Claim Missing Document
Check
Articles

Found 4 Documents
Search

Konsep Rumah Sehat Untuk Meminimalisir Penyebaran Covid-19 Tigo Mindiastiwi; Purwantini Purwantini; Amrita Winaya Shita Dewi
Jurnal Suara Pengabdian 45 Vol. 1 No. 2 (2022): Juni: Jurnal Suara Pengabdian 45
Publisher : LPPM Universitas 17 Agustus 1945 Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1375.56 KB) | DOI: 10.56444/pengabdian45.v1i2.83

Abstract

Pandemi Covid-19 yang memasuki tahun ke-2 sejak maret 2020 masih menjadi perhatian dan kekhawatiran di tengah masyarakat Indonesia. Berbagai upaya telah dilakukan oleh Pemerintah diantaranya yaitu kampanye memakai masker, cuci tangan dengan sabun, menjaga jarak, melakukan penyemprotan disenfektan serta kebijakan PPKM (Perlakuan Pembatasan Kegiatan Masyarakat) yang telah dijalankan mulai Juli sampai dengan Agustus 2021 agar penyebaran Covid-19 bisa dikendalikan. Banyaknya masyarakat yang terinfeksi Covid-19 sampai saat ini mendorong tim pengabdian FT UNTAG Semarang untuk ikut serta dalam solidaritas sosial dengan melakukan pengabdian. Pengabdian masyarakat mengambil tema sosialisasi konsep rumah sehat untuk meminimalisir penyebaran Covid-19. Tema ini diambil untuk mengurangi tempat yang menimbulkan klaster Covid-19 yang paling tinggi yaitu klaster keluarga. Dengan tempat tinggal yang sehat dan bersih maka dapat menekan laju peningkatan penyebaran Covid-19 di lingkungan keluarga. Melalui kegiatan sosialisasi ini diharapkan dapat memberikan pengetahuan dan arahan kepada masyarakat tentang pentingnya konsep rumah dan lingkungan yang sehat agar terhidar dari berbagai macam penyakit terutama Covid-19.
Analisis Keselamatan dan Kesehatan Kerja dengan Metode Job Safety Analysis pada Proyek Bendungan Kuwil Kawangkoan Mukhamad Afif Salim; Agus Bambang Siswanto; Tigo Mindiastiwi; Purwantini Purwantini
Jurnal Serambi Engineering Vol 8, No 1 (2023): Januari 2023
Publisher : Fakultas Teknik

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32672/jse.v8i1.5330

Abstract

The Kuwil Kawangkoan Dam Development Project is one of the National Strategic Projects (PSN). The Kuwil Kawangkoan Dam is a dam located in North Sulawesi province, in the district/city of North Minahasa. This dam is planned to have a capacity of 23.37M³ and is expected to reduce flood discharge by 282 M³/second, provide raw water supply of 4.50 M³/second, and generate electricity of 1.20 MW. With the large-scale development of the Kuwil Kawangkoan Dam Development Project and the high level of risk of work accidents in this development, it is necessary to have an analysis of occupational health and safety (K3). The type of research used is descriptive observational research to identify hazards and analyze the risk of work accidents Hazard identification uses Job Safety Analysis (JSA) technique, which is a method of safety analysis by identifying hazards in a job and controlling work accidents that occur while working. The results of this research are the selection of 6 jobs which previously detailed the stages of the work first and then analyzed the identification of the level of risk so that the results obtained in the Kuwil kawangkoan Dam Development Project there are 3 levels of risk categories, namely extreme risk, high risk and moderate risk. For extreme risk levels, there are 5 jobs with a total of 18 potential hazards. High and moderate risk levels are found in 6 jobs with a total of 84 potential hazards for high risk levels and 29 potential hazards for medium risk levels. As for risk control, it is categorized into 3 aspects, namely the worker aspect, the work environment aspect and the equipment and material aspects of the project
The Analysis of Relationship Between Achievement Motivation, Self-Efficacy and Students Social Laziness Purwantini Purwantini; Ika Rahayu Satyaninrum; Euis Kusumarini; Mardiati Mardiati; Antonius Rino Vanchapo
Journal on Education Vol 6 No 1 (2023): Journal On Education: Volume 6 Nomor 1 Tahun 2023
Publisher : Departement of Mathematics Education

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/joe.v6i1.3202

Abstract

For students, social laziness is a major issue. Social lazines is linked to a number of elements, including self-efficacy and success drive. Individuals with a high level of self-efficacy can easily complete the tasks in their work group, thus they do not free ride in their work group. The purpose of this study is to investigate experimentally the link between self-eficacy and success motivation and social lazines in students. This study employs quantitative corelational approaches. This study's population consisted of students of one school in Indonesia. The sampel size for this study was 300 students drawn from eight courses using the custer random selection approach. According to the findings of this study, self-eficacy has a strong partial link with social lazines, with a significance value of 0.000 < 0.05 and a corelation value of -0.613. Achievemen motivation has a strong partially relationship with social sloth, with a significanc value of 0.000 < 0.05 and a corelation value of -0.623. Self-eficacy and succes drive are strongly asociated with social lazines. Furthermore, the three variables have a significant relationship, with a correlation value of 0.640. As a result, there is a link between students’ self-eficacy, succs motivation, and social lazines.
Analisis Keselamatan dan Kesehatan Kerja dengan Metode Job Safety Analysis pada Proyek Bendungan Kuwil Kawangkoan Mukhamad Afif Salim; Agus Bambang Siswanto; Tigo Mindiastiwi; Purwantini Purwantini
Jurnal Serambi Engineering Vol 8, No 1 (2023): Januari 2023
Publisher : Fakultas Teknik

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32672/jse.v8i1.5330

Abstract

The Kuwil Kawangkoan Dam Development Project is one of the National Strategic Projects (PSN). The Kuwil Kawangkoan Dam is a dam located in North Sulawesi province, in the district/city of North Minahasa. This dam is planned to have a capacity of 23.37M³ and is expected to reduce flood discharge by 282 M³/second, provide raw water supply of 4.50 M³/second, and generate electricity of 1.20 MW. With the large-scale development of the Kuwil Kawangkoan Dam Development Project and the high level of risk of work accidents in this development, it is necessary to have an analysis of occupational health and safety (K3). The type of research used is descriptive observational research to identify hazards and analyze the risk of work accidents Hazard identification uses Job Safety Analysis (JSA) technique, which is a method of safety analysis by identifying hazards in a job and controlling work accidents that occur while working. The results of this research are the selection of 6 jobs which previously detailed the stages of the work first and then analyzed the identification of the level of risk so that the results obtained in the Kuwil kawangkoan Dam Development Project there are 3 levels of risk categories, namely extreme risk, high risk and moderate risk. For extreme risk levels, there are 5 jobs with a total of 18 potential hazards. High and moderate risk levels are found in 6 jobs with a total of 84 potential hazards for high risk levels and 29 potential hazards for medium risk levels. As for risk control, it is categorized into 3 aspects, namely the worker aspect, the work environment aspect and the equipment and material aspects of the project