ANALISIS PERENCANAAN KOMPENSATOR DAYA KAPASITIF DI GARDU INDUK (GI) SUMENEP UNTUK PERBAIKAN JATUH TEGANGAN Muhammad Fahmi Hakim; Sigi Syah Wibowo; Agung Laksono Pamuji
JURNAL ELTEK Vol 15 No 2 (2017): ELTEK Vol 15 No 2
Publisher : Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (346.452 KB)

Abstract

Pada tanggal 1 Desember 2016, pukul 19.00 WIB di GI Sumenep, saat beban puncak, tegangan di sisi 150 kV hanya mencapai 138 kV. Dengan mengacu pada Peraturan Menteri ESDM No. 03 Tahun 2007, nilai tegangan sebesar 138 kV sudah hampir mencapai batas minimal standard.Saat itu pihak PLN telah melakukan dua tindakan untuk menaikkan tegangan supaya di atas batas yang ditetapkan, yaitu dengan melakukan operasi penambahan daya reaktif dan taping transformator. Selain kedua solusi itu, ada satu cara lagi untuk mengatasi jatuh tegangan yaitu dengan menggunakan shunt capacitor. PT. PLN telah melakukan kajian untuk memasang shunt capasitor dengan kapasitas 25 MVAR namun saat ini masih belum terpasang. Dari hasil analisis dan perhitungan, kapasitas shunt capacitor yang diperlukan untuk mencapai tegangan nominal 150 kV saat beban puncak di GI Sumenep adalah sebesar 46,36 MVAR. Akan tetapi jika dipasang shunt capacitor dengan kapasitas 25 MVAR sesuai dengan keputusan PT. PLN maka tetap memenuhi syarat karena tegangan di Gardu Induk Sumenep bernilai 146,018 kV yang artinya masih di dalam standard tegangan yang diatur oleh Peraturan Menteri ESDM No: 03 Tahun 2007. Karena di pasaran tidak tersedia kapasitor sebesar 25 MVAR, maka nilai itu diperoleh dengan menghubungkan enam belas unit kapasitor masing masing sebesar 521 kVAR secara seri dan pararel pada setiap fasa sehingga memenuhi nilai total sebesar 25 MVAR. On December, 1st, 2016, at 7:00 p.m. at Sumenep Substation, when peak load occurred, the voltage on the 150 kV side only reached 138 kV. With reference to ESDM Ministerial Regulation No. 03 of 2007, the voltage value of 138 kV has almost reached the minimum standard. At that time the PLN had taken two actions to increase the voltage, by carrying out the operation of adding reactive power and transformer taping. In addition to these two solutions, there is one more way to overcome voltage drop by using shunt capacitor. PT. PLN has conducted a study to install a shunt capacitor with a capacity of 25 MVAR but is currently not installed. From the results of the analysis and calculation, the capacitor shunt capacity needed to achieve a nominal voltage of 150 kV when the peak load in Sumenep GI is 46.36 MVAR. However, if a shunt capacitor is installed with a capacity of 25 MVAR in accordance with the decision of PT. PLN then still qualifies because the voltage at Sumenep Substation is worth 146.018 kV which means it is still within the voltage standard regulated by the ESDM Minister Regulation No: 03 of 2007. Because the capacitor is not available at 25 MVAR at market, the value is obtained by connecting six twelve capacitor units each of 521 kVAR in series and parallel in each phase so that the total value is 25 MVAR.
Analisis Kebutuhan Capacitor Bank Beserta Implementasinya Untuk Memperbaiki Faktor Daya Listrik Di Politeknik Kota Malang Muhammad Fahmi Hakim
JURNAL ELTEK Vol 12 No 1 (2014): ELTEK Vol 12 No 1
Publisher : Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (561.085 KB)

Abstract

Perbaikan faktor daya listrik Politeknik Kota Malang (Poltekom) diharapkan mampu memperbaiki kualitas listrik. Perbaikan ini diharapkan pula mampu memperkecil biaya tagihan listrik di Poltekom. Untuk dapat melaksanakan perbaikan kualitas listrik tersebut, maka perlu dilakukan perhitungan terhadap daya reaktif yang harus dikompensasi untuk mendapatkan faktor daya terbaik, yaitu mendekati 1. Setelah dilakukan perhitungan tersebut, maka dilakukan penentuan capacitor bank yang akan digunakan yang selanjutnya akan dilaksanakan uji coba terhadap capacitor bank tersebut. Dengan melakukan tahap-tahap kegiatan di atas maka diharapkan capacitor bank yang terpasang mampu meningkatkan kualitas listrik di Politekniknik Negeri Malang.
Perencanaan PFC Pada Sistem Tenaga Listrik Di Industri Beton Ketika Disuplai Generator Set Muhammad Fahmi Hakim
JURNAL ELTEK Vol 14 No 2 (2016): ELTEK Vol 14 No 2
Publisher : Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (430.209 KB)

Abstract

Faktor daya pada sistem tenaga listrik di salah satu industri beton di Pasuruan ketika disuplai generator set nilainya sangat rendah, yaitu 0,5. Sehingga tujuan utama dari penelitian ini adalah menemukan penyebab rendahnya faktor daya tersebut, merencanakan rating PFC pada jaringan tenaga listrik yang disuplai oleh generator set untuk mengatasi penurunan faktor daya, dan menganalisis kebutuhan rating main switch, capacitor breaker, kontaktor magnetik, dan penghantar. Kesimpulan yang diperoleh, penyebab rendahnya faktor daya dikarenakan suplai daya yang berasal dari generator set tidak melewati capacitor bank yang ada. Oleh karena itu untuk mencapai cos phi 0,85 diperlukan kompensasi daya reaktif 450 kVar. Regulator yang digunakan mempunyai lima steps dengan 1 step 50 kVar dan 4 steps masing- masing 100 kVar. Pengaman tiap step adalah MCCB 100 A untuk 50 kVar dan 200 A untuk 100 kVar dengan pengaman utama adalah 800 A. Kontaktor untuk 50 kVar adalah 100 A dan untuk 100 kVar adalah 200 A. Penghantarnya NYA 50 mm2 untuk kapasitor 50 kVar dan NYA 95 mm2 untuk kapasitor 100 kVar.
Analisis Pemecahan Beban Penyulang Kalipare 20 kV Sri Wahyuni Dali; Imron Ridzki; Muhammad Fahmi Hakim; Hana Nabilla Hapsari; Latasha Fadiela Nurlakshita
Elposys: Jurnal Sistem Kelistrikan Vol. 9 No. 2 (2022): ELPOSYS Vol. 9 No. 2 (2022)
Publisher : UPT - P2M POLINEMA

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (586.383 KB) | DOI: 10.33795/elposys.v9i2.621

Abstract

The Kalipare feeder is a feeder located at PT PLN (Persero) ULP Sumberpucung where the feeder has a feeder length of 232.9 kms and a load of 161.8 A, with a voltage drop of 17.981 kV, the energy loss that is not channeled in 40.82 minutes is IDR 5,333,734.00. So with that the feeder is carried out there is a splitting of the load into two, namely 86.6 A and 74.4 A, with the end voltage being 19.27 kV, with the energy loss that is not channeled in 40.82 minutes is Rp. 2,454.510.8. This load solving is carried out based on the existing conditions of the Kalipare Feeder in 2019, as well as modeling in the form of simulations using ETAP 12.6 and analyzing the simulation results with the existing load breaking conditions in 2020. Load splitting locations are carried out at 7 points taking into account the value of the investment to be made used to do the job. The locations where the load splitting will be carried out are GI Karangkates, Perempatan Peteng, Tumpakmiri, Kalipare, and Banduarjo with an investment cost of Rp. 21,124,247,696 with the construction of 527 gates. After breaking the load, which resulted in the Kalipare feeder and the Donomulyo feeder, the value of the voltage drop on the Kalipare feeder decreased to 18.25 kV; 8.70%, while the Donomulyo Feeder is 19.241 kV; 3.84%. The solution to the load of the Kalipare feeder will minimize losses due to blackouts and increase customer satisfaction.
Pemasangan Lampu Sorot dan Led Strip Dengan Pengoperasian Otomatis di Gapura Klaster SPI Sukun Kota Malang Muhammad Fahmi Hakim; Imron Ridzki; Sukamdi; Mudjiono; Bakti Indra Kurniawan
Elposys: Jurnal Sistem Kelistrikan Vol. 8 No. 1 (2021): ELPOSYS vol.8 no.1 (2021)
Publisher : Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (651.504 KB) | DOI: 10.33795/elposys.v8i1.626

Abstract

Installation of spotlights and LED strips with automatic operation at the entrance gate of the SPI Cluster RT.10 RW.04 Bandungrejosari Village, Sukun District Malang City is based on the absence of lighting contained in the writing of the Sukun Pondok Indah Cluster (SPI) so that many guests or couriers who are not aware of the housing. With the installation of spotlights and LED strips, it is hoped that the writing on the gate of the Sukun Pondok Indah cluster will be bright and visible so that guests or couriers can immediately know about the housing. Then people can see when installing spotlights and LED strips with automatic operation, they hope that people can install lighting installations automatically in their respective homes correctly and according to standards. Then people do not need to operate the ON / OFF spotlights and LED strip every day. That way, the benefits of installing spotlights and LED strips with automatic operation, people don't need to ON / OFF the lighting every time.
Rancang Bangun Automatic Smart Energy Meter Berbasis RFId Muhammad Fahmi Hakim; Imron Ridzki; Ichwan Bayu Kusuma
Elposys: Jurnal Sistem Kelistrikan Vol. 8 No. 1 (2021): ELPOSYS vol.8 no.1 (2021)
Publisher : Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (411.419 KB) | DOI: 10.33795/elposys.v8i1.628

Abstract

The development of technology today makes it easier for humans in their daily activities. One of them is in the digital world. In the industrial era 4.0. more and more companies are issuing breakthrough new products based on digital technology that aim to be practical in their use. One of the technologies applied is the use of smart cards. For example in the use of smart keys in homes and car doors. Then in the current transaction process, many have implemented this smart card technology. The purpose of this research is to apply the latest technology in the energy transaction process which will be applied to the KWh meter. The smart card used is RFId and is integrated in the database and website so that its use is more practical and flexible. Then the use of this smart card can be applied to the smart energy meter so that later the prepaid energy transaction process can be applied easily with this smart energy meter.
AUDIT PENERANGAN PADA GEDUNG A, B, DAN C DI PERGURUAN TINGGI Muhammad Fahmi Hakim; Brenda Yuunilel Vinza Herman; Helmy Mukti Himawan
Elposys: Jurnal Sistem Kelistrikan Vol. 8 No. 2 (2021): ELPOSYS vol.8 no.2 (2021)
Publisher : UPT - P2M POLINEMA

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (577.554 KB) | DOI: 10.33795/elposys.v8i2.629

Abstract

Dalam perkembangannya kebutuhan energi listrik menjadi suatu keharusan bagi masyarakat dan rasanya tanpa energilistrik masyarakat tidak dapat melakukan aktifitas sehari-hari termasuk dalam dunia pendidikan. Pada tiap gedung pendidikan pun dituntut untuk handal dan berkualitas, juga mencukupi kebutuhan energinya, selain itu hal yang tak kalah pentingnya adalah bagaimana intensitas konsumsi energi listrik tersebut efisien, terkendali, dan tentunya hemat energi. Audit energi yang dilakukan pada PSDKU Kediri Politeknik Negeri Malang ini difokuskan ke tingkat konsumsi energi dan sistem pencahayaan bangunan. Berdasarkan hasil analisis yang dilakukan terdapat beberapa kesimpulan yang diperoleh yaitu, penggunaan energi listrik di Gedung A lebih besar dibandingkan dengan penggunaan energi listrik pada gedung B dan C. Dikarenakan gedung A berfungsi sebagai pusat perkantoran yang jam kerjanya dan penggunaan ruangannya lebih banyak. Sistem pencahayaan bangunan tergolong kurang, karena terdapat beberapa ruangan yang masih belum memenuhi tingkat lux rata rata standart. Penentuan tingkat lux rata rata dilakukan dengan simulasi DIALux dan contoh ruangan yang digunakan adalah ruang direktur. Penghematan energi adalah dengan melakukan pergantian lampu menggunakan lampu berjenis LED sesuai kapasitas yang di butuhkan. Dengan menggunakan lampu led maka kebutuhan penggunaan energinya semakin rendah tetapi tetap memenuhi pada SNI.
Analisis Aliran Daya dan Kualitas Daya Voltage Uprating 70 kV ke 150 kV Menggunakan Performance Index Muhammad Marozi Effendi; Muhammad Fahmi Hakim; Budi Eko Prasetyo
Elposys: Jurnal Sistem Kelistrikan Vol. 8 No. 2 (2021): ELPOSYS vol.8 no.2 (2021)
Publisher : UPT - P2M POLINEMA

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (655.707 KB) | DOI: 10.33795/elposys.v8i2.630

Abstract

Kebutuhan energi listrik semakin meningkat seiring dengan perkembangan beban. Adanya perkembangan bebanmenyebabkan arus pada saluran transmisi semakin besar sehingga profil tegangan menurun dan losses semakin besar khususnya pada saluran transmisi 70 kV. Sehingga diperlukan cara untuk menanggulangi masalah tersebut yaitu dengan mempertinggi level tegangan atau voltage uprating dari 70 kV menjadi 150 kV. Penelitian ini dilakukan pada sistem 67 bus di regional Jawa Timur subsistem Paiton-Grati. Terdapat 20 saluran transmisi 70 kV yang akan di-uprating ke 150 kV. Pemodelan sistem dan simulasi aliran daya saat kondisi sebelum (Initial Condition) dan sesudah uprating (Uprating Condition) menggunakan software ETAP. Selanjutnya menganalisis aliran daya dan kualitas daya berdasarkan profil tegangan dan losses saluran transmisi dari masing-masing kondisi. Serta menggunakan performance index untuk membandingkan performa dari Initial dan Uprating Condition dimana terdiri dari Voltage Performance Index (PIV) dan Active Power Performance Index (PIMW). Rata-rata fluktuasi tegangan saat Initial Condition adalah sebesar -3.17%, dimana terjadi kenaikan profil tegangan saat Uprating Condition menjadi sebesar -2.24% dengan selisih sebesar 0.93%. Losses saluran transmisi saat Initial Condition sebesar 4.253%, dimana terjadi penurunan losses saat Uprating Condition menjadi sebesar 3.917%. Sehingga selisih losses saluran transmisi antara Initial dan Uprating Condition sebesar 0.336%. Performance Index saat Initial Condition sebesar 0.18535 sedangkan saat Uprating Condition sebesar 0.15658, sehingga Uprating Condition memiliki performa yang lebih baik
Penilaian Kualitas Gas SF6 Pada GISTET 500/150 kV Rahman Azis Prasojo; Devi Soviati Mahmudah; Imron Ridzki; Muhammad Fahmi Hakim; Priya Surya Harijanto
Elposys: Jurnal Sistem Kelistrikan Vol. 9 No. 3 (2022): ELPOSYS vol.9 no.3 (2022)
Publisher : Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (613.186 KB) | DOI: 10.33795/elposys.v9i3.643

Abstract

The number of Gas Insulated Switchgear (GIS) in operation is increasing in Indonesia. GIS failure requires expensive costs andextensive blackouts. Asset reliability management such as SF6 is needed to ensure GIS performance. Several studies have tested thequality of SF6 gas to assess the feasibility and operation of the GIS. However, a complete GIS feasibility study based on SF6 gas qualityparameters has not found. In this study, a condition assessment of the GISTET Kembangan 500/150 kV was carried out based on applicableinternational standards. There is an interesting phenomenon in the form of dew point anomaly and moisture content in severalcompartments, indicating that the gas is moist. The results of this study indicate the operational feasibility of the GISTET Kembangan500/150 kV , the effect of high humidity on GIS operations, and maintenance recommendations.
Analisis Komparasi Performa Bohlam LED Berbagai Merk Rahman Azis Prasojo; Hafiz Furqoni; Muhammad Fahmi Hakim; Hari Kurnia Safitri; Heri Sungkowo
Elposys: Jurnal Sistem Kelistrikan Vol. 7 No. 3 (2020): ELPOSYS vol.7 no.3 (2020)
Publisher : Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (893.387 KB) | DOI: 10.33795/elposys.v7i3.661

Abstract

LED bulb are increasingly being adopted not only because of their good efficacy, but also because they are known to havehigh controllability. LED lighting has developed rapidly in recent years to achieve more efficient and reliable LED performance. Severalstudies have conducted experiments to obtain the characteristics and performance of LED lamps. However, study comparing theperformance of LED bulbs with various manufacturer and considering the price factor has not been found. In this study, the performancecomparison of six LED bulb manufacturers that are commonly found in the Indonesian market were conducted. Each brand is sampledfrom three rated powers. The results of this study show a weak correlation between the price and performance. Nonetheless, theperformance of LED bulb from different manufacturers were observed.