Claim Missing Document
Check
Articles

Found 18 Documents
Search

SIMULASI PERANCANGAN PEMBANGKIT LISTRIK TENAGA SURYA MENGGUNAKAN SOFTWARE SYSTEM ADVISOR MODEL (SAM) DI GEDUNG KAMPUS AKADEMI KOMUNITAS OLAT MARAS (AKOM) Muhammad Yusuf Karim Yusuf; Paris Ali Topan; Desi Maulidyawati; Indra Darmawan
Jurnal Altron Jurnal Elektronika, Sains & Sistem energi
Publisher : Program Studi Teknik Elektro

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.51401/altron.v2i02.3247

Abstract

Kabupaten Sumbawa khususnya Gedung AKOM memiliki potensi penyinaran matahari yang cukup besar dan cocok untuk pembangkit listrik tenaga surya. Desain manual sistem tenaga surya, yang melibatkan analisis langsung persyaratan sistem seperti bahan dan peralatan, memakan waktu. Oleh karena itu, penggunaan perangkat lunak seperti System Advisor Model (SAM) memudahkan proses desain. Penelitian ini menggunakan metode penelitian kuantitatif dan memanfaatkan data Global Horizontal Irradiance dan konsumsi energi listrik di Gedung AKOM untuk pengumpulan dan analisis data. Simulasi dan perancangan sistem tenaga surya menggunakan perangkat lunak SAM mempertimbangkan faktor-faktor seperti modul surya, inverter, baterai, dan komponen pendukung lainnya. Pemilihan komponen disesuaikan dengan kapasitas yang dibutuhkan. Studi menentukan bahwa untuk sistem tenaga surya dengan kebutuhan daya 18,3 kWh, direkomendasikan sekitar 10 modul surya, kapasitas inverter 4,7 kW, dan kapasitas baterai 12 kW. Selain itu, penelitian ini melibatkan perhitungan Levelized Cost of Energy (LCOE) menggunakan perangkat lunak SAM. LCOE mempertimbangkan faktor-faktor seperti biaya investasi awal, biaya operasional dan pemeliharaan, umur sistem, tingkat pengembalian yang diharapkan, tingkat diskonto, dan estimasi produksi energi. Perbandingan antara berbagai teknologi energi dibuat, membantu keputusan investasi dan pemilihan sumber energi. Hasil perhitungan menunjukkan nilai nominal LCOE sebesar 8,08¢/kWh atau Rp56,64/kWh dan nilai nyata sebesar 7,53¢/kWh atau Rp52,79/kWh.
ECONOMIC DISPATCH MENGGUNAKAN PENDEKATAN LAGRANGE MULTIPLIER STUDI KASUS PEMBANGKIT LISTRIK TENAGA DISEL (PLTD) PT. SUMBER REJEKI POWER Tantowi Alwi; Indra Darmawan; Titi Andriani; Nova Aryanto
Jurnal Altron Jurnal Elektronika, Sains & Sistem energi
Publisher : Program Studi Teknik Elektro

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.51401/altron.v2i02.3253

Abstract

PT Sumber Rejeki Power merupakan salah satu industri pembangit yang memasok ketersediaan energi listrik di kepulauan sumbawa yang memiliki 3 mesin disel yang masing masing mesinnya dapat menghasilkan daya listrik sebesar 7 sampai 8 MW, sedangkan bahan bakar yang digunakan Pembangkit Listrik Tenaga Disel (PLTD) PT. Sumber Rejeki Power menggunakan bahan bakar termal berjenis marine fuel oil (MFO). Namun biaya produksi energi listrik pada PLTD relatif lebih mahal. Oleh karena itu, optimalisasi dalam pengaturan produksi dan penggunaan bahan bakar pada PLTD sangat diperlukan untuk mengurangi biaya operasional dan meningkatkan efisiensi pembangkitan. Dalam Penelitian ini peneliti menggunakan metode Lagrange Multiplier, Hasil economic dispatch menggunakan metode lagrange multiplier maghasilkan total biaya peroduksi yang lebih mahal sebesar Rp 1.216.566.690 jika di bandingkan dengan hasil biaya peroduksi Real sistem sebesar Rp 1.126.714.500 selama periode waktu 24 jam pada tanggal 14 Mei 2023. Hal ini di sebabkan perhitungan economic dispatch menggukan metode lagrange multiplier menghaslkan biaya yang lebih mahal karena pada lagrange multiplier menggunakan syarat optimum yang mengoptimalkan output pembangkit tiap blok unit pembangit.
ANALISIS PENGARUH PERUBAHAN PEMBEBANAN NON-LINEAR TERHADAP KINERJA GENERATOR ALTERNATING CURRENT (AC) TIGA FASA Nurbaya Harun Baya; Titi Andriani; Indra Darmawan; Masyitah Aulia
Jurnal Altron Jurnal Elektronika, Sains & Sistem energi
Publisher : Program Studi Teknik Elektro

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.51401/altron.v2i02.3266

Abstract

used quantitative methods, namely, analytical, experimental methods where researchers used a software PSIM where the loads used are three-phase capacitors, three-phase RC loads, three-phase RL loads and three-phase RLC loads, so that the lowest efficiency results are obtained at three-phase capacitor loads, namely 40%, and the highest efficiency is 98%. , at three-phase RC load the highest efficiency is 95% and the lowest efficiency is 54%, at three-phase RL load the highest efficiency is 92% and the lowest is 30%, while at three-phase RLC load the highest efficiency is 94% and the lowest is 49 %. This efficiency can show that the performance of the generator can produce energy in accordance with its efficiency from the total energy used so that it does not convert into heat in a system or circuit. Where for the voltage THD on the three-phase capacitor load the highest is 23% and the lowest is 4%, while the highest current THD is 12% and the lowest is 1%, on a three-phase RC load with the highest voltage THD is 18% and the lowest is 1 %, while the highest current THD is 9% and the lowest is 1%, for a three-phase RL load with the highest voltage THD is 12% and the lowest is 1%, while the highest current THD is 7% and the lowest is 1%, and for RLC three-phase with the highest voltage THD of 18% and the lowest of 1%, while the highest current THD is 12% and the lowest is 1%.
ANALISIS ALIRAN DAYA PADA SISTEM KELISTRIKAN DI GEDUNG TEKNIK PEMESINAN SEKOLAH MENENGAH KEJURUAN NEGERI 2 SUMBAWA BESAR M.Febriaji; Indra Darmawan; Nova Aryanto; Masyitah Aulia
Jurnal Altron Jurnal Elektronika, Sains & Sistem energi
Publisher : Program Studi Teknik Elektro

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.51401/altron.v2i02.3278

Abstract

Analisis aliran daya digunakan untuk mengetahui dan memahami kondisi sistem tenaga listrik baik pada saat perencanaan maupun ekspansi. Sekolah Menengah Kejuruan Negeri 2 Sumbawa Besar, khususnya pada jurusan teknik pemesinan kedepannya akan melakukan penambahan beban berupa mesin untuk kegiatan pembelajaran, sehingga perlu adanya analisis aliran daya untuk mengetahui rancangan kedepannya untuk pemasangan kapasitas pengaman dan komponen penghemat daya listrik. Tujuan penelitian ini adalah Untuk mengalnallisal daln menilali kebutuhaln alliraln dalyal dan untuk mengetalhui peneralpaln metode Newton Ralphson dallalm mengalnallisis alliraln dalyal paldal sistem kelistrikaln di gedung teknik pemesinaln Sekolah Menengah Kejuruan Negeri 2 Sumbalwal Besalr. Analisis aliran daya akan menggunakan metode Newton Raphson dan aplikasi komputer Electrical Transient Analyzer Program (ETAP). Hasil penelitian mendapatkan nilai daya aktif (P) dan daya reaktif (Q), yang mengalir pada bus 1 (Swing/slack bus) ke bus 2 (Load bus), nilai ini didapatkan dari perhitungan iterasi sebanyak 2 kali, nilai daya yang didapatkan sebesar 110.6051 MW dan -6.0021 MVAR. Dan daya aktif (P) dan daya reaktif (Q) yang mengalir dari bus 2 (Load bus) ke bus 1 (Swing/slack bus) menghasilkan daya sebesar 2.9825 MW dan 1.9938 MVAR, Total keseluruhan daya yang hasil perhitungan Newton Raphson pada MATLAB adalah 113,5876 MW dan -4,0083 MVAR
Arus kuat STUDI KELAYAKAN INSTALASI LISTRIK PADA GEDUNG STASIUN PENGISIAN BAHAN BAKAR UMUM (SPBU) PERNEK SUMBAWA Agus Hermansyah Agus; Ahmad Jaya; Indra Darmawan; Desi Maulidyawati
Jurnal Altron Jurnal Elektronika, Sains & Sistem energi
Publisher : Program Studi Teknik Elektro

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.51401/altron.v4i2.5220

Abstract

Human development cannot be separated from technology, especially electrical energy which functions as the main support in various daily activities. The use of electricity must be balanced with attention to maintenance and installation updates to avoid risks that could harm users. Several important aspects in electrical installations include the selection of materials, the installation process, and compliance with applicable regulatory standards. This research uses qualitative methods, which focus on in-depth analysis of the study object through observation, interviews, and testing of electrical installations in the laboratory. This is different from the method While the quantitative approach involves statistical analysis, the qualitative approach places more emphasis on collecting, analyzing and interpreting data to understand social problems based on natural reality. Hani from research shows that the electrical installation in the Pernek gas station building meets PUIL 2011 standards. This feasibility is determined by several factors such as panel height, contact box, switch, KWH meter, cable color, and the use of MCB as a safety cable in electrical installations are differentiated based on color: R phase is black, S phase is brown, T phase is gray, N cable is blue, and grounding cable is green-yellow. The research conclusions confirm that all installation elements-including cable color, height of contact boxes, switches, panels, KWH meters, and MCB-comply with PUII provisions. 2011 and applicable regulatory standards
ANALISIS INSTALASI LISTRIK RUMAH TINGGAL BERDASARKAN STANDAR PERSYARATAN UMUM INSTALASI LISTRIK TAHUN 2011 Indra Darmawan; Idhom Surodi; Desi Maulidyawati; Nova Aryanto
Jurnal TAMBORA Vol 10 No 2 (2026): Edisi 27
Publisher : Wakil Rektor 3, Direktorat Riset, Publikasi dan Inovasi, Universitas Teknologi Sumbawa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36761/tambora.v10i2.7926

Abstract

Pentingnya penerapan standar keselamatan instalasi listrik di rumah tinggal sesuai dengan kriteria umum Instalasi Listrik (PUIL) 2011 menjadi penggerak penelitian ini. Kegagalan untuk mematuhi persyaratan dalam instalasi listrik dapat mengakibatkan gangguan sistem, sengatan listrik, kerusakan perangkat elektronik, atau bahkan kebakaran. Meskipun PUIL 2011 sekarang menjadi standar emas untuk perencanaan dan pemasangan instalasi listrik bertegangan rendah di seluruh negeri, PUIL masih kurang dimanfaatkan di lingkungan perumahan. Akibatnya, penilaian sistem kelistrikan rumah diperlukan untuk memastikan sejauh mana mereka mematuhi peraturan yang relevan. Untuk memastikan instalasi listrik rumah tinggal di Desa Moyo Mekar, Kecamatan Moyo Hilir, Kabupaten Sumbawa sesuai dengan PUIL 2011, penelitian ini akan mengkaji instalasi saat ini, mengidentifikasi komponen yang tidak memenuhi persyaratan, dan memberikan rekomendasi teknis untuk perbaikan. Strategi deskriptif dengan pendekatan observasional digunakan untuk penyelidikan. Kami menggunakan lembar daftar periksa yang dikembangkan sesuai dengan PUIL 2011 untuk mencatat informasi yang dikumpulkan melalui pengamatan langsung, pengukuran, dan dokumentasi. Kotak kontak, sakelar, sistem pentanahan, sambungan instalasi, panel sirkuit terpisah, dan konduktor adalah beberapa komponen yang dievaluasi. Sebagian besar persyaratan PUIL 2011 dipenuhi oleh instalasi kelistrikan Ibu Ani, menurut temuan tersebut. Ada kabel 1,5 mm2 yang digunakan untuk rangkaian penerangan dan kabel 2,5 mm2 untuk kotak kontak dengan MCB 6 A dalam susunan ini. Sayangnya, ditemukan bahwa dua lokasi penghubung tidak sesuai dengan kriteria pemasangan dan perlu diperbaiki. Sejumlah saran teknis dibuat untuk meningkatkan keamanan dan keandalan sistem kelistrikan, dan penilaian tersebut menyimpulkan bahwa pemasangan kelistrikan di rumah dapat dilakukan.
Optimasi Biaya Bahan Bakar pada Permasalahan Unit Commitment Sistem Microgrid Kabupaten Sumbawa Indra Darmawan; Tri Susilawati
Impression : Jurnal Teknologi dan Informasi Vol. 3 No. 1 (2024): Maret 2024
Publisher : Lembaga Riset Ilmiah

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59086/jti.v3i1.860

Abstract

Salah satu komponen terbesar dalam sistem tenaga listrik yaitu biaya bahan bakar. Salah satu solusi untuk meminimalkan permasalahan tersebut adalah sistem microgrid. Konsep microgrid ini mengombinasikan antara pembangkit termal dengan pembangkit energi baru terbarukan (EBT). Integrasi antara kedua jenis pembangkit harus baik untuk mencapai sistem keandalan yang baik pula. Salah satu cara untuk mengoptimalkan penggunaan kedua sistem pembangkit ini yaitu penerapan unit commitment (UC). UC merupakan cara operasi ekonomis, untuk melakukan penjadwalan operasi setiap unit pembangkit pada periode waktu tertentu. Fokus penelitian ini adalah penyelesaian permasalahan unit commitment untuk sistem kelistrikan microgrid di Kabupaten Sumbawa. Pada proses penyelesaianya dikembangkan 2 model yaitu: model pertama seluruh sistem dilayani pembangkit diesel dan model kedua integrasi pembangkit diesel, pembangkit angin, panel surya dan baterai dengan penetrasi 5%, 10% dan 15%. Metode enumerasi digunakan sebagai metode penyelesaian. Tujuan dilakukannya penelitian ini selain untuk meminimalkan biaya bahan bakar juga ingin diketahui seberapa baik metode enumerasi dalam menyelesaikan masalah. Berdasarkan hasil perhitungan diperoleh efisiensi biaya pada sistem microgrid pada setiap penetrasi sebesar 6%,12% dan 18% jika dibandingkan sistem pembangkit yang menggunakan pembangkit diesel saja.   One of the largest components in the electric power system is the cost of fuel. One solution to minimize this problem is the microgrid system. This microgrid concept combines thermal power plants with renewable energy (EBT) power plants. Integration between the two types of power plants must be good to achieve a good reliability system. One way to optimize the use of these two power plant systems is the application of unit commitment (UC). UC is an economical operating method, to schedule the operation of each power plant unit in a certain period of time. The focus of this study is solving the unit commitment problem for the microgrid electricity system in Sumbawa Regency. In the solution process, 2 models were developed, namely: the first model, the entire system is served by diesel power plants and the second model, the integration of diesel power plants, wind power plants, solar panels and batteries with penetration of 5%, 10% and 15%. The enumeration method is used as a solution method. The purpose of this study, in addition to minimizing fuel costs, is also to find out how good the enumeration method is in solving the problem. Based on the calculation results, the cost efficiency of the microgrid system at each penetration is 6%, 12% and 18% when compared to the generating system that only uses diesel generators.  
STUDI KELAYAKAN INSTALASI LISTRIK PADA GEDUNG GELANGGANG OLAHRAGA MAMPIS RUNGAN KABUPATEN SUMBAWA SESUAI PERSYARATAN UMUM INSTALASI LISTRIK 2011 Andhika Diva Dwi Sandi; Muhammad Hidayatullah; Indra Darmawan; Ahmad Jaya
Jurnal Altron Jurnal Elektronika, Sains & Sistem energi
Publisher : Program Studi Teknik Elektro

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Proses Electrical installations are systems that provide electrical power to meet human needs in everyday life. This involves distributing electric power from the distribution substations of electricity service providers to load points. In the distribution of electrical energy, general requirements for electrical installations are enforced to ensure safety because they ensure human safety and protect property from electrical hazards. Failure to comply with electrical installation regulations and standards can cause the risk of accidents, fires and other serious dangers for building occupants. These problems need to be addressed. carry out feasibility tests on electrical installations that comply with the general requirements for electrical installations in 2011 to ensure safety, reliability and quality of electrical installations. This research aims to determine the feasibility of electrical installations for the Mampis Rungan sports arena building in Sumbawa Regency. This research uses a qualitative method of observation which includes testing, Observations and interviews This research does not involve statistical analysis but focuses more on data collection, analysis and interpretation. Based on the results of inspection and testing data which have been in accordance with PUIL 2011, the Mamp?s Rungan Sports Arena Electrical Installation can be declared unfit. The unfitness factor is caused by The electrical installation system from the panel to the load point does not meet PUIL 2011 standards which include the color of the cables on the panel, and the cables that go to the load point as well as installation safety measures such as the absence of lasdops