Claim Missing Document
Check
Articles

Found 14 Documents
Search

Review of the Rising and Attaching Movement at Subdistrict of Kemang, Parung and Ciseeng in Bogor District Fauzi, Ahmad; Murtedjo, Tedy; Chayati, Nurul
ASTONJADRO Vol. 11 No. 3 (2022): ASTONJADRO
Publisher : Universitas Ibn Khaldun Bogor

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/astonjadro.v11i3.4230

Abstract

The average level of vehicle ownership, number of students, working population, number of schools and the average family income can cause an increase in movement in the form of generation and attraction. The rise and pull of traffic on land use, especially in the Districts of Kemang, Parung and Ciseeng is one of the problems that often causes traffic jams during busy times in the morning and afternoon. To overcome these problems, the author opens an analysis of the generation and pull of the movement of traffic flow. The land use that will be analyzed to predict trip generation and attraction, namely the Hospital, Housing, Shopping Center, Office, Industry and Education Areas (SD, SMP and SMA/SMK/Private and Non-Private), while the classification of roads used are Arterial and Collectors located in Parung Subdistrict, Kemang Subdistrict and Ciseeng Subdistrict. Analysis of roads using 2017 MKJI and prediction of generation with ITE (Trip Generation Manual) and modeling with Saturn applications. Looking at the Existing Conditions at the study site for road network data, it can be concluded that the level of service at each entrance in the categories C and D, which means the value of C is a stable current and D is an unstable starting flow. The large number of trip generation and attraction at the study sites in three sub-districts namely Ciseeng, Parung and Kemang Subdistricts which included the education area, trading center or market, parks, and hospitals had a generation of 9,140 trip/hour and a Tug of 29,404 trip/hour. The design equation for transportation modeling in Ciseeng sub-district, Parung dang Kemang is Y = 94,565 + 1,015 (X).
Feasibility Study of Park and Ride City of Depok Khodam Fauzi, Muhamad; Murtedjo, Tedy; Rulhendri, Rulhendri
ASTONJADRO Vol. 11 No. 3 (2022): ASTONJADRO
Publisher : Universitas Ibn Khaldun Bogor

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/astonjadro.v11i3.4255

Abstract

Depok City is a city in West Java Province, Indonesia. The city is located just south of Jakarta, which is between Jakarta and Bogor. The total population of Tangerang Regency in 2020 is ± 2,457,745 people according to the Central Statistics Agency (BPS) of Depok City. Depok City which has an area of 200.29 km. This research was conducted to determine the feasibility level of the Park and Ride development plan in Depok City. Traffic counting surveys and interviews were carried out on the main road sections which were then processed using Microsoft Excel to determine the parking accumulation until the fluctuation of motorbikes and cars was known. Furthermore, the interview data is processed to determine the amount of public interest in the development of Park and Ride which is reviewed based on gender, age, trip duration, trip intent, parking duration, monthly fuel expenditures, desired parking rates and those who agree to use Park and Ride when the survey was conducted. at 06.00-21.00 WIB on Jalan Jatijajar Terminal area. From the results of processing this data using Microsoft Excel, the characteristics of Park and Ride facilities users and also the number of users of Park and Ride facilities for motorbikes were found to be 421, while for cars of 116 with a plan age until 2021, this proves that there is a need to increase interest in motorbikes. Park and Ride development at Jatijajar Depok Terminal.
Analysis Study of Oriented Area Development Plan in Sukaresmi Area (Case Study: Sukaresmi Bogor, West Java Province) Hidayah, Khoiron; Murtedjo, Tedy; Rulhendri, Rulhendri; Chayati, Nurul
ASTONJADRO Vol. 12 No. 3 (2023): ASTONJADRO
Publisher : Universitas Ibn Khaldun Bogor

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/astonjadro.v12i3.4322

Abstract

Several cities in Indonesia have implemented a Transit Oriented Zone system in integrating a sustainable transportation system, the area at the Sukaresmi point has become one of the areas developed with the Transit Oriented Development (TOD) concept in the Presidential Regulation of the Republic of Indonesia Number 55 of 2018 concerning the Plan Main Transportation Jakarta, Bogor, Depok Tangerang and Bekasi in 2018-2029. The development of this area will generate new movements in the surrounding road network. Of course, it will have a negative impact on the surrounding traffic. The negative impacts include an increase in the volume of traffic flow which can cause congestion, pollution, accidents, and other things that cannot be avoided on roads in the area where there is no traffic management arrangement around the area, it is necessary to conduct a study on traffic impact analysis. and analysis of generation and pull, the performance of roads in the operation stage in 2024, the development of the sukaresmi area has a total of 37.316 m2. With traffic engineering to minimize congestion due to area development plans. From the analysis result, the basic building coefficient is 70%, the building floor coefficient is 4.98. In the existing conditions, the highway has a saturation level of > 1. The generation and pull that occurs is 1240 cur / hour. Whereas the operation stage, the road saturation level becomes> 1.Recommendations given are the provision of safe public transportation facilities, realizing the importance of road traffic and road transportation and a study of land ownership around the Sukaresmi-oriented development plan is needed.
Studi Rencana Penentuan Halte Sistem Angkutan Umum Massal Berbasis Jalan Pada Koridor 6 Di Kabupaten Bogor (Ciawi-Cisarua) Nirwan, Ade; Rulhendri; Murtedjo, Tedy
Journal of Applied Civil Engineering and Infrastructure Technology Vol 7 No 1 (2026): Agustus 2026 (Articles in Press)
Publisher : Indonesian Society of Applied Science

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.52158/jaceit.v7i1.832

Abstract

The mass public transportation system (SAUM) is one of the Bogor Regency Government's efforts to alleviate existing traffic congestion and provide people with alternative transportation options. Based on the study, six main corridors have been identified for development, one of which is Corridor 6, specifically from Ciawi to Cisarua. The purpose of this study is to determine the number and location of bus stops to meet potential demand and estimate the potential demand from each stop point. The analytical method used is the analytical descriptive research method of the Ministry of Land Transportation's equations. The results of the research that have been carried out have obtained 17 stopping points that can meet potential demand on the Corridor 6 route, with the locations of Ciawi Hospital Stop, Ciawi Gas Station Stop, Gadog Stop, Hermina Hospital Stop, Pasir Angin Stop, GPIB Nehemia Stop, Cibogo Gas Station Stop, SMK YMA Megamendung Stop, RM Ma Pirah Stop, Cimori Riverside Stop, Taman Wisata Matahari Stop, MAN 1 Cisarua Stop, Parama Hotel Stop, Cibulan Clinic Stop, Taman Safari Stop (RSPARU), Taman Safari 1 Stop, and SDN Cibeureum Stop.