Claim Missing Document
Check
Articles

Found 13 Documents
Search

Rancang Bangun Aplikasi Pemesanan Pada Restoran Warung Warisan menggunakan Metode Simple Additive Weighting (SAW) Septa Firdaus, Ahmad Ray; Mulyana, Fajar; Mangatar, Adrian; Jaman, Jajam Haerul
Jurnal Teknologi Sistem Informasi dan Sistem Komputer TGD Vol. 6 No. 2 (2023): J-SISKO TECH EDISI JULI
Publisher : STMIK Triguna Dharma

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.53513/jsk.v6i2.8530

Abstract

UPDATE PUSDATIN
PERANCANGAN ULANG UI/UX WEBSITE LOWONGAN PEKERJAAN DENGAN MENGGUNAKAN METODE DESIGN THINKING PROCESS (STUDI KASUS : infoloker.karawangkab.go.id) Mulyana, Fajar; Hendriadi, Ade Andri; Ridha, Azhari Ali
Jurnal Informatika dan Teknik Elektro Terapan Vol. 13 No. 2 (2025)
Publisher : Universitas Lampung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23960/jitet.v13i2.6255

Abstract

Website Info Loker Karawang, yang dikelola oleh Dinas Tenaga KerjaKabupaten Karawang, memilikikendalasepertinavigasitidakintuitif, filter pencariankurangspesifik, sertadesain yang kurangresponsif. Penelitianinimerancangulang UI/UX menggunakanmetode Design Thinking untukmeningkatkanpengalamanpenggunamelalui lima tahap: empathize, define, ideate, prototype, dan test. Hasil pengujiandengan System Usability Scale (SUS) menunjukkanskor 84 (Sangat Baik), dan Single Ease Question (SEQ) memperoleh rata-rata 6,32/7, yang menandakankemudahantinggidalampenggunaan. Hasil inimembuktikanbahwa Design Thinking dapatmenghasilkandesain yang lebihintuitif, efisien, dan meningkatkankepuasanpengguna. 
REDESIGN LAYOUT WORKSTATION PROSES INJECTION MOLDING BERDASARKAN WORKLOAD ANALYSIS DAN PROSES SIMULASI PADA PEMBUATAN KOMPONEN LCDTV Mulyana, Fajar; Sugiono, Sugiono; Tama, Ishardita Pambudi
JEMIS (Journal of Engineering & Management in Industrial System) Vol. 3 No. 2 (2015)
Publisher : Industrial Engineering Department, Faculty of Engineering, Universitas Brawijaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21776/ub.jemis.2015.003.02.6

Abstract

Abstract Productivity improvement of the company can be reach with many effort, which are minimizing waste, improving the utility of operator, and also redesigning layout facilities. Based on the observation, idle time of operator for the injection process is 30 minutes. If the delay will be compare with the company losses, it is equal to IDR. 1.001.700/operator/month. Based on this problem, redesign of the facilities layout is a solution to improve utilities and workload of operator. The result of this research, alternative layout has design based on simulation and the analysis of Activity Relationship Chart (ARC). It could be minimized the material handling 49.4 meters and 42.9 seconds. For the financial analysis, it can be minimized the labour cost IDR 14.684.670/month and also the material handling cost at least IDR 54.262/month.