Claim Missing Document
Check
Articles

Found 2 Documents
Search
Journal : Info-Teknik

MENINGKATKAN KEAMANAN KENDARAAN BERMOTOR DENGAN MEMBUAT ALAT FINGER PRINT M. Adi Rahman; Hamsir Hamsir; Lukman Lukman
INFO-TEKNIK Vol 20, No 1 (2019): INFOTEKNIK VOL. 20 NO. 1 JULI 2019
Publisher : Universitas Lambung Mangkurat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.20527/infotek.v20i1.6966

Abstract

One of the problems faced by motor vehicle users is the frequent theft and loss of motorbikes. The purpose of the study was to design a finger with the aim of increasing the safety of motorvehicles. The method use in the research is the research method used with the case study approach method which is the innovation of making motorcycle vehicle safety devices that will function as a log out so that motorized vehicles cannot run if they do not use the ignition key of the motor vehicle owner. The expect results of this study are the availability of motor vehicles safety devices so that the potential loss of motorvehicles can be reduce. The results of this study are expect to be useful for the benefit of many people and can be develoveas industrial innovation
RESETTING VERTICALITY FLARE STACK DENGAN PENGATURAN TEGANGAN GUY WIRE Sulardi Sulardi; Sabar P. Simatupang; Lukman Lukman
INFO-TEKNIK Vol 22, No 1 (2021): INFOTEKNIK VOL. 22 NO. 1 JULI 2021
Publisher : Universitas Lambung Mangkurat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.20527/infotek.v22i1.11627

Abstract

The flare stack is an important installation in the oil and gas industry as a tool to burn off-specification gas so as not to harm the environment. The problem faced is that there is a slope on the riser vertical stake so that it exceeds the safe limit (out of tolerance). The purpose of this research is to determine the method of resetting the riser flare stack so that the verticality returns to the uprightness as required by API 521. The method of resetting the verticality flare stack is carried out by adjusting the tension on all guy wire support vertical riser stacks so that each receives a voltage of 1.2 - 1.4 tons and mutually eliminate the stresses that occur when the riser stak gets a load from the outside or as a result of plant operations. The results showed that the guy wire support tension resetting method was proven to be suitable and suitable for use properly and safely with a maximum erection of 145 mm (1/800L) vs. API 521 standard tension maximum of 232mm (1/500L). The results of this study also recommend that the resetting work method that has been proven to be suitable and suitable for use can be replicated to overcome problems in the Pertamina other unit.