Claim Missing Document
Check
Articles

Found 15 Documents
Search

PERENCANAAN STRUKTUR BAWAH JEMBATAN (STUDI KASUS: STRUKTUR PIER 5 PADA PROYEK JALAN TOL SOLO – YOGYAKARTA 0+750) Sari, Undayani; Raditya, Michael Alfa; Mulyanto, Arya Budi; Pardoyo, Bambang; Muhrozi, Muhrozi
Jurnal Teknik Sipil Vol. 17 No. 4 (2024)
Publisher : Program Studi Teknik Sipil Fakultas Teknik Universitas Atma Jaya Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24002/jts.v17i4.8418

Abstract

Perencanaan struktur bawah dalam pembangunan sebuah jembatan merupakan hal yang sangat diperlukan guna menopang beban struktur atasnya. Proyek Pembangunan Jalan Tol Solo – Yogyakarta - NYIA STA 0+750 memiliki 2 jalur, 1 jalur ke arah Jogja dan 1 jalur ke arah Solo. Pada studi ini dilakukan analisis pada struktur pier 5 arah ke Jogja terkait perencanaan pembebaban, desain pier head, desain pier, desain pondasi, daya dukung, dan penurunan. Dalam analisis desain pier head dan desain pier digunakan metode statis tak tentu dengan metode perhitungan numerik dan didapatkan hasil yang aman untuk menopang beban struktur atas rencana. Dalam analisis desain pondasi digunakan desain diameter 0,8 m dan 1,0 m. Perhitungan daya dukung dan penurunan pondasi menggunakan metode group pile yang dianalisis menggunakan metode empiris Reese & Wright dan Reese & O'neill serta pemrograman MIDAS GTS NX. Setelah dianlisis maka didapatkan desain bored pile yang digunakan adalah kelompok tiang berjumlah 25-pile berdiameter 1,0 m dengan panjang 10 m dan dengan pilecap berukuran 12 x 12 x 2 m3. Hasil daya dukung group bored pile yang didapatkan dari metode empiris adalah sebesar 56785,146 kN dan penurunan group bored pile didapatkan hasil 5,768 cm. Hasil daya dukung group bored pile yang didapatkan dari metode MIDAS GTS NX adalah sebesar 45514,535 kN serta penurunan group bored pile didapatkan hasil 6,556 cm.
Pendampingan Analisis Geoteknik Penanganan Lereng Pondok Pesantren Al Fitrah Metesah Tembalang Semarang Sadono, Kresno Wikan; Sari, Undayani Cita; Indrastono, Indrastono; Partono, Windu; Prastiwi, Yulita Arni; Pardoyo, Bambang
Darma Sabha Cendekia Vol 7 No 1 (2025): Darma Sabha Cendekia: Juni 2025
Publisher : Jurusan Ilmu Ekonomi dan Studi Pembangunan | Universitas Jenderal Soedirman

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32424/dsc.v7i1.6326

Abstract

Pada suatu pembangunan konstruksi diperlukan survey awal geoteknik sebagai penyelidikan geoteknik awal. Dengan adanya kegiatan ini maka permasalahan pembangunan dapat diketahui secara rill dilapangan. Pondok Pesantren (PP) Al-Fitrah merencanakan akan mendirikan bangunan baru berupa asrama santri. Bangunan ini direncanakan berada di Kecamatan Tembalang, Semarang. Oleh karena itu diperlukan survey awal dan penyelidikan geoteknik pada lokasi yang akan didirikannya bangunan baru berupa asrama santri Pondok Pesantren (PP) Al-Fitrah tersebut. Rencana bangunan asrama santri berada di atas lereng, sehingga perlu analisa terhadap longsoran. Penyelidikan geoteknik yang diperlukan adalah boring manual dan sondir (CPT) manual. Berdasarkan data pengujian tersebut, kemudian dapat dianalisis dan dievalusi kemudian diberikan rekomendasi dan saran yang sesuai untuk mendukung kelancaran pembangunan asrama santri baru Pondok Pesantren (PP) Al-Fitrah. Berdasarkan hal tersebut maka Tim Pengabdian kepada Masyarakat Departemen Teknik Sipil Universitas Diponegoro melaksanakan pengabdian masyarakat dalam bentuk evaluasi lokasi lahan rencana pembangunan asrama santri Pondok Pesantren (PP) Al-Fitrah. Dengan kegiatan ini diharapkan dapat memberikan saran dan masukan bagi pihak Yayasan Pondok Pesantren (PP) Al-Fitrah terhadap rencana pembangunannya
The Evaluation of Prefabricated Vertical Drain (PVD) Installation Effect on Soft Soil Physical and Mechanical Properties Sari, Undayani Cita; Wardani, Sri Prabandiyani Retno; Pardoyo, Bambang; Admojo, Danang Dwi; Rizqullah, Mochammad Kemal; Hussein, Muhammad Fahri
Aceh International Journal of Science and Technology Vol 14, No 2 (2025): August 2025
Publisher : Graduate School of Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.13170/aijst.14.2.45368

Abstract

The purpose of the Yogyakarta - Bawen Toll Road construction was to improve connectivity between Yogyakarta and Semarang. However, during its construction, soft soil problems were found, so Prefabricated Vertical Drains (PVD) were installed. The installation of PVD aims to increase the rate of pore water discharge from the soil, thereby compacting it and enhancing its bearing capacity. Changes in soil material parameters also accompany this increase in bearing capacity. This study was conducted to analyze the effect of PVD installation on the physical and mechanical properties of the soil. The analysis was conducted by comparing soil investigation data before and after the PVD installation. Soil sample data were collected from the Yogyakarta-Bawen Toll Road, STA 4+500, specifically at BH 17. The physical properties under review are water content, wet unit weight, soil specific gravity, Atterberg limits, and changes in particle composition as determined by grain size analysis. Meanwhile, changes in the mechanical properties of the soil include pre-consolidation pressure, compression index, recompression index, consolidation coefficient, and volume compressibility. Undrained shear strength parameters were measured using an unconfined compression test to identify the soil's bearing capacity. The results show changes in physical and mechanical parameters before and after PVD installation. Overall, the most critical aspect of the accelerated consolidation method for physical parameters is a decrease in water content of 13% to 37% compared to the pre-PVD installation condition. Meanwhile, changes in the consolidation parameters, as well as a decrease in unconfined compressive strength of 2% to 12%, are also observed. This occurs for various reasons, one of which is the relationship between the completion time of the consolidation process and the consolidation process. However, the soil classification remained the same, according to the USCS, as a very stiff soil type
PENDAMPINGAN PEMBUATAN DINDING PENAHAN TANAH DAN GAPURA AKSES MASUK PEMAKAMAN UMUM DUSUN SETRO, JEMBRAK, PABELAN KABUPATEN SEMARANG Cita Sari, Undayani; Priastiwi, Yulita Arni; Wardani, Sri Prabandiyani Retno; Partono, Windu; Pardoyo, Bambang; Carita, Nensi; Ulayya, Inandhiya Ayu; Saputra, Nugraha Eka; Zainuddin, Zainuddin
Jurnal Pasopati Vol 6, No 2 (2024): Vol 6, No 2 (2024)
Publisher : Fakultas Teknik Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.14710/pasopati.2024.23804

Abstract

Kondisi akses masuk pemakaman umum Dusun Setro, Jembrak, Pabelan selama ini hanya berupa jalan tanah dengan tanaman rindang di kanan kiri jalan. Seiring dengan banyaknya warga perantau yang ziarah ke makam tersebut, warga sekitar mulai berupaya menggalang dana dan bergotong royong untuk membuat akses masuk ke pemakaman menjadi lebih baik dengan membuat jalan, saluran air, dinding penahan tanah, serta gapura. Tim Pengabdian kepada Masyarakat Departemen Teknik Sipil membantu memberikan pendampingan pembuatan dinding penahan tanah serta gapura pada daerah akses masuk ke pemakaman Dusun Setro, Jembrak tersebut. Kerjasama dan koordinasi yang baik antara Tim Pengabdian kepada Masyarakat Departemen Teknik Sipil bersama-sama dengan warga Dusun Setro, Desa Jembrak diwujudkan sehingga permasalahan yang ada di dalam masyarakat dapat tertangani dengan baik. Struktur dinding penahan tanah yang dibuat berupa dinding pasangan batu kali di sebelah kanan dan kiri jalan yang akan dibuat. Ketinggian dinding disesuaikan dengan kontur tanah untuk dapat menahan longsoran tanah ke badan jalan, sedangkan gapura dibuat dari material beton bertulang. Dengan selesainya program Pengabdian kepada Masyarakat Batch 2 ini bersamaan dengan selesainya pekerjaan pembuatan akses jalan masuk pemakaman umum Dusun Setro sehingga diharapkan dapat bermanfaat bagi Masyarakat Dusun Setro maupun warga sekitar desa
PERENCANAAN STRUKTUR BAWAH JEMBATAN (STUDI KASUS: STRUKTUR PIER 5 PADA PROYEK JALAN TOL SOLO – YOGYAKARTA 0+750) Sari, Undayani; Raditya, Michael Alfa; Mulyanto, Arya Budi; Pardoyo, Bambang; Muhrozi, Muhrozi
Jurnal Teknik Sipil Vol. 17 No. 4 (2024)
Publisher : Program Studi Teknik Sipil Fakultas Teknik Universitas Atma Jaya Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24002/jts.v17i4.8418

Abstract

Perencanaan struktur bawah dalam pembangunan sebuah jembatan merupakan hal yang sangat diperlukan guna menopang beban struktur atasnya. Proyek Pembangunan Jalan Tol Solo – Yogyakarta - NYIA STA 0+750 memiliki 2 jalur, 1 jalur ke arah Jogja dan 1 jalur ke arah Solo. Pada studi ini dilakukan analisis pada struktur pier 5 arah ke Jogja terkait perencanaan pembebaban, desain pier head, desain pier, desain pondasi, daya dukung, dan penurunan. Dalam analisis desain pier head dan desain pier digunakan metode statis tak tentu dengan metode perhitungan numerik dan didapatkan hasil yang aman untuk menopang beban struktur atas rencana. Dalam analisis desain pondasi digunakan desain diameter 0,8 m dan 1,0 m. Perhitungan daya dukung dan penurunan pondasi menggunakan metode group pile yang dianalisis menggunakan metode empiris Reese & Wright dan Reese & O'neill serta pemrograman MIDAS GTS NX. Setelah dianlisis maka didapatkan desain bored pile yang digunakan adalah kelompok tiang berjumlah 25-pile berdiameter 1,0 m dengan panjang 10 m dan dengan pilecap berukuran 12 x 12 x 2 m3. Hasil daya dukung group bored pile yang didapatkan dari metode empiris adalah sebesar 56785,146 kN dan penurunan group bored pile didapatkan hasil 5,768 cm. Hasil daya dukung group bored pile yang didapatkan dari metode MIDAS GTS NX adalah sebesar 45514,535 kN serta penurunan group bored pile didapatkan hasil 6,556 cm.