is no government institution or other related institutions that have an obligation to provide and calculate that number.PTPSE-BPPT has initiated to calculate the emission factor of grid system of Jawa-Madura-Bali using data between 2002 and 2006. The Approved Consolidated Methodology 0002 and Approved Methodology Simple I-D were used in the calculation. Based on the calculationresult, it was proved that the emission factor of JAMALI grid increased 18.2%, resulted to coal consumption increased. The value of this emission factor has been adopted by Directorate General Electricity and energy Utilization and recognized by Indonesian Designated National Authority, as a National Number of emission factor in JAMALI in 2008.Keywords : faktor emisi, emisi karbon, sistem JAMALI, pembangkit listrik,Clean Development Mechanism,
PEMBANGUNAN PLTMH RANTEBALLA DI KABUPATEN LUWUK, SULAWESI SELATAN SEBAGAI PROYEK PENGURANGAN EMISI RUMAH KACA,
Febijanto, Irhan
Jurnal Teknologi Lingkungan Vol. 11 No. 1 (2010)
Publisher : Center for Environmental Technology - Agency for Assessment and Application of Technology
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
Full PDF (846.561 KB)
|
DOI: 10.29122/jtl.v11i1.1221
Renewable energy fuelled power generations are not many developed by privatesector in Indonesia. The incentive provided by Indonesia government is not enough to encourage private sector to develop renewable energy fuelled power generation. Credit carbon as an additional revenue from Clean Development Mechanism is utilized in Ranteballa Hydro Power Plan development. This project contributes to reduce green effect gas generated in South Sulawesi grid system. This paper describes the calculation of emission reduction generated from the Ranteballa Hydro Power development, and also the evaluation regarding emission carbon produced in the recent five years. BPPT has a role of CDM facilitator in this project development, and has a collaboration with CDM in vestor, Chugoku Electric Power and the owner of the project PT Fajar Futura Energi Luwu. Key words : green house gasses, global warming, hydro power, emission factor, emissionreduction, electricity
Optimalisasi Pemanfaatan Gas Metana: Sebagai Sumber Energi di Pabrik Kelapa Sawit sebagai Antisipasi Harga Jual Listrik Berdasarkan Biaya Pokok Penyediaan (BPP) Pembangkitan
Febijanto, Irhan
Jurnal Teknologi Lingkungan Vol. 19 No. 1 (2018)
Publisher : Center for Environmental Technology - Agency for Assessment and Application of Technology
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
Full PDF (788.83 KB)
|
DOI: 10.29122/jtl.v19i1.2071
Pada akhir Maret 2017, telah dikeluarkan regulasi baru oleh Pemerintah terkait harga jual listrik. Sayangnya,harga jual listrik yang baru ini lebih rendah dari pada harga jual listrik sebelumnya. Penetapan harga baru ini akan menurunkan tingkat keekonomian dari pengoperasian pembangkit listrik tenaga biogas (PLTBg), sehingga pembangunan PLTBg di Indonesia menjadi kurang menarik bagi para investor. Kondisi ini sangat tidak baik bagi iklim pembangunan energi terbarukan di Indonesia. Untuk itu berdasarkan studi kasus pembangunan PLTBg Terantam, Riau maka direkomendasikan pemanfaatan gas metana tidak hanya sebagai bahan bakar PLTBg saja tetapi juga sebagai pengganti sebagian bahan bakar cangkang di boiler PKS. Makalah ini membuktikkan kenaikan tingkat keekonomian dari hasil penjualan cangkang untuk PLTBg dengan kapasitas 1.025 kW. Estimasi ketersediaan jumlah gas metana dilakukan dengan menggunakan metodologi UNFCCC (United Nations Framework Convention on Climate Change). Dengan adanya pendapatan tambahan, IRR naik dari 11,45% menjadi 16,41% dan NPV naik dari  Rp. -1.086,4 x 106 menjadi  Rp 3.717,85 x 106.
PEMANFAATAN POTENSI TENAGA AIR DI SALURAN IRIGASI BANJARCAHYANA, KABUPATEN BANJARNEGARA, PROPINSI JAWA TENGAH SEBAGAI USAHA PENGURANGAN EMISI GAS RUMAH KACA
Febijanto, Irhan
Jurnal Teknologi Lingkungan Vol. 9 No. 3 (2008): JURNAL TEKNOLOGI LINGKUNGAN
Publisher : Center for Environmental Technology - Agency for Assessment and Application of Technology
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
Full PDF (110.818 KB)
|
DOI: 10.29122/jtl.v9i3.472
This study was conducted by collaboration between BPPT, Chugoku Electric Power, and PT Indonesia Power and funded by GEC (Japan-Geo Environment Center). The study was started on August 2005, and finished on September 2006. The purpose of the study was to explore the unutilized potentials micro hydro power plants (MHPP) in Banjarcahyana irrigation channel. These sites are located at south eastern of Banjarnegara city. Development of these MHPP will be planned put into Clean Development Mechanism (CDM), therefore operation of these power generation would be calculated to reduce global warming effects. According to the study result, it was found eight locations having potential to build as MHPP. The development of the project economically feasible estimated could reduce 17,252 t-CO2 of Green House Gas Effect annually. This study also provides new emission coefficient factor for electricity grid system of Jawa Bali Madura (JAMALI).
PENGURANGAN GAS RUMAH KACA DARI LIMBAH CAIR DI PABRIK KELAPA SAWIT PINANG TINGGI, JAMBI DENGAN CDM
Febijanto, Irhan
Jurnal Rekayasa Lingkungan Vol 6, No 3: Jurnal Rekayasa Lingkungan
Publisher : BPPT
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
Full PDF (322.715 KB)
Waste water produced from Crude Palm Oil?s process in Palm Oil Mill (POM) is usually treated using water treatment ponds that consist of anaerobic ponds and aerobic ponds. It is known well, methane gas is generated from degradation of organic matter in anaerobic ponds. The methane gas results global warming impacts. Regarding to tackle the global warming impact, the methane gas generated from POM can be captured and flared to convert methane gas tocarbon dioxide. This study was conducted in one of the big capacity of Pinang Tinggi POM owned by PT Perkebunan Nusantara 3. Methane gas potential was investigated by using pH, COD (Chemical Oxygen Demand) and waste water measurement. And from these result the methane gas potential was predicted. In this study, using Clean Development Mechanism (CDM), capturing methane gas generated from anaerobic pond gave a result that the project can be an economically feasible based on the condition measured.Keywords : oil palm industry, methane gas, gas rumah kaca, CDM project(CleanDevelopment Mechanism), COD (Chemical Oxygen Demand)
PEMANASAN GLOBAL DAN PELAKSANAAN MEKANISME PEMBANGUNAN BERSIH SEKTOR ENERGI DI INDONESIA
Febijanto, Irhan
Jurnal Rekayasa Lingkungan Vol 5, No 2: Jurnal Rekayasa Lingkungan
Publisher : BPPT
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
Full PDF (266.31 KB)
At this time global warming became an environmental issue that most often discussed. At the same time, as a trigger of green house gasses business, the issue of carbon trading business became an interesting discussion, because it has an impact to improve the feasibility of the project. This paper discussed the causes of global warming, the mechanism of global warming and the efforts to reduce green house gasses using Clean Development Mechanism. In addition, carbon price fl uctuation and the procedures of carbon trading are described also. Finally, potentialClean Development Mechanism projects in energy sector and implemented Clean Development Mechanism projects in Indonesia are discussed.Key Words : Global warming, Clean Development Mechanism (CDM), CDM project, Certified Emission Reduction (CER), Carbon Trading
PENGURANGAN GAS RUMAH KACA DARI LIMBAH CAIR DI PABRIK KELAPA SAWIT PT PERUSAHAAN NUSANTARA, RIAU
Febijanto, Irhan
Jurnal Rekayasa Lingkungan Vol 5, No 3: Jurnal Rekayasa Lingkungan
Publisher : BPPT
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
Full PDF (183.065 KB)
Waste water utilization in palm oil mills (POMs) in Indonesia is limited only for land application and in some palm oil mills the waste water is unutilized and it is only discharged to a river. The technology of methane gas utilization produced from waste water have been developed, unfortunately economical barrier is a big problem to implement it in the POMs. Since Clean Development Mechanism (CDM) have been being introducing in Indonesia, many foreign investors who looking for Certified Emission Reduction (CER) visit and investigate potential reductions in Indonesia. Using CDM Mechanism, it will change feasibility of an activity of methane gas capture. An income from selling CER makes theeconomical feasibility of methane gas capture increase. The purpose of this study is to investigate the potential methane gas produced in waste water pond in all POM owned by PTPN V, located in Riau Province. Area of own plantation, amount of processed (Fresh Fruit Bunch (FFB) and distance of the location are proposed as a consideration for selecting candidate locations. The potentialmethane gas captured was calculated. It was known that four POMs have a potential methane gas amount produced from waste water pond, and the investment in those locations were feasible based on the NPV calculation result. Utilization of captured methane gas as a fuel for power generation is inconsiderate, because negotiation is predicted will be takes a long time.Key words: green house gasses, palm oil mill, empty fruit bunch, fresh fruit bunch, palm mill oil effluent, clean development mechanism
EFEK GAYA ANTAR PARTIKEL DAN DIAMETER PARTIKEL TERHADAP KECEPATAN MINIMUM FLUIDISASI
Febijanto, Irhan
Jurnal Energi dan Lingkungan (Enerlink) Vol 5, No 2 (2009)
Publisher : Badan Pengkajian dan Penerapan Teknologi
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
Full PDF (441.775 KB)
|
DOI: 10.29122/elk.v5i2.1570
In this study, the effect of diameter particle and the effect of inter-particlecohesion force due to liquid bridge formation on the minimum fluidization velocityin the fluidized bed have investigated. Also the effect of inter-particle cohesionforce on a fluidization condition of the bed has observed by video camera. Theinvestigation results showed bigger diameter can give higher minimumfluidization velocity, and stronger inter-particle force can give higher minimumfluidization velocity, and then make a quality of fluidization of bed lower. Usingwith this investigation results, the mechanism of fouling and slaggingphenomena, which are happen in the coal-fired boiler can be explained.Kata kunci: fluidized bed, minimum fluidization velocity, particle diameter,relative humidity, inter-particle cohesion force
POTENSI PENANGKAPAN GAS METANA DAN PEMANFAATANNYA SEBAGAI BAHAN BAKAR PEMBANGKIT LISTRIK DI PTPN VI JAMBI
Febijanto, Irhan
185P -3466
Publisher : Agency for the Assessment and Application of Technology
Show Abstract
|
Download Original
|
Original Source
|
Check in Google Scholar
|
Full PDF (457.56 KB)
Umumnya di dalam pemanfaatan air limbah di Pabrik Kelapa Sawit (PKS) Indonesia terbatas hanya untuk aplikasi daratan. Teknologi untuk menangkap dan memanfaatkan gas metana yang dihasilkan dari kolam anaerobik pengolahan air limbah telah dikembangkan, akan tetapi halangan ekonomi merupakan masalah besar untuk menerapkan teknologi ini. Karena Mekanisme Pembangunan Bersih (CDM) telah diperkenalkan di Indonesia, teknologi untuk menangkap dan memanfaatkan gas metana mempunyai peluang untuk diterapkan. Menggunakan revenue CDM, investor asing mempunyai kesempatan untuk menginvestasikan instalasi untuk menangkap dan membakar gas metana yang dihasilkan dari kolam anaerobik pengolahan air limbah di PKS. Sebagian dari mereka memanfaatkan gas metana yang ditangkap sebagai bahan bakar untuk menggantikan bahan bakar fosil. Di dalam studi ini, potensi pengurangan Gas Rumah Kaca dari gas metana di PKS PT. Perkebunan Nusantara VI diteliti. Menggunakan AMS-III.H (Approved Methodology) mengenai metodologi recovery metana di dalam pengolahan limbah dan AMS-I.D mengenai pembangkitan energi listrik terbarukan yang terkoneksi dengan jaringan grid , potensi gas metana yang ditangkap dan listrik yang dibangkitkan dihitung. Ada dua jenis revenue yang mungkin diperoleh dalam proyek ini, yaitu satu dari penjualan karbon kredit ke para pembeli CER (reduksi emisi yang bersertifikat), dan yang lainnya dari penjualan listrik ke PT. PLN (Perusahaan Listrik Negara). Telah diketahui terdapat dua PKS yang layak menerapkan teknologi ini.