Claim Missing Document
Check
Articles

Found 20 Documents
Search

ANALISIS PENGAMBILAN KEPUTUSAN PENENTUAN LOKASI SENTRA OLEH-OLEH KHAS BATAM Nofriani Fajrah; Sri Zetli
JURNAL REKAYASA SISTEM INDUSTRI Vol 6 No 1 (2020): (November 2020)
Publisher : Universitas Putera Batam

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33884/jrsi.v6i1.2667

Abstract

Batam is developing into a tourism city, however, Batam tourism has not been supported by the souvenir center to sell local people's work. There are several tourist center areas in Batam, but they have not specifically sold special souvenirs from Batam. This study aims to determine the right location for a typical souvenir center of Batam based on a decision analysis of the factors of tourist interest. The method used in this study is the Analytical Hierarchy Process (AHP) by using six variables of tourist interests, which were obtained from previous studies, namely the existence of a tourist center, accessibility, accommodation, transportation, culinary services and the availability of souvenir products. The six variables are paired with the five tourist center areas in Batam, which are obtained based on the results of the researcher's field survey. The decision analysis was carried out by three respondents who are relevant to this study, namely the government, small and medium enterprises, and academics who have expertise in the relevant fields. Based on the research results, it was found that the right location for a typical souvenir center of Batam, Nagoya. This is because Nagoya is the iconic center of Batam with the biggest shopping mall, so tourists will definitely visit Nagoya as an experience of traveling to Batam to buy various kinds of souvenir products from food, drinks, clothes, bags, shoes, perfume and various other accessories. Based on this research, it can be concluded that the existence of an important souvenir center is considered by stakeholders in developing tourism in Batam, so that the local culture of Batam is better known by tourists by buying typical Batam souvenirs at souvenir centers and can also improve the economy of the local population by producing Batam souvenirs
Pembinaan Penyusunan Laporan Keuangan pada Usaha Jahit Rumahan Neni Marlina Br Purba; Sri Zetli; Handra Tipa
Jurnal Pengabdian kepada Masyarakat Politeknik Negeri Batam Vol 3 No 2 (2021): Jurnal Pengabdian kepada Masyarakat Politeknik Negeri Batam
Publisher : Pusat P2M Politeknik Negeri Batam

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30871/abdimas polibatam.v3i2.3328

Abstract

Apart from being good at sewing, sewing businesses also need to understand good financial management and governance so that the business runs smoothly. It is not uncommon for business actors to still find it difficult to understand how to make financial reports properly, because they think that financial reports are not too important for their businesses, especially middle-to-lower businesses such as home sewing businesses. Based on these problems, the aim of this dedication is the Development of Financial Statements for Home Sewing Businesses. The method used is the preparation of financial statements starting from the preparation of balance sheets, income statements, reports of changes in capital, cash flow reports and reports on financial statements that are carried out directly. In addition, the service team also provides techniques on how to sit and design work for tailors so that workers feel comfortable and stay healthy while carrying out their work. Based on the coaching that has been given for 5 meetings, it is concluded that the participants are very interested and enthusiastic and can follow and understand the whole series of coaching that has been carried out until its completion. This was proven by the participants who were able to make their own sewing business financial reports. This guidance is very important, especially for business actors in order to know all business activities for future evaluation.
PELATIHAN ACCURATE ONLINE DI SMK TUNAS MUDA BERKARYA KOTA BATAM Argo Putra Prima; Viola Syukrina E Janrosl; Neni Marlina Br Purba; Sri Zetli; Handra Tipa
Jurnal Pengabdian Ibnu Sina Vol. 2 No. 2 (2023): Juli 2023
Publisher : LPPM Universitas Ibnu Sina

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36352/j-pis.v2i2.569

Abstract

ABSTRAK Tujuan dari pelatihan ini agar siswa dapat menguasai Accurate sebagai aplikasi penyajian laporan keuangan. Melalui sosialisasi program studi akuntansi Universitas Putera Batam sekaligus pelatihan Accurate Online kepada siswa SMK Tunas Muda Berkarya di Kota Batam. Kementerian Pendidikan Nasional Tahun 2010 membutuhkan program keuangan brbasisis software yang diterapkan pada Sekolah Menengah Kejuruan (SMK). Salah satu software akuntansi yang digunakan dalam dunia kerja adalah Accurate. Menaggapi hal itu, perlunya pembelajaran tentang Accurate dipelajari pada SMK dalam mempersiapkan lulusan untuk menghadapi dunia kerja. Pengabdian ini dilakukan di SMK Tunas Muda Berkarya pada siswa jurusan akuntansi. Metode yang digunakan dalam pengabian ini adalah metode ceramah, praktik, dan mmberi pelatihan dalam bentuk contoh dan kasus akuntansi. Pelatihan ini diharapkan bisa menghasilkan siswa yang mampu membuat laporan keuangan dengan menggunakan Accurate Online. Hasil pelatihan melalui metode ceramah serta praktek yang difasilitasi oleh pihak sekolah di ruang serbaguna SMK Tunas Muda Berkarya dengan latihan yang diberikan setelah dipaparkannya materi kepada para peserta, maka dapat dilihat bahwa siswa sangat antusias dan semua peserta dapat mengikuti dengan baik. Para siswa menyimpan hasil pekerjaan mereka pada sebuah folder di komputer masing-masing. Dari hasil berupa laporan keuangan yang disimpan dapat dilihat bahwa peserta dapat memahami dengan baik dengan control tim pengabdi. Kata Kunci: Pelatihan, Accurate Online, Siswa SMK ABSTRACT The purpose of this training is for students to master Accurate as an application for presenting financial statements. Through the socialization of the Batam Putera University accounting study program as well as Accurate Online training for students of SMK Tunas Muda Berkarya in Batam City. The Ministry of National Education in 2010 requires a software-based financial program that is implemented in Vocational High Schools (SMK). One of the accounting software used in the world of work is Accurate. In response to this, it is necessary to study Accurate in Vocational Schools in preparing graduates to face the world of work. This service is carried out at the Tunas Muda Berkarya Vocational School for students majoring in accounting. The method used in this dedication is the lecture method, practice, and giving training in the form of accounting examples and cases. This training is expected to produce students who are able to make financial reports using Accurate Online. The results of the training through the lecture method and practice facilitated by the school in the Multipurpose Room of the Tunas Muda Berkarya Vocational School with the exercises given after the material was presented to the participants, it can be seen that the students were very enthusiastic and all participants were able to follow well. Students save their work in a folder on their computer. From the results in the form of stored financial reports, it can be seen that participants can understand well with the service team's control. Keywords: Training, Accurate Online, Students
PERANCANGAN FASILITAS KERJA PADA PROSES WASHING MATERIAL DI PT. XYZ zulkifli, Revaldo; Sri Zetli
Computer Science and Industrial Engineering Vol 6 No 3 (2022): Comasie
Publisher : LPPM Universitas Putera Batam

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The posture of workers who take positions that are more than normal are consistently very at risk for complaints of Muscoloskeletal Disorders (MSDs). PT.XYZ is engaged in the manufacture of Mechanical, Electrical, and Modular Sub Assy components through various processes using machines. In washing activities, the material that has been processed from the machine is handled manually by workers which is carried out repeatedly every day. In this condition, the body posture is always changing from slouching, slouching, leaning, which is quite a long time which happens more than once every day. Due to non-ergonomic workplace conditions that can endanger the condition of workers in facing risks such as MSDs injury, it is necessary to design work facilities in the material washing process to improve work posture. From the results of the study it was found that the measurement of MSDs complaints using the Nordic Body Map (NBM) questionnaire was not good, where there were complaints experienced by workers above 50%, namely pain in the left shoulder (58.33%) in the right shoulder (56.25%) Pain in the left shoulder. left shoulder. waist (60.41%) on the left calf (58.33%) on the right calf (52.08%) on the left leg (58.33%) on the right leg (58.33%). Calculations using the REBA method have activities with a high risk level for washing 1 activity with a score of 8.5 (high), washing 2 activities with a score of 5.6 (medium) and drying activity with a score of 3 (low). So it is necessary to design ergonomic work facilities to reduce MSDs complaints, namely in the form of a washing table.
PERANCANGAN ALAT BANTU KERJA BERDASARKAN ANALISIS POSTUR KARYAWAN DI PT CITRA TUBINDO TBK KOTA BATAM Josef; Sri Zetli
Computer Science and Industrial Engineering Vol 10 No 4 (2024): Comasie
Publisher : LPPM Universitas Putera Batam

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33884/comasiejournal.v10i4.8607

Abstract

The current rapid technological advancement allows companies to increase production speed through the use of machinery. However, this often leads to monotonous and physically demanding work, especially in Manual Material Handling (MMH) activities. Inappropriate MMH activities can result in Musculoskeletal Disorders (MSDs), involving disruptions to muscles and joints. To address this issue, the design of ergonomic work aids is necessary.The NIDA method (Need, Idea, Decision, Action) is employed to design work aids by considering needs, innovative ideas, design decisions, and implementation actions. The REBA method (Rapid Entire Body Assessment) to assess the working position or posture of an operator’s neck, back, arms, wrists, and legs . Research results indicate that the use of specialized aids in activities such as measurement can reduce MSDs complaints, where the score on employee body posture analysis is obtained on averange 3 and the NBM questionnaire date shows an averange score of 30, whwere this score included in the low risk category. And before the work facility design was carried out, the score was for REBA 6 and with NBM questionnaire data 41, the category indicates medium risk. Previous research has also utilized the NIDA method in designing work aids with positive outcomes. In conclusion, the use of the NIDA method in designing ergonomic work aids can alleviate MSDs complaints and enhance productivity at PT Citra Tubindo TBK and similar industries.
ANALISIS PENGARUH SUHU RUANGAN TERHADAP KONSENTRASI BEKERJA KARYAWAN PADA PT TEAM METAL INDONESIA Pratama, Ferdian; Sri Zetli
Computer Science and Industrial Engineering Vol 10 No 5 (2024): Comasie
Publisher : LPPM Universitas Putera Batam

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33884/comasiejournal.v10i5.8623

Abstract

The temperature in the room in the milling section reaches 37'C which is not in accordance with the limit of room temperature regulations. Employees who are too tired to work with hot room conditions make work concentration unfocused and can endanger the workers themselves. The purpose of this study is to determine the state of room temperature at PT Team Metal Indonesia, determine the concentration of working employees at PT Team Metal Indonesia and the relationship between room temperature and concentration of working employees at PT Team Metal Indonesia. This study uses a simple regression method. Based on the results of the study, it is known from the measurement of room temperature that the average value is 39.77 and the percentage value is 79.54%. This value is not good at the room temperature in the company. It is known from the measurement results on work concentration that the average value is 40 and the percentage value is 80%. This value is not good for the concentration of work felt at the company and there is a significant influence between room temperature and work concentration on milling department employees at PT Team Metal Indonesia.
PERANCANGAN FASILITAS KERJA PROSES PEMBUATAN BAKSO PADA USAHA KECIL MENENGAH MORO ASIH Al Ayubi, Moh Galih; Sri Zetli
Computer Science and Industrial Engineering Vol 10 No 5 (2024): Comasie
Publisher : LPPM Universitas Putera Batam

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33884/comasiejournal.v10i5.8685

Abstract

This study was conducted on employees at UKM Moro Asih, where the process of making meatballs is still carried out without a work table, which can lead to Musculoskeletal Disorders (MSDs) in employees. Through the distribution of the Nordic Body Map (NBM) questionnaire, it was found that 2 out of 3 workers had a "Very High" level of musculoskeletal risk, indicating the need for comprehensive and immediate action. To make improvements, the Rapid Entire Body Assessment (REBA) method was used by designing a work table that fits the employees' body posture. The research results show that the REBA score before using the work table and chair was 7 (moderate risk), while with the proposed work table and chair, the score decreased to 3 (low risk). This significant change indicates that the addition of these facilities effectively reduces the risk of musculoskeletal disorders in employees in the meatball production section.
ANALISIS BEBAN KERJA OPERATOR ISOTANK PADA PT ECOGREEN OLEOCHEMICALS BATAM Candra, Roy; Sri Zetli
Computer Science and Industrial Engineering Vol 10 No 5 (2024): Comasie
Publisher : LPPM Universitas Putera Batam

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33884/comasiejournal.v10i5.8711

Abstract

Working with ISO Tank container loading and unloading equipment, personnel are employed in morning, afternoon, and night shifts, and their tasks are completed around the clock. Operators of ISO Tank Containers put in eight hours a day, and by taking shifts, they may work up to twelve hours. A packed timetable adds to the operator's burden. The aim of this study is to ascertain the physical workload level of PT Ecogreen Oleochemicals Batam isotank operators using the %CVL method, the mental workload level of PT Ecogreen Oleochemicals Batam isotank operators using the NASA-TLX method, and the difference in physical and mental workload on PT Ecogreen Oleochemicals Batam isotank operators. This study employs quantitative methods. The first variable, physical workload, is derived from the %CVL formula, which takes into account pre-work and work pulses. The second variable, mental workload, is derived from the NASA-TLX questionnaire, which includes performance, effort, frustration level, mental demand, physical demand, and temporal demand. The findings demonstrated that, according to the %CVL measurement, ISO Tank operators at PT Ecogreen Oleochemicals Batam most frequently experienced a physical workload with the classification of Improvement required, and that, according to the NASA-TLX measurement, their most common mental workload was in the High category.
ANALISIS PENGARUH BEBAN KERJA DAN STRES KERJA TERHADAP KINERJA KARYAWAN PRODUKSI DI PT EXCELITAS TECHNOLOGIES BATAM Jumarni; Sri Zetli
Computer Science and Industrial Engineering Vol 11 No 3 (2024): Comasi Vol 11 No 3
Publisher : LPPM Universitas Putera Batam

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33884/comasiejournal.v10i3.9073

Abstract

ABSTRACT Employee workloads vary depending on their specialized fields. For example, in the production area, workers are required to work swiftly due to the constant operation of production machinery. Certain positions, like the Hercules section operator assisting with the depanelizing process, are not appropriate for people in those professions. Support staff members have to put in extra hours because of the incoming and unloaded items. There are challenges due to data mistakes, the human calculating method, and the manual lifting of 5–10 kg objects. At PT Excelitas Technologies Batam, the goals of this research were to ascertain the effects of workload and work stress on manufacturing employee performance, as well as the results of measuring workload utilizing the NASA-TLX technique and measuring work stress using the Health and Safety Executive (HSE) technique. Using the technique of multiple linear regression, the HSE method, and the NASA-TLX approach, the study methodology is quantitative. The High mental load group's average score was 70.20 according to the data. Mental Needs is the most prominent measure of mental workload, with an average score of 5509.87. The average result of the job stress measurement was 142.3 and 81.31%. Employee performance is negatively but negligibly impacted by workload. Employee performance is negatively and significantly impacted by work stress. At PT Excelitas Technologies Batam, the performance of production staff is negatively impacted by workload and work stress.
PERANCANGAN ALAT BANTU PROSES ASSEMBLY MODULE PADA PT XYZ Tambunan, Yopi; Sri Zetli
Computer Science and Industrial Engineering Vol 11 No 4 (2024): Comasi Vol 11 No 4
Publisher : LPPM Universitas Putera Batam

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33884/comasiejournal.v11i4.9160

Abstract

According to the results of data processing and analysis, the authors reached the following conclusions from the research on the Design of Assembly Module Process Aids at PT XYZ. From the processing and analysis of the DFMA machine design, it was found that the constituent components of the machine amounted to 9 components with a total weight of 12.96 kg, a total machining process time of 492 minutes or 8.2 hours and a total cost of Rp.11,039,656. Based on data processing from testing before the machine and after the machine in the module assembly process, the comparison parameters are obtained where before the assembly process aids in the module assy product takes 8,9 seconds with the assembly process in one working hour which produces an output of 1.668 units, while after using the assembly machine on the module assy with a time of 4,7 seconds can produce an output of 3.829 units and an increase of 47%.