Claim Missing Document
Check
Articles

Found 8 Documents
Search

PEMANFAATAN PEMBANGKIT LISTRIK HYBRID DALAM MENDUKUNG ELEKTRIFIKASI DI KAWASAN JAVAN LANGUR CENTRE KOTA BATU JAWA TIMUR Mohammad Noor Hidayat; Ferdian Ronilaya; Irwan Heryanto/Eryk; Sapto Wibowo; Lukman Hakim
Panrita Abdi - Jurnal Pengabdian pada Masyarakat Vol. 5 No. 4 (2021): Jurnal Panrita Abdi - Oktober 2021
Publisher : LP2M Universitas Hasanuddin

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.20956/pa.v5i4.11286

Abstract

Javan Langur Center (JLC) is a Javan Langur rehabilitation center located approximately 10 km from the center of Batu city, East Java. To support activities at this rehabilitation center, electrical energy is needed, especially to meet the needs of lighting facilities and the operation of a primate baby incubator machine. To date, no electricity distribution network from the State Electricity Company (PLN) has entered the area. To meet these electricity needs, the electricity supply is obtained from a gen-set owned by residents which is approximately 2 km from the JLC. This Community Service Program was carried out between February and August 2020 with activities in the form of the construction of a hybrid power plant to meet the electricity needs of the JLC. The hybrid power plant that is installed is a combination of pico-hydro power plant technology (PLTPH) and solar power plant (PLTS). During the implementation of the program, there were two activity partners who played an active role, namely The Aspinall Foundation Indonesia Program (JLC manager) and the Javan Lutung Conservation Community, with a total of about 10 personnel. The result of this community service program is the installation and operation of a hybrid power generation system, which consists of a 300-watt pico-hydro power plant and a 200-watt peak solar power plant. With this hybrid power plant, the electricity needs in the JLC area for lighting and operating the Lutung baby incubator machine, with a total power of 180 watts, can be met. In addition, to maintain the sustainability of the operation and maintenance of the hybrid power plant, a transfer of knowledge and skills has been carried out to partners, namely The Aspinal Foundation Indonesia Program and the Javan Lutung Conservation Community. --- Javan Langur Center (JLC) adalah pusat rehabilitasi Lutung Jawa yang terletak lebih kurang 10 km dari pusat kota Batu, Jawa Timur. Untuk menunjang kegiatan di pusat rehabilitasi ini, energi listrik sangat dibutuhkan, terutama untuk memenuhi kebutuhan fasilitas penerangan dan pengoperasian mesin inkubator bayi primata. Sampai saat ini, belum ada jaringan distribusi listrik dari Perusahaan Listrik Negara (PLN) yang masuk di kawasan ini. Untuk memenuhi kebutuhan listrik tersebut,  pasokan energi listrik didapatkan dari gen-set milik warga yang jaraknya kurang lebih 2 km dari JLC. Program Pengabdian Kepada Masyarakat ini dilaksanakan antara bulan Pebruari sampai bulan Agustus 2020 dengan kegiatan berupa pembangunan pembangkit listrik hybrid untuk memenuhi kebutuhan listrik di JLC. Pembangkit listrik hybrid yang dipasang merupakan penggabungan teknologi pembangkit listrik tenaga pikohidro (PLTPH) dan pembangkit listrik tenaga surya (PLTS). Selama pelaksanaan program, ada dua mitra kegiatan yang berperan aktif, yakni The Aspinall Foundation Indonesia Program (pengelola JLC) dan Komunitas Konservasi Lutung Jawa, dengan total personel sekitar 10 orang. Hasil program pengabdian kepada masayarakat ini berupa pemasangan dan pengoperasian sistem pembangkit tenaga listrik hybrid, yang terdiri atas pembangkit listrik tenaga piko hidro berkapasitas 300 watt dan pembangkit listrik tenaga surya berkapasitas 200 watt peak. Dengan adanya pembangkit listrik hybrid ini, maka kebutuhan listrik di area JLC untuk penerangan dan pengoperasian mesin inkubator bayi Lutung, dengan total daya 180 watt dapat terpenuhi. Selain itu, untuk menjaga keberlangsungan pengoperasian dan pemeliharaan pembangkit tenaga listrik hybrid tersebut, telah dilakukan transfer pengetahuan dan keterampilan kepada pihak mitra kerja, yakni The Aspinal Foundation Indonesi Program dan Komunitas Konservasi Lutung Jawa.
Pelatihan Dasar Instalasi Sel Surya untuk Remaja Di RW 12 Dusun Klandungan Desa Landungsari Irwan Heryanto; M. Noor Hidayat; Ferdian Ronilaya; Sapto Wibowo; Ika Noer Syamsiana
Jurnal Pengabdian Polinema Kepada Masyarakat Vol. 9 No. 1 (2022): Jurnal Pengabdian Polinema Kepada Masyarakat
Publisher : UPT Penelitian dan Pengabdian Kepada Masyarakat Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/jppkm.v9i1.133

Abstract

Kegiatan pengabdian kepada masyarakat ini dilaksanakan untuk meningkatkan pengetahuan khususnya remaja di RW 12 Desa Landungsari tentang pentingnya energi yang ramah lingkungan serta pemanfaatannya di bidang kelistrikan. Instalasi panel surya menjadi suatu keniscayaan dalam pemanfaatan energi bersih dan renewable, mengingat energi matahari merupakan energi yang cukup besar tersedia dan ramah lingkungan. Penggunakan energi tersebut dalam kehidupan sehari-hari membutuhkan pengenalan awal dan dasar pengetahuan pemanfaatan energi matahari sebagai sumber energi listrik. Dari hasil akhir pelatihan ini, peserta pelatihan dapat mengetahui bahwa energi matahari dapat dimanfaatkan secara luas di bidang ketenagalistrikan, melalui sel surya. Dalam sesi praktek, Nilai rata-rata tegangan output panel 20 Wp dan 50 Wp di kisaran 16 Volt pada saat terkena sinar matahari langsung.
PENERAPAN MESIN PENIRIS MINYAK DAN PEMASARAN ONLINE UNTUK KERIPIK BELUT DAN PARE DI DESA PLOSO Sapto Wibowo; Ratna Ika Putri; Erfan Rohadi; Amalia
Panrita Abdi - Jurnal Pengabdian pada Masyarakat Vol. 7 No. 1 (2023): Jurnal Panrita Abdi - Januari 2023
Publisher : LP2M Universitas Hasanuddin

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.20956/pa.v7i1.18226

Abstract

Eel and bitter melon chips are processed foods that many favours because of their benefits. This activity is intended to train partners, namely the Jaya Makmur group in Ploso Village, Blitar Regency, to make eel and bitter melon chips. This activity aims to improve the quality of chips produced by using an oil-draining machine, reducing the oil content of the chips so that the chips become crispier, tastier and more durable. The method of implementing this activity is the method of observation, planning and preparation, and production. The results of this activity are in the form of quality and durability of eel and bitter melon chips, as well as product marketing that is no longer manual. So far, the marketing of paring and eel chips has only been done manually around the village with the COVID-19 pandemic, resulting in a significant decrease in sales, so efforts are needed to expand the marketing network can reach out of town. One alternative that can be done is by using an online website as a marketing tool. http://camilan-sariroso.com/ is a website link created and used for online marketing of eel and bitter melon chips produced by partners. --- Keripik belut dan pare merupakan hasil olahan makanan yang digemari oleh banyak orang karena manfaatnya. Kegiatan ini ditujukan untuk memberikan pelatihan kepada mitra yaitu kelompok Jaya Makmur di Desa Ploso Kabupaten Blitar dalam proses pembuatan keripik belut dan pare. Tujuan dari kegiatan ini adalah untuk meningkatkan kualitas keripik yang dihasilkan dengan menggunakan mesin peniris minyak, maka dapat mengurangi kadar minyak pada keripik sehingga keripik menjadi lebih renyah, lebih enak dan lebih tahan lama. Metode pelaksanaan kegiatan ini adalah metode observasi, perencanaan dan persiapan, serta produksi. Hasil dari kegiatan ini yaitu berupa keripik belut dan pare yang berkualitas dan tahan lama, serta pemasaran produk yang tidak lagi manual. Pemasaran keripik pare dan belut yang selama ini hanya dilakukan secara manual di sekitar desa, dengan adanya pandemi COVID-19 mengakibatkan penurunan penjualan yang cukup signifkan sehingga diperlukan usaha untuk memperluas jaringan pemasaran yang dapat menjangkau ke luar kota. Salah satu alternatif yang dapat dilakukan dengan menggunakan website online sebagai sarana pemasaran. http://camilan-sariroso.com/ merupakan link webiste yang telah dibuat dan digunakan untuk pemsaran online keripik belut dan pare yang diproduksi mitra dengan label Sari Roso. 
PEMANFAATAN SUMBER DAYA AIR UNTUK PEMBANGKIT LISTRIK TENAGA PIKO HIDRO DI KAWASAN COBAN TARZAN KECAMATAN JABUNG KABUPATEN MALANG Mohammad Noor Hidayat; Ferdian Ronilaya; Irwan Heryanto Eryk; Sapto Wibowo; Muhammad Fahmi Hakim
Panrita Abdi - Jurnal Pengabdian pada Masyarakat Vol. 7 No. 1 (2023): Jurnal Panrita Abdi - Januari 2023
Publisher : LP2M Universitas Hasanuddin

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.20956/pa.v7i1.20585

Abstract

The natural tourist area of ​​Coban Tarzan waterfall, Jabung District, Malang Regency, is ± 25 km from Malang City. Until now, the fulfillment of electricity needs is obtained from generator sets owned by residents. This area has not yet received an electricity supply from the State Electricity Company (PLN). To overcome these problems, one way that can be done is to utilize existing water resources in the area as a source of electrical energy through the application of a pico-hydro power plant system. The purpose of this community service program is to build a pico-hydro power plant in the natural tourist area of ​​the Coban Tarzan waterfall with a generating capacity of 270 watts. This activity starts from April to November 2021. In carrying out this community service program, there are two activity partners, namely the Coban Tarzan Waterfall Natural Tourism Area Manager and the Sukopuro Forest Management Resort (RPH), with 6 personnel. The method used in the community service program includes 2 aspects, namely the physical aspect in the form of the construction of a pico-hydro power plant and the non-physical aspect in the form of transferring knowledge and skills to work partners regarding the operation and maintenance of the power plant. The results of this community service program are installing and operating a pico-hydro power plant with a capacity of 270 watts. With this power plant, the electricity needs in the Coban Tarzan Waterfall Natural Tourism Area can be met with a total power of around 150 watts. For a pico-hydro power plant to operate according to its capacity, it is necessary that the operation and maintenance of system equipment be carried out correctly and on a scheduled basis.  ---  Kawasan wisata alam air terjun Coban Tarzan, Kecamatan Jabung, Kabupaten Malang berjarak ± 25 km dari Kota Malang. Sampai saat ini, pemenuhan kebutuhan listrik didapatkan dari genset (generator set) milik warga dikarenakan kawasan ini belum mendapatkan pasokan listrik dari Perusahaan Listrik Negara (PLN). Untuk mengatasi permasalahan tersebut, salah satu cara yang dapat dilakukan adalah dengan memanfaatkan sumber daya air yang ada di kawasan tersebut sebagai sumber energi listrik melalui penerapan teknologi pembangkit listrik tenaga piko hidro. Tujuan program pengabdian kepada masyarakat ini adalah untuk membangun suatu pembangkit listrik tenaga piko hidro di kawasan wisata alam air terjun Coban Tarzan dengan kapasitas pembangkit sebesar 270 watt. Kegiatan ini dimulai  pada bulan April sampai bulan November 2021. Dalam menjalankan program pengabdian kepada masyarakat ini, terdapat dua mitra kegiatan, yakni Pengelola Kawasan Wisata Alam Air Terjun Coban Tarzan dan Resort Pemangkuan Hutan (RPH) Sukopuro dengan total jumlah personel 6 orang. Metode yang dilakukan dalam program pengabdian kepada masyarakat meliputi 2 aspek, yakni  aspek fisik berupa pembangunan pembangkit listrik tenaga piko hidro dan aspek non fisik berupa transfer pengetahuan dan keterampilan kepada pihak mitra kerja mengenai pengoperasian dan perawatan pembangkit listrik tersebut. Hasil program pengabdian kepada masayarakat ini berupa pemasangan dan pengoperasian pembangkit listrik tenaga piko hidro berkapasitas 270 watt. Dengan adanya pembangkit listrik ini, maka kebutuhan listrik di kawasan Kawasan Wisata Alam Air Terjun Coban Tarzan dapat terpenuhi dengan total daya sekitar 150 watt. Agar pembangkit listrik tenaga piko hidro dapat beroperasi sesuai dengan kapasitasnya, maka perlu pengoperasian dan perawatan terhadap peralatan sistem haruis dilakukan secara benar dan terjadwal.
Pemodelan dan simulasi kinematika robot swerve 4 roda Indrazno Siradjuddin; Sapto Wibowo; Arta Ainur Rofiq
JURNAL ELTEK Vol 20 No 1 (2022): ELTEK Vol 20 No 1
Publisher : Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (918.165 KB) | DOI: 10.33795/eltek.v20i1.301

Abstract

Pemodelan kinematika berperan penting dalam mengontrol perpindahan robot. Perpindahan robot tidak semata menentukan koordinat awal dan akhir, tetapi juga menentukan kecepatan masing-masing motor yang dibutuhkan untuk mencapai posisi yang diinginkan. Pada penelitian ini, pengembangan algoritma kontrol kinematika untuk mengontrol pergerakan diterapkan pada robot swerve 4 roda. Hal ini bertujuan untuk mengetahui hubungan antara pengerakan robot dengan kecepatan aktuaktor pada ruang 2 dimensi. Metode yang digunakan pada penelitian ini adalah metode motion rigid body analysis. Metode ini digunakan untuk menganalisis hubungan antara pergerakan robot dengan kecepatan aktuaktor kemudian, diimplementasikan pada posisi tujuan yang bersifat diam dan bergerak. Skenario pengujian dilakukan untuk memvalidasi performa dari kontrol algoritma yang ditawarkan dengan cara simulasi, dimana berbantuan bahasa pemrograman python. Hasil simulasi yang ditampilkan bahwa, robot dapat bergerak dari posisi awal menuju posisi tujuan baik pada target diam mapunu bergerak. Target diam, robot mampu bergerak dengan membentuk jalur secara linier menuju posisi rujuan dan target bergerak, robot mampu bergerak dengan membentuk jalur dengan pola angka delapan. Dari hasil simulasi tersebut didapatkan bahwa, efektivitas dari metode rigid body analysis mampu mengatasi permasalahan yang ditawarkan dimana robot mampu bergerak menuju target yang diam dan bergerak dengan pemodalan kinematika yang telah dirancang. Kinematic modeling plays an important role in controlling movement of the robot. Movement of the robot not only determines the start and end coordinates, but also determines the speed of each motor needed to reach the desired position. In this research, the development kinematic control algorithm to control movement of 4-wheel swerve robot. This aims to determine the relationship between the movement of the robot with the speed of the actuator in 2 dimensional space. The method used in this research is motion rigid body analysis. This method is used to analyze the relationship between movement robot with speed of the actuator then, implemented at the destination position which is static and dynamic. The test scenario was carried out to validate the performance of the control algorithm offered by simulation, which was assisted by the python programming language. The simulation results show that the robot can move from its initial position to its destination position, both on static and dynamic targets. The target is static, the robot is able to move by forming a linear path to the target position and the target is dynamic, the robot is able to move by forming a path with a figure eight pattern. From the simulation results, it was found that the effectiveness of the rigid body analysis method was able to overcome the problems offered. Where the robot is able to move towards a static and dynamic target with the kinematics modelling that has been designed.
Rancang Bangun Alat Deteksi Sag Tegangan Menggunakan Sistem Data Logger Arizal Maulana Pratama; Ferdian Ronilaya; Ajeng Bening Kusumaningtyas; Sapto Wibowo
Elposys: Jurnal Sistem Kelistrikan Vol. 8 No. 1 (2021): ELPOSYS vol.8 no.1 (2021)
Publisher : Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (657.677 KB) | DOI: 10.33795/elposys.v8i1.609

Abstract

-This research discusses the design and manufacture of a voltage sag detection device using a data logger system. Voltage sag detection device to detect the presence of voltage sag which is one of the power quality problems in industrial electrical systems. Voltage sag can cause disturbances in electronic components that are sensitive to changes in voltage values. In this device, the voltage sag is detected using a voltage sensor by reading the RMS voltage from the PLN 220V AC source, then it is converted into a digital signal. The digital signal is sent to the ESP32 module to be processed and outputs a voltage value which is then displayed on the LCD Display. The voltage value data collection is carried out every <10ms and the data taken is the voltage value <90% of the rms voltage. The data taken is then saved to a micro SD card and displayed on the LCD Display. Several tests were carried out to ensure the performance of the voltage sag detector as designed. By switching the 110 / 220VAC transformer connected to the voltage sensor for 10 seconds, 12 seconds and 17 seconds. Based on these tests, the voltage sag detector can read and store the voltage sag data when the voltage read is below 90% of the rms voltage.
Perencanaan dan Implementasi Inverter Satu Fasa Pada Pembangkit Listrik Tenaga Pikohidro di Air Terjun Watu Lumpang Mojokerto Rhezal Agung; Naufal Ramadhani Akbar; Sapto Wibowo
Elposys: Jurnal Sistem Kelistrikan Vol. 9 No. 3 (2022): ELPOSYS vol.9 no.3 (2022)
Publisher : Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (613.186 KB) | DOI: 10.33795/elposys.v9i3.641

Abstract

Renewable energy is a real source of energy that is easy and cheap to use, especially water, therefore it is often used for electrical energy generation systems by utilizing river or waterfall flows. One form of utilization is the Picohydro Power Plant (the smallestscale power plant). Where there is energy potential in an area but has not been utilized optimally, by utilizing the flow of waterfalls in Watu Lumpang Pacet Waterfall Tourism Mojokerto Regency using turbines as a drive and generator as a generator. However, because it is generated in the form of Direct Current (DC) electricity, it takes an inverter as a converter that can convert DC voltage to Alternating Current (AC). So it can be used to supply loads that mostly require AC electricity to operate.
Analisis Power Quality Sistem Kelistrikan Pada Apartemen Malang City Point Zahra Mulia Sari; Ahmad Hermawan; Sapto Wibowo
Elposys: Jurnal Sistem Kelistrikan Vol. 7 No. 3 (2020): ELPOSYS vol.7 no.3 (2020)
Publisher : Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (970.234 KB) | DOI: 10.33795/elposys.v7i3.671

Abstract

The use of equipment with a high non-linear load causes a decrease in the quality of power (Power Quality) at Malang City Point Apartment. Power quality analysis is an important requirement in the electrical system and needs special attention to save energyand costs. Savings can be achieved by reducing or even eliminating losses resulting from the use of non-linear loads. This thesis aims topresent the results of an analysis of power quality conditions at Malang City Point Apartments. This analysis includes voltage, current,voltage and current imbalance, power factor, current THD and measured voltage. The system is designed using Web - Based PowerQuality Meter (PM 5110) as a measurement tool, then the results are analyzed and compared with existing standards to evaluate powerquality in Malang City Point Apartments. Among the various power quality problems measured, it was found that the main problems ofpower quality in Malang City Point Apartments were the occurrence of overvoltages and current harmonic distortion. So it is necessary todo repairs on this to overcome the overvoltage by reducing the operation of equipment that has a large load and repairing neutralconductors. Furthermore, to reduce the system harmonics, it is designed by designing a single tuned passive filter and simulated using theETAP software version 16.0.0