KAJIAN KRITERIA PEMILIHAN SUBKONTRAKTOR OLEH KONTRAKTOR UTAMA DENGAN MENGGUNAKAN METODE ANALYTIC HIERARCHY PROCESS(AHP) Messah, Yunita A.; Krisnayanti, Denik Sri; Radja Pono, Rohi D.
Jurnal Teknik Sipil Vol 1, No 3 (2012)
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (112.604 KB)

Abstract

ABSTRACTThe development of the construction process has increased rapidly, where the maincontractor who already get the contract further give it to the subcontractors. This isdue to the complexity of a construction job, so the main contractor requiresspecialist contractors for certain jobs requiring special skills. To obtain suchcompetent subcontractors, it is a must to select the appropriate subcontractors. Inselecting the competent subcontractors, the main contractors assign each individualcriterion. Due to the selection process, it is important for the main contractors toknow and identify the most influential criterion of the subcontractors. This researchis conducted by the main contractors who live in Kota Kupang, East NusaTenggara. The method and data analysis are using AHP method supported byexpert choice software. Subcontractor selection are divided into six aspects: generalaspects, financial aspects, technical aspects, managerial aspects, safety aspects andaspects of the company's reputation. As a result, aspect that influences the selectionof subcontractors is the financial aspect. While the criteria that influence the valueof criteria deals and sub criteria with the lowest value.ABSTRAKProses pelaksanaan konstruksi semakin berkembang, dimana kontraktor utamayang mendapatkan kontrak (pekerjaan) selanjutnya memecah pekerjaan tersebutdan membagi (menyerahkan) kepada subkontraktor. Hal ini disebabkan olehsemakin kompleks suatu pekerjaan konstruksi, sehingga kontraktor utama sebagaipelaksana konstruksi membutuhkan kontraktor spesialis khusus untuk pekerjaanpekerjaantertentu yang membutuhkan keahlian khusus.Untuk mendapatkansubkontraktor yang berkompeten, maka perlu diadakan pemilihansubkontraktor.Dalam pemilihan subkontraktor, tiap kontraktor utama menetapkankriterianya masing-masing.Oleh karena itu perlu untuk mengetahui kriteria-kriteriayang paling berpengaruh di dalam pemilihan subkontraktor oleh kontraktorutama.Penelitian ini dilakukan pada kontraktor utama dengan jenis perusahaanBadan Usaha Milik Negara (BUMN) dan perusahaan Swasta Nasional yangberdomisili di wilayah Kota Kupang, Propinsi Nusa Tenggara Timur.Adapunteknik pengolahan dan analisa data menggunakan metode AHP dengan memakaibantuan software expert choice. Ketentuan pemilihan subkontraktor dibagi dalam 6aspek yaitu: aspek umum, aspek keuangan, aspek teknis, aspek manajerial, aspekkeselamatan kerja dan aspek reputasi perusahaan. Dari setiap aspek tersebutterangkum beberapa kriteria dan sub kriteria yang mendukung.Dari hasil penelitiandapat diketahui bahwa aspek yang berpengaruh dalam pemilihan subkontraktoroleh kontraktor utama dengan jenis perusahaan Badan Usaha Milik Negara (BUMN) adalah aspek keuangan dengan bobot 31,6% dan kriteria yang palingberpengaruh adalah kriteria nilai penawaran dengan bobot 14,5% dengan subkriteria nilai penawaran terendah dengan bobot 12,4%. Sedangkan aspek yangberpengaruh dalam pemilihan subkontraktor oleh kontraktor utama dengan jenisperusahaan Swasta Nasional adalah aspek keuangan dengan bobot 27,1% dankriteria yang paling berpengaruh adalah kriteria nilai penawaran dengan bobot9,7% dengan sub kriteria nilai penawaran terendah dengan bobot 9,1%.
ANALISIS BIAYA PRODUK ASPHALT MIXING PLANTS (AMP) DI PULAU TIMOR Messah, Yunita A.; Bella, Rosmiyati A.; Klomang, Gerry B.
Jurnal Teknik Sipil Vol 5, No 1 (2016): JURNAL TEKNIK SIPIL
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (354.766 KB)

Abstract

Pada proses produksi dan distribusihotmix, jarak antara sumber material dan jarak antara lokasi permintaan hotmix dengan AMP akanberpengaruh pada biaya transportasi dan kualitas campuran yang dikirim ke lokasi pekerjaan. Penelitian dilakukan pada lokasi-lokasi yang terdapat Asphalt Mixing Plant (AMP) di Pulau Timor.Metode penelitian yang dilakukan ialah dengan observasi langsung (survei) ke lokasi dan melakukan wawancara langsung.Teknik pengolahan dan analisis data menggunakan analisa perhitungan produktivitas alat dan perhitungan biaya.Berdasarkan hasil penelitian menunjukkan bahwa terdapat 12 unit AMP di Pulau Timor, dengan rincian 4 unit AMP di Kabupaten Kupang, 2 unit AMP di Kabupaten Timor Tengah Selatan (TTS), 2 unit AMP di Kabupaten Timor Tengah Utara (TTU), dan 4 unit AMP di Kabupaten Belu. Berdasarkan lokasi-lokasi tersebut, maka setelah dilakukan analisis perhitungan produktivitas kerja alat dan biaya maka diketahui bahwa produktivitas kerja alat sangat mempengaruhi waktu pekerjaan sebuah proyek jalan yang menggunakan hotmix, di mana dengan angka produktivitas kerja alat yang rendah akan mengakibatkan biaya yang digunakan untuk pekerjaan proyek jalan semakin besar, dan juga kualitas hotmix yang digunakan akan berkurang.
KAJIAN PERSEPSI PELAKU JASA KONSTRUKSI TENTANG KEGIATAN PENGADAAN JASA KONSTRUKSI Messah, Yunita A.; Asmat, Maria Y.Y.; Rizal, H. A.
Jurnal Teknik Sipil Vol 2, No 1 (2013): Jurnal Teknik Sipil
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (134.732 KB)

Abstract

The The implementation of e-procurement has been used since 2010 in NTT expecially in Kupang and believed could bring up effectively, fairly, efficiently , transparently andakuntability so it is expected to could minimalize the deceitful happened. Therefore it is needed to known if there was the deceitful of construction service conventionally and wich steps in procurement of construction service wich giving chance for deceitful to be happened and could e-procurement could minimalize the deceitful happened on that steps. This research was conducted on service users in Department of public work NTT province and Department of public work in Kupang City and service provider wich has central office and branch office in Kupang city. The technique of data processing and analysis was used Likert Scale. From the result of research could be known that respondent agree there was deceitful on the construction service conventionally with the percentage of the user service is about 77,33%, the contractor is about 81,84% and the consultant is about 78,96%. From the deceitful of conventionall system, it have five step on the construction service conventionall wich often happened is the auction announcement. The input of proposal document the provement of qualification, clarification and negotiation, and winner announcement. From those five steps, three of those were the steps those of auction announcement the input of proposal document and winner announcement could be minimalized the deceitful by e-procurement. While on the step of the provement of qualification, clarification and negotiation it could not minimalized by the e-procurement because there is still happening of the direct meeting in this steps.
KAJIAN TARIF ANGKUTAN UMUM BERDASARKAN BIAYA OPERASIONAL KENDARAAN (BOK), ABILITY TO PAY (ATP) DAN WILLINGNESS TO PAY (WTP) DI KABUPATEN TTS Frans, John H.; Messah, Yunita A.; Issu, Nicky T.
Jurnal Teknik Sipil Vol 5, No 2 (2016): JURNAL TEKNIK SIPIL
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (898.818 KB)

Abstract

Public transport is being part of human prime need, and also a community transport system, but if we don?t manage it well, it makes problem for the supplier and public transport assessors. This research is to get to know the rate based on the VOC (Vehicle Operational Cost), the Ability To Pay (ATP), and Willingness To Pay (WTP) for the service of public transport in the town of Soe. The observed tract for this public transport is in the Haumeny Terminal to Pasar Inpress Kota Soe, and the New Terminal to Pasar Inpress Kota Soe. The VOC analysis will adapting two kinds of methods, those are from the public work department raisd in year 2005 (Pd.T-15-2005-B) and the method from Directorate General for land transportation number SK.687/AJ.206/DRJD/2002. And for the analysis of ATP and WTP are using the cross tabulation method and travel budget. Trough this research, is known that the real rate is bigger than the counting rate outcome. The real rate is Rp. 3000,00 while the counting rate based on the VOC from the directorate general for land transport is Rp.2205,27 and Rp.1962,14, and for the public work department is Rp. 2621,89 and Rp. 2059,73. The rate for ATP is Rp.2.752,05 and the rate for WTP is Rp. 1.995,50.
KAJIAN IMPLEMENTASI Messah, Yunita A.; Bolu Tena, Yohana; Udiana, I Made
Jurnal Teknik Sipil Vol 1, No 4 (2012)
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (80.916 KB)

Abstract

The complexity of the construction work, the risk of workplace accidents become higher, so the Health and Safety Work Management System (SMK3) important to be implemented in the construction company. Therefore, it is necessary to know how far the extent of implementation SMK3 especially in construction services company in Kupang City. This study used the questionnaire. The result of questionnaires data collection is processed using the Normalization de Boer formula and analyzed with concept of Traffic Light System. The survey results revealed that the percentage of SMK3 implementation in construction services company in Kota Kupang is 62.38% (yellow category) and the accident rate is on the green category. This explained that SMK3 implementations are at level 2 (safe enough). Based on the type of company, BUMN enterprises have SMK3 implementation of 87.10% and domestic private firms by 56.06%. SMK3 implementation for 5-10 year-old company at 47.85%, 10-20 years-old company at 54.18%, and the company aged > 20 years at 79.74%. The provisions of SMK3 largely have been done by construction companies. The ten provisions have been done mostly are applied of the K3 set policy, identify the hazards that will occur, to provide funds for the implementation of K3, control determines the risk of accidents, regulations made under the laws of K3, P3K facilities in sufficient quantity, create goals and objectives to be achieved, all parties involved in construction services companies should play a role in maintaining and controlling the implementation of the K3, the division of duties and responsibilities are clear and the implementation of controls to manage risks K3.
KAJIAN KRITERIA PEMILIHAN SUBKONTRAKTOR OLEH KONTRAKTOR UTAMA DENGAN MENGGUNAKAN METODE ANALYTIC HIERARCHY PROCESS(AHP) Messah, Yunita A.; Krisnayanti, Denik Sri; Radja Pono, Rohi D.
Jurnal Teknik Sipil Vol 1, No 3 (2012)
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (112.604 KB)

Abstract

ABSTRACTThe development of the construction process has increased rapidly, where the maincontractor who already get the contract further give it to the subcontractors. This isdue to the complexity of a construction job, so the main contractor requiresspecialist contractors for certain jobs requiring special skills. To obtain suchcompetent subcontractors, it is a must to select the appropriate subcontractors. Inselecting the competent subcontractors, the main contractors assign each individualcriterion. Due to the selection process, it is important for the main contractors toknow and identify the most influential criterion of the subcontractors. This researchis conducted by the main contractors who live in Kota Kupang, East NusaTenggara. The method and data analysis are using AHP method supported byexpert choice software. Subcontractor selection are divided into six aspects: generalaspects, financial aspects, technical aspects, managerial aspects, safety aspects andaspects of the company's reputation. As a result, aspect that influences the selectionof subcontractors is the financial aspect. While the criteria that influence the valueof criteria deals and sub criteria with the lowest value.ABSTRAKProses pelaksanaan konstruksi semakin berkembang, dimana kontraktor utamayang mendapatkan kontrak (pekerjaan) selanjutnya memecah pekerjaan tersebutdan membagi (menyerahkan) kepada subkontraktor. Hal ini disebabkan olehsemakin kompleks suatu pekerjaan konstruksi, sehingga kontraktor utama sebagaipelaksana konstruksi membutuhkan kontraktor spesialis khusus untuk pekerjaanpekerjaantertentu yang membutuhkan keahlian khusus.Untuk mendapatkansubkontraktor yang berkompeten, maka perlu diadakan pemilihansubkontraktor.Dalam pemilihan subkontraktor, tiap kontraktor utama menetapkankriterianya masing-masing.Oleh karena itu perlu untuk mengetahui kriteria-kriteriayang paling berpengaruh di dalam pemilihan subkontraktor oleh kontraktorutama.Penelitian ini dilakukan pada kontraktor utama dengan jenis perusahaanBadan Usaha Milik Negara (BUMN) dan perusahaan Swasta Nasional yangberdomisili di wilayah Kota Kupang, Propinsi Nusa Tenggara Timur.Adapunteknik pengolahan dan analisa data menggunakan metode AHP dengan memakaibantuan software expert choice. Ketentuan pemilihan subkontraktor dibagi dalam 6aspek yaitu: aspek umum, aspek keuangan, aspek teknis, aspek manajerial, aspekkeselamatan kerja dan aspek reputasi perusahaan. Dari setiap aspek tersebutterangkum beberapa kriteria dan sub kriteria yang mendukung.Dari hasil penelitiandapat diketahui bahwa aspek yang berpengaruh dalam pemilihan subkontraktoroleh kontraktor utama dengan jenis perusahaan Badan Usaha Milik Negara (BUMN) adalah aspek keuangan dengan bobot 31,6% dan kriteria yang palingberpengaruh adalah kriteria nilai penawaran dengan bobot 14,5% dengan subkriteria nilai penawaran terendah dengan bobot 12,4%. Sedangkan aspek yangberpengaruh dalam pemilihan subkontraktor oleh kontraktor utama dengan jenisperusahaan Swasta Nasional adalah aspek keuangan dengan bobot 27,1% dankriteria yang paling berpengaruh adalah kriteria nilai penawaran dengan bobot9,7% dengan sub kriteria nilai penawaran terendah dengan bobot 9,1%.
ANALISA INDEKS BIAYA UNTUK PEKERJAAN BETON BERTULANG DENGAN MENGGUNAKAN METODE SNI 7394-2008 DAN LAPANGAN (Studi Kasus pada Proyek Pembangunan Asrama STIKES CHMK Tahap III) Messah, Yunita A.; Sina, Dantje A. T.; Manubulu, Christiani C.
Jurnal Teknik Sipil Vol 2, No 1 (2013): Jurnal Teknik Sipil
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (430.801 KB)

Abstract

The index cost affect the amount of unit price construction work. Cost index used in the calculation analysis of unit price refers to the Standar Nasional Indonesia (SNI). SNI describe about the average labor productivity in Indonesia. Labor productivity are different depend on work experience, cultural origins, and the others. This study was conducted to know the costs index of labor in Kupang by took one of case study on STIKES CHMK Dormitory Construction Project in third Phased. Cost index of reinforced concrete in this project, obtained by doingreal observation for the total of labor and time required to complete each item of reinforced concrete, especially the workfrom column,beam and plate and it began from the work of iron, formwork, casting up to demolition formwork.Then the observationsresult were analyzed descriptively. Based on the analysis result, the amount of the cost index is 0.0208 foreman: 0.0377 the head of handyman: 0.09929 handyman: 0.2502 worker to install 1m2 formwork, 0.0044 foreman: 0.0177 the head of handyman: 0.0268 handyman : 0.0796 worker to work 10 kg iron, and 0.0340 foreman: 0.0272 the head of handyman: 0.1427 handyman: 1.1888 worker to make 1m3concrete. This index used in the analysis of the differentation of labor presentage based on SNI and field method and continued with the calculation of unit price for each work item which used SNI and field method.
KAJIAN PENERAPAN REKAYASA LALU LINTAS SISTEM SATU ARAH PADA SIMPANG TIGA STRAAT A KOTA KUPANG Bolla, Margareth E.; Messah, Yunita A.; Johanes, Lauren
Jurnal Teknik Sipil Vol 4, No 2 (2015)
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (276.618 KB)

Abstract

Hasil penelitian simpang tiga bersinyal Straat A Kota Kupang yang dilakukan oleh Frans (2014), menyimpulkan bahwa kondisi kinerja simpang berada pada tingkat pelayanan F. Untuk mengatasi masalah tersebut maka pada penelitian ini dilakukan rekayasa lalu lintas berupa penerapan sistem lalu lintas satu arah pada simpul simpang tiga Straat A tersebut, yang meliputi ruas jalan A.Yani, Jalan Flores, dan Jalan Sumba. Pengolahan dan analisa data menggunakan MKJI 1997. Hasil penelitian menunjukkan kinerja Simpang Tiga Straat A dengan penerapan sistem lalu lintas satu arah dikategorikan dalam tingkat pelayanan B yaitu arus stabil, kepadatan rendah, pengemudi masih punya cukup kebebasan memilih kecepatan. Kinerja lalulintas pada ruas jalan yang dipengaruhi adalah ruas jalan A. Yani dengan volume kendaraan maksimum jam puncak 1.646 smp/jam, hambatan samping tergolong sedang, kecepatan aktual 48 km/jam, derajat kejenuhan 0,48 dan tingkat pelayanan C; Pada ruas jalan Sumba, volume kendaraan maksimum jam puncak 1.509 smp/jam, hambatan samping sedang, kecepatan aktual 50 km/jam, derajat kejenuhan 0,48 dan tingkat pelayanan C; Ruas Jalan Flores, volume kendaraan maksimum jam puncaknya adalah 1.342,9 smp/jam, hambatan samping sedang, kecepatan aktual 44 km/jam, derajat kejenuhan 0,48 serta tingkat pelayanan C. Sehingga dapat disimpulkan bahwa penerapan sistem lalu lintas satu arah pada simpang tiga Straat A layak dilakukan. Based on the previous research on the three-legged signalized intersections on Straat A in Kupang City (Frans, 2014), the result showed that the performance was at F level of service. To overcome this problem, this research was conducted by apply the traffic engineering that is the one-way traffic system on the Straat A intersection that covers A. Yani, Flores and Sumba Roads. Data processing and analysis were done using the Indonesian Highway Capacity Manual (MKJI, 1997). The result showed that the performance of Straat A intersection with the implementation of one-way traffic system is categorized at Level of Service (LoS) B that is has steady traffic flow, low traffic density, and the driver still has enough freedom to choose the speed. The traffic performance of the roads that were affected by one way traffic system are as follow: 1. On A. Yani road, the maximum peak hour volume is 1.646 pcu/hour, the side friction is classified medium, the actual speed is 48 kph, the degree of saturation is 0.48 and LoS is at C level; 2. On Sumba road, the maximum peak hour volume is 1509 pcu/hour, the side friction is classified medium, the actual speed is 50 kph, the degree of saturation is 0.48, and LoS level is at grade C; 3. On Flores Road, the maximum peak hour volume is 1.342,9 pcu/hour, the side friction is also classified medium, the actual speed is 44 kph, the degree of saturation is 0.48 and the LoS level is at grade C too. Thus, it can be concluded that the implementation of one-way traffic system on the three-legged intersection Straat A is feasible.
KAJIAN PENERAPAN GREEN PROCUREMENT PADA PROYEK INFRASTRUKTUR JALAN DI PROVINSI NUSA TENGGARA TIMUR Messah, Yunita A.; Utomo, Sudiyo; Ballo, Angelica S. C.
Jurnal Teknik Sipil Vol 5, No 2 (2016): JURNAL TEKNIK SIPIL
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (269.857 KB)

Abstract

The issue of global warming and climate change is an environmental issue that the world's problems. Countermeasures are now established is sustainable development. One factor supporting sustainable development is an alternative device in the areas of procurement, that is green procurement. Determining the winner of the procurement system is noticed additional aspects, namely social, economic and environmental which in practice is still not determined the weight of each of the environmentally friendly aspects. The purpose of this study was to determine the weighting of the criteria for selecting a winner in the green procurement system and determine the relationship between environmental criteria. Data analysis technique using Analytical Network Process, in order to obtain a priority basis and weighting of each criterion so that it can be described the relationship between the criteria. The results of the study in the opinion of all respondents consisting of qualified contractors large and medium enterprises as well as the Procurement Services Unit predominant aspects in the procurement of environmentally friendly is a social aspect to the criteria that affect the human resources with the weight percentage is 10.40%. In these criteria there are sub-criteria that support namely the availability of experts and skilled workers, the availability of experts and skilled workers by level of education and experience as well as working procedures with the weight percentage of each sub-criteria 33,33%.
PENGENDALIAN WAKTU DAN BIAYA PEKERJAAN KONSTRUKSI SEBAGAI DAMPAK DARI PERUBAHAN DESAIN Messah, Yunita Afliana; Lona, Lazry Hellen Paula; Sina, Dantje A. T.
Jurnal Teknik Sipil Vol 2, No 2 (2013): Jurnal Teknik Sipil
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (3053.519 KB)

Abstract

The purpose of this study is to describe the effect of changing control of the design that have an impact on the time and cost of construction work that affects the performance of construction work Embung Irrigation Oenaem. This study used two methods of controlling the Earned Value Analysis (EVA) and integrated method of shortening the duration of the critical path (Crashing Length) at Critical Path Method (CPM) using the application as an alternative to controlling overtime. To use of the two methods mentioned above it can be seen and obtained alternative pengedalian time and construction costs as a result of design changes that occurred in the Irrigation Development Project Embung Oenaem. Based on the analysis that had been done when a deviation occurs at 7 weeks, the total work period to 37 weeks from 30 weeks the amount of time a plan with estimated cost is Rp. 9,489,206,129.03. Then controlled using the method of shortening the duration (Crashing Length) with future application of the overtime work to 35 weeks (5 weeks delay) with the amount of the cost of Rp. 9.458.239.978,70 (excluding VAT) of the total contract value of Rp. Rp. 8.563.635.912,98 (excluding VAT 10%).