Studi Analisis Terhadap Faktor-Faktor Penyebab Klaim Sengketa Kontrak dan Metode Penyelesaian Sengketa Pada Pelaksanaan Jalan Konstruksi Benny Mochtar
Kurva S : Jurnal Keilmuan dan Aplikasi Teknik Sipil Vol 5, No 2 (2017)
Publisher : Department of Architecture, Faculty of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (42.211 KB) | DOI: 10.31293/teknikd.v5i2.2890

Abstract

Klaim dalam kontrak konstruksi merupakan masalah yang dapat mengarah kepada permohonan tambahan biaya atau tambahan waktu serta perselisihan antara pengguna jasa dan penyedia jasa. Paper ini mendiskusikan klaim yang diajukan penyedia jasa ke pengguna jasa, dilihat dari penyebab, bentuk, dan alasan kegagalan proses pengajuan klaim, serta metode penyelesaian perselisihan dari klaim. Hasil penelitian menunjukan bahwa penyebab utama klaim adalah factor cara pengukuran hasil pekerjaan, faktor perhentian sementara pekerjaan & pengakhiran perjanjian / pemutusan kontrak, faktor cara pembayaran dan retensi, factor dampak lingkungan serta bentuk klaim yang sering diajukan yaitu klaim waktuu. Proses pengajuan klaim dengan menyertakan penjelasan terhadap penyebab klaim, dan metode penyelesaian klaim yang sering digunakan oleh para pihak adalah negosiasi. 
Studi Perencanaan Pengendalian Waktu Pelaksanaan Pada Pengembangan Kawasan Rumah Sewa Kecamatan Tenggarong Suharto Suharto; Benny Mochtar
Kurva S : Jurnal Keilmuan dan Aplikasi Teknik Sipil Vol 4, No 3 (2016)
Publisher : Department of Architecture, Faculty of Engineering

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (36.188 KB) | DOI: 10.31293/teknikd.v4i3.2503

Abstract

Mengontrol waktu proses penentuan dicapai, evaluasi kerja, dan perbaikan jika perlu. Keberhasilan atau kegagalan proyek yang disebabkan oleh perencanaan tidak maxsimal dan pengendalian kurang efektif, sehingga aktivitas proyek tidak efisien. Sebagai konsekuensi dari dampak menderita keterlambatan proyek ini, penurunan kualitas, dan meningkatkan kinerja biaya.              Perencanaan waktu mengendalikan dengan metode Kritis Jalur Metode adalah salah satu cara manajemen yang dapat digunakan untuk perencanaan dan tugas pengendalian dalam proyek yang dapat menunjukkan perencanaan waktu sekarang dan aktivitas antara proyek. Begitu juga dengan proyek Microsoft kita bisa mengambil mengendalikan keuangan dan pelacakan fitur buget, oleh karena itu kita dapat menetapkan tampil biaya proyek dan tugas Program. Oleh karena itu, kita dapat mengetahui waktu pelaksanaan perencanaan dengan menggunakan kedua metode.              Dalam penelitian ini menulis upaya untuk menggambarkan dan menjelaskan bagaimana proses perencanaan pengendalian waktu pembangunan distric sewa rumah Tenggarong menggunakan metode kedua. Hasil penelitian menunjukkan durasi optimal direncanakan pengalaman 180 hari banyak waktu kritis perlu dioptimalkan kembali
ANALISIS KINERJA WAKTU DAN BIAYA DENGAN METODE NILAI HASIL (EARNED VALUE METHOD) STUDY KASUS : PENINGKATAN STRUKTUR JALAN DESA SANTAN ULU KEBUPATEN KUTAI KARTANEGARA Muhammad Ali Yusran; Benny Mochtar; Tukimun, Tukimun
Media Bina Ilmiah Vol. 19 No. 11: Juni 2025
Publisher : LPSDI Bina Patria

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Time and cost control are crucial aspects of successful construction project management. This study aims to analyze the cost and schedule performance of the Road Structure Capacity Improvement Project in Santan Ulu Village, Kutai Kartanegara Regency using the Earned Value Method (EVM). Data were collected directly from the project and analyzed to assess performance as of the 13th week, as well as to estimate the final project cost and duration. The results indicate that the project’s cost performance was efficient, with a Cost Performance Index (CPI) greater than 1, signifying that the actual cost was lower than the earned value. In terms of schedule, the project also showed positive performance, with a Schedule Performance Index (SPI) equal to 1 up to the 13th week, indicating that the project was progressing as planned. The estimated final cost of the project (Estimate at Completion/EAC) was Rp. 2,115,004,928.56, lower than the initial budget of Rp. 4,318,631,600.41, while the estimated completion time remained consistent with the original plan of 17 weeks. These findings demonstrate that the project was managed efficiently and on schedule. The EVM method has proven effective in providing a comprehensive overview of project performance and is thus recommended as a decision-support tool in construction project management
ANALISA KEANDALAN PROTEKSI KEBAKARAN DAN LEDAKAN ANJUNGAN LEPAS PANTAI MAHAKAM YANG TERINTEGRASI DENGAN EMERGENCY SHUTDOWN SYSTEM Ervandi Ary Rahmadhani; Habir, Habir; Benny Mochtar
Media Bina Ilmiah Vol. 19 No. 11: Juni 2025
Publisher : LPSDI Bina Patria

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This study aims to analyze the influence of tourist attractions, facilities, and promotions on the number of tourists visiting Celosia Flower Park. The selection of this topic is based on the importance of the role of the destination as one of the main attractions in its area, but faces challenges in maintaining the consistency of the number of tourist visits. The method used is quantitative with a survey approach, using a questionnaire as an instrument for data collection. The sample consisted of visitors to Celosia Flower Park, and the data was analyzed using multiple linear regression techniques using SPSS software. The results showed that the three independent variables of tourist attractions, facilities, and promotions had a significant effect both simultaneously and partially on the number of tourist visits. Promotion proved to be the most dominant factor, followed by attractions and facilities. The R Square value of 0.653 indicates that the model can explain 65.3% of the variation in the number of tourists. These results emphasize the importance of an effective promotion strategy, supported by the development of attractions and improvement of facilities, in order to increase the competitiveness of tourist destinations. This study provides an empirical contribution for tourism managers in designing data-based policies to increase visits sustainably.