Claim Missing Document
Check
Articles

Found 14 Documents
Search

KELAYAKAN EKONOMI DAN PENDANAAN PEMBANGUNAN PROYEK PLTN JENIS PWR TIPE OPR-1000 DI SEMENANJUNG MURIA Moch. Djoko Birmano; Mochamad Nasrullah
Jurnal Pengembangan Energi Nuklir Vol 7, No 1 (2005): Juni 2005
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2005.7.1.1935

Abstract

ABSTRAK KELAYAKAN EKONOMI DAN PENDANAAN PEMBANGUNAN PROYEK PLTN JENIS PWR TIPE OPR-1000 DI SEMENANJUNG MURIA. Telah dilakukan studi untuk mengetahui kelayakan ekonomi dan pendanaan pembangunan PLTN OPR-1000 di Semenanjung Muria. Studi ini dilakukan dengan tahapan-tahapan sbb: pemutakhiran data baik teknis maupun ekonomi dari PLTN OPR-1000, survei sumber-sumber pendanaan, mengetahui kelayakan ekonomi (Economic Viability) dengan menghitung biaya pembangkitan listrik (Electricity Generation Cost), menghitung penjualan listrik (Electricity Tariff), biaya pembangunan (Construction Cost) PLTN OPR-1000 dan menghitung kelayakan pendanaan (Financing Viability) pembangunan PLTN OPR-1000 dengan menggunakan kriteria kelayakan yang urnum digunakan (Nilai Bersih Sekarang (NPV), Tingkat Pengembalian Modal (IRR) dan Lama Pengembalian Modal (Payback Period)) dengan menggunakan KEPCO Spread Sheet. Berdasarkan perhitungan didapatkan hasil bahwa ongkos pembangkitan listrik sebesar 4,0866 cent/kWh, sementara harga penjualan (tarif) listrik adalah 6,6399 cent/kWh (setelah dikenai pajak)! Biaya pembangunan PLTN OPR-1000 secara keseluruhan adalah US$ 4.092,09 juta (termasuk interest dan financial fee, tidak termasuk initial nuclear fuel). Dari perhitungari kelayakan pendanaan pada kasus dasar (base case) diperoleh hasil bahwa nilai IRR, NPV dan Payback Period keseluruhan investasi adslah masing-masing sebesar 10,37%, US$ 90,52 juta dan 12,11 tahun. Dari sini dapat disimpulkan bahwa dengan harga jual listrik sebesar 6,640 cent/kWh atau 0,0664 US$/kWh, pada dasarnya proyek pembangunan PLTN OPR-1000 ini sangat layak dan menguntungkan. Dari segi investasi, proyek ini cukup menarik minat investor karena tingkat pengembalian modalnya cukup tinggi, keuntungan pada akhir umur ekonomi cukup besar dan waktu/lama pengembalian modalnya cepat.   ABSTRACT THE ECONOMIC AND FINANCING VIABILITY OF THE OPR-1000 CONSTRUCTION AT MURIA PENINSULA. The study of the economic and financing viability of the OPR-1000 construction at Muria Peninsula have been done. This study is carried out with steps as follows: updating of newest OPR-1000 technical and economic data, survey of financing sources; the calculation of electricity generation cost, electricity tariff, construction cost of OPR-1000; and calculation of OPR-1000 financing viability by using feasibility criteria such as Net Present Value(NPV), Internal Rate of Return (IRR) and capital payback period. The calculation of generation cost, electricity tariff, construction cost and financing viability criteria (IRR, NPV, Payback Period) by using KEPCO Spread Sheet. From the results of calculation show that the electricity generation cost is 4.0866 cent/kWh, while the electricity tariff is 6.6399 cent/kWh (after Value Added Tax) The total construction cost of OPR-1000 is US$ 4,092.09 million (included interest and financial fee, excluded initial nuclear fuel). The calculation of financing viability in base case obtained that value of IRR, NPV and Payback Period for total investment is 10.37%, US$ 90.52 million and 12.11 years respectively. From these results can be concluded that with the electricity tariff of 6.640 cent/kWh or 0.0664 US$/kWh, basically this project of OPR-1000 construction is very feasible and beneficial. From investment side, this project can attract investor because the rate of capital return is high enough, profit in the end of economic life is big enough and payback period is short.
STUDI DAMPAK PEMBANGUNAN PLTN-DESALINASI DI MADURA TERHADAP SEKTOR EKONOMI DAERAH Bambang Eko Afiatno; Mochamad Nasrullah; Sriyana Sriyana
Jurnal Pengembangan Energi Nuklir Vol 9, No 1 (2007): Juni 2007
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2007.9.1.1949

Abstract

ABSTRAK STUDI DAMPAK PEMBANGUNAN PLTN-DESALINASI DI MADURA TERHADAP SEKTOR EKONOMI DAERAH. Tujuan utama studi ini yaitu memperkirakan dampak pembangunan dan pengoperasian awal pembangkit listrik tenaga nuklir (PLTN)-desalinasi di Pulau Madura terhadap ekonomi daerah tersebut hingga tahun 2018. Proyeksi jangka panjang keluaran (output, X) ekonomi Madura menggunakan alat analisis model l-O (input-output) dinamis Leontief dan untuk PDRB - permintaan akhir (Y) menggunakan model time series dengan random growth adjustment yang didasarkan pada autoregressive trend model. Karena Tabel l-O Madura belum tersedia, maka diperlukan penyusunan Tabel l-O Madura tahun 2000 dengan metode RAS dan modifikasi. Proyek PLTN ini menggunakan teknologi SMART dengan 2 unit pembangkit (kapasitas 100 MWe per unit, keluaran total 200 MWe), tetapi tidak dibangun bersamaan (selisih setahun). Sedangkan desalinasinya menggunakan MED 4 unit dengan kapasitas masing-masing 10.000 m /hari. Masa 3 pembangunan PLTN-Desalinasi (tahap pelaksanaan) terhitung sejak tahun 2014 hingga 2018 (selama 5 tahun masa pembangunan) yang didahului dengan tahap pra-proyek (tahun 2010- 2013). Total kebutuhan investasi proyek ini adalah US$ 357,87 juta (tahun 2002). Pada saat kontrak ditandatangani (turn key contract) tahun 2009, nilai tersebut disesuaikan dengan expected inflation US$ sebesar 1,5% per tahun, sehingga nilai investasinya menjadi sebesar US$ 397.18 juta dan pada tahun 2014 (awal pembangunan) menjadi sebesar US$ 427.87 juta. Pada akhir proyek pembangunan (2018), nilai total investasinya adalah sebesar US$ 440.79 juta. Apabila biaya ganti rugi tanah dan perijinan dihitung, maka nilai proyek menjadi US$ 476 juta. Pada tahap pra-proyek (2010-2013), secara kumulatif aktivitas ganti-rugi lahan dan perijinan sebesar Rp 114,11 milyar (US$ 10.69 juta) berdampak tidak langsung - transmisi melalui konsumsi rumah tangga dan pemerintah - terhadap ekonomi Madura. Hasil simulasi l-O dinamis (Tabel l-O Madura tahun 2000, 10x10) menunjukkan bahwa peningkatan konsumsi itu berakibat pada penambahan keluaran ekonomi Madura, PDRB, dan tenaga kerja yaitu masing-masing secara kumulatif sebesar Rp 146,39 milyar, Rp79,20 milyar, dan 7.428 orang. Secara keseluruhan aktivitas proyek pada tahap pelaksanaan (2014-2017) diperkirakan Rp 231,37 milyar (US$ 19.36 juta) yang berdampak langsung terhadap ekonomi Madura. Dampak itu ditransmisikan melalui investasi yang diproduksi sektor 7 (bangunan-konstruksi), di mana dari simulasi l-O dinamis untuk dampak tersebut (kumulatif) adalah peningkatan keluaran, PDRB, dan penyerapan tenaga kerja yang masing-masing sebesar Rp 335,43 milyar, Rp 159,29 milyar, dan 14.941 orang. Pada tahap operasi awal proyek tahun 2018 selama 9 bulan untuk PLTN unit pertama (100MWe), dua unit desalinasi (20.000m /hari). Berdasarkan skenario 3 pembedaan harga dan produksi neto (listrik dan air dikurangi pemakaian sendiri sebesar 6,5% dan 2%) diperoleh tambahan keluaran baru yaitu Rp 337,64 milyar (skenario pertama) dan Rp 398,08 milyar (skenario kedua). Hasil simulasi 1-0 dinamis (skenario pertama) menghasilkan tambahan keluaran, PDRB, dan penyerapan tenaga kerja masing-masing Rp 441,6 milyar, Rp 52,4 milyar, dan 4.544 orang. Hasil skenario kedua yaitu meningkatkan keluaran ekonomi Madura sebesar Rp 519,7 milyar, PDRB sekitar Rp 58,7 milyar dan tenaga kerja sebanyak 5.313 orang. Kata Kunci: model l-O dinamis-statis PDRB-permintaan akhir; tenaga kerja; PLTN- desalinasi; energi listrik; air bersih.   ABSTRACT A STUDY OF THE IMPACTS OF NPP-DESALINATION DEVELOPMENT IN MADURA ON SECTORAL REGIONAL ECONOMY. This study aims to assess the economic impact of construction and early operation of the nuclear power plant (NPP)- desalination project in the island of Mad Lira until the year 2018. Long-term projection on economic output (X) of Madura uses Leo ntiefdynamic 1-0 (input-output) model, and for GRDP- final demand (Y) uses time series model with random growth adjustment based on autoregressive model. Since the Madura 1-0 Table is not available, then it is necessary to construct it for 2000 using RAS method and some modifications. The NPP project will use SMART technology with 2 units of power generators (100 MWe capacity per unit, total output 200 MWe), but to be built sequentially with one year lag. As for the desalination will use 4 units MED with each unit capacity of 10.000 m'/day. The construction stage will take 5 years to be completed (2014-2018), preceded by the pre­project stage along 2010-2013. Total investment requirements of the project is amounted to US$ 357,87 million (in 2002). At the time when the contract (turn key contract) is signed in 2009, the value will become US$ 397.18 million, and in 2014 (early construction) will be US$ 427.87 million. At the end of the project (2018), total investment requirements will amount to US$ 440.79 million. To include land make up payment and licenses costs the project will be worth US$ 476. In the pre-project stage (2010-2013), cumulatively, land make up payment and licenses management activities as much as Rp 114.11 billion (US$ 10.69 million) has indirect effect-transmitted through private and government consumption - onto Madura economy. Dynamic 1-0 simulation results (2000 Madura 1-0 Table, 10x10) show that the rise in consumption generate increases in output, GRDP and employment respectively in cumulative as much as Rp 146.39 billion, Rp79.20 billion, and 7,428 men. In overall, project activities in construction stage (2014-2017) estimated to Rp 231.37 billion (US$19.36 million) which has direct effect on Madura economy. The impact is transmitted through investment which is produced by sector 7 (construction), where from dynamic 1-0 simulation for this effect (cumulative) are increases in output, GRDP and employment respectively as much as Rp 335.43 billion, Rp 159.29 billion, and 14,941 men. In pre-operation stage in 2018 for 9 months for the first NPP unit (100MWe), and two units desalination (20.000m'/day). Based on price differencing scenarios and net production (electricity and water minus internal consumption amounted to 6,5% and 2%) new output is obtain as much as Rp 337.64 billion (first scenario) and Rp 398.08 billion (second scenario). Results from dynamic 1-0 simulation with first scenario show increases in output, GRDP and employment respectively up to Rp 441.6 billion, Rp 52.4 billion, and 4,544 men. As for the second scenario, the Madura economic output increases to Rp 519.7 milyar, GRDP rises to Rp 58.7 billion and employment for 5.313 men. Keywords: l-O model model dynamic-static; GRDP-final demand; labor; NPP- desalination; electricity; water.
PENGGUNAAN PROGRAM DECADES UNTUK PENGEMBANGAN PEMBANGKIT LISTRIK DENGAN MEMPERTIMBANGKAN FAKTOR EKSTERNALITAS Arnold Y. Soetrisnanto; Farid Kresna; Mochamad Nasrullah
Jurnal Pengembangan Energi Nuklir Vol 1, No 3 (1999): September 1999
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.1999.1.3.2001

Abstract

ABSTRAK PENGGUNAAN PROGRAM DECADES UNTUK PENGEMBANGAN PEMBANGKIT LISTRIK DENGAN MEMPERTIMBANGKAN FAKTOR EKSTERNALITAS. Dalam menghadapi tuntutan untuk peningkatan penerapan sistem energi yang berwawasan lingkungan dan berkelanjutan (sustainable development), maka penentuan opsi sistem energi diharapkan dapat menjawab isu tersebut. Oleh karena itu pemilihan teknologi energi perlu didasari atas pertimbangan lingkungan. Program Perencanaan Energi dan Listrik DECADES (Data Bases and Methodologies for Comparative Assessment of Different Energy Sources for Electricity Generation) merupakan Program Perencanaan Sistem Kelistrikan yang komprehensif. Tujuan program tersebut untuk merencanakan dan merancang strategi penyediaan energi listrik atas dasar penentuan strategi pemilihan sumber daya energi (optimal solution) dengan memperhitungkan batasan-batasan lingkungan yang ketat sampai ke permasalahan kesehatan masyarakat serta pertimbangan externalitas (external cost) agar tujuan pembangunan berkelanjutan dapat dicapai. Program ini dibuat dalam format Paradox for Windows dengan basis data yang terdiri atas: RTDB - (Reference Technology Data Base), CSDB (Country Specific Data Base), VSDB - (Vendor Specific Data Base), TOXDB (Toxicology Data Base) dan HEIES (Health and Environmental Impact of Energy System). Seluruh data yang ada dioptimasi dengan modul perencanaan kelistrikan DECPAC dengan mengevaluasi faktor teknik, ekonomi dan lingkungan termasuk ekstemalitas (biaya eksternal) untuk berbagai sistim pembangkitan kelistrikan.   ABSTRACT POWER GENERATING DEVELOPMENT USING DECADE PROGRAM WITH EXTERNALITIES FACTOR TAKING INTO ACCOUNT. The complexity facing today's energy planners and decision-makers, particularly in electricity sector, has increased. They must take into account many elements in selecting technologies and strategies that will impact near term energy development and applications in their countries. While cost remain a key factor, tradeoffs between the demand of environmental protection and economic development will have to be made. This fact, together with the needs of many countries to define their energy and electricity programs in a sustainable manner, has resulted in a growing interest in the applications of improved data, tools, and techniques for comparative assessment of different electricity generation options. Particularly from an environmental and a human health point view. The program on Data Bases and Methodologies for Comparative Assessment of Different Energy Sources for Electricity Generation, in short DECADES was developed. For DECADES the types of technology databases were developed using PARADOX format are: RTDB - (Reference Technology Data Bases), CSDB (Country Specific Data Base), VSDB - (Vendor Specific Data Base), TOXDB (Toxicology Data Base) and HEIES (Health and Environmental Impact of Energy System). These data will be used in analytical software (DECPAC) for evaluating the always existing tradeoffs between technical, economic, and environmental features including externalities (external cost) of different electricity generation technologies.
THE EXTERNALITY STUDY OF INDONESIA NUCLEAR POWER PLANT Arief Heru Kuncoro; Tosi Prastiadi; Mochamad Nasrullah
Jurnal Pengembangan Energi Nuklir Vol 4, No 2 (2002): Desember 2002
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2002.4.2.2047

Abstract

ABSTRACT THE EXTERNALITY STUDY OF INDONESIA NUCLEAR POWER PLANT. It has been calculated the externality cost of Nuclear Power Plant on Muria Peninsula, Jepara, Central Java. In this study is used the KSN-1000 (the Korean Standard Nuclear, Pressured Water Reactor 1000 MWe) as reference. Meanwhile, for environmental data, it is used the data from Tricastin nuclear power plant. NukPacts Model is used in this study to calculate and evaluate the externality cost of nuclear power plant. The externality study consider valuing the human health effects of routine atmospheric releases from nuclear power plant and the external costs of nuclear accidents. The valuation of health effect in the externality study is carried out by a Value of Life Year Lost (VLYL) approach. The impact of routine atmospheric releases is about US$ 5.60E-05 per-kWh. Meanwhile, external cost from nuclear accident, nuclear water impact and radioactive waste disposal are expressed in US$ 2.69E-06 per-kWh, US$ 6.11E-09 per- kWh and US$ 2.54E-06 per-kWh respectively. So, the total externality cost (total damage cost) of NPP (1000 Mwe) is around US$ 6.12E-05 per-kWh.   ABSTRAK STUDI EKSTERNALITAS PEMBANGKITAN LISTRIK TENAGA NUKLIR Dl INDONESIA. Telah dilakukan perhitungan biaya ekstemalitas Pembangkit Listrik Tenaga Nuklir di Semenanjung Muria, Jepara, Jawa Tengah. Dalam studi ini digunakan referensi pembangkit nuklir Korea jenis Pressurized Water Reactor dengan daya 1000 MWe (KSN-1000), sedangkan untuk data lingkungan, digunakan referensi pembangkit nuklir Tricastin. Perangkat lunak yang dipakai untuk perhitungan dan evaluasi biaya kerusakan lingkungan akibat pembangkit nuklir adalah Program NukPacts. Studi yang dilakukan mempertimbangkan penilaian efek kesehatan manusia akibat operasi rutin PLTN dan biaya eksternal akibat kecelakaan nuklir. Penilaian terhadap dampak kesehatan dalam studi ekstemalitas digunakan pendekatan Value of Life Year Lost (VLYL). Hasil perhitungan biaya ekstemalitas akibat emisi dari operasi rutin PLTN ke atmosfer adalah sekitar US$ 5.60E-05 per-kWh, sedangkan biaya eksternalitas akibat kecelakaan nuklir, akibat dampak lingkungan melalui air dan penyimpanan limbah radioaktif, masing-masing adalah US$ 2.69E-06 per-kWh, US$ 6.11E-09 per-kWh and US$ 2.54E-06 per-kWh. Jadi total biaya ekstemalitas (total biaya kerusakan) akibat PLTN berdaya 1000 Mwe adalah sekitar US$ 6.12E-05 per-kWh.