Mardiah Mardiah
Jurusan Teknik Pertambangan, Fakultas Sains Dan Teknik, Universitas Bangka Belitung

Published : 19 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 14 Documents
Search
Journal : MINERAL

EVALUASI HASIL PENCUCIAN RAW MATERIAL KAOLIN TERHADAP KEBUTUHAN PRODUKSI UNIT PENGOLAHAN PT ANEKA KAOLINE UTAMA BELITUNG Mukram Belto Pratama; Irvani Irvani; Mardiah Mardiah
MINERAL Vol 6 No 1 (2021): MINERAL
Publisher : Jurusan Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (527.46 KB) | DOI: 10.33019/mineral.v6i1.3083

Abstract

PT Aneka Kaoline Utama produces kaoline powder through two processes which are washing are washing unit and processing unit. Washing unit does the separation between tailing and kaoline with the extract as the result. The extract contains water and kaoline, then the water reduction will be processed in processing unit. Based on the information, writer evaluates the extract production in washing unit for fulfilling the needs of processing unit in PT Aneka Kaoline Utama using evaluation method and action research method. The steps are sampling raw material (feed), calculating the sediment pond’s dimention and the volume of full pond, sampling tailing in washing unit’s tools, observing the production’s process, and evaluating the needs off kaoline extract. The result of this research shows that raw material in washing unit were 3,847.4 ton in April, 3,606.2 ton in May, 2,594.9 ton June, and 3,890 in July which showed the amound of extract did not reach the target in processing unit. 69.2% of loose material and 21% loosing kaolin in average caused the recovery value in washing unit just reached 30.8%. Because of loose kaoline’s presence in washing unit, writer suggests the increasing of raw material and working hour as big as 27,056.3 ton per hour with 30.8% washing unit’s recovery so the company can produce 8.34 ton kaoline per hour and 4,000 ton kaoline per month.
Analisis Ekonomis Sewa atau Beli Alat Excavator pada Kegiatan Produksi Bijih Timah PT Prima Timah Utama, Desa Cit, Kabupaten Bangka Randa Wirana; Irvani Irvani; Mardiah Mardiah
MINERAL Vol 6 No 2 (2021): MINERAL
Publisher : Jurusan Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (173.247 KB) | DOI: 10.33019/mineral.v6i2.3088

Abstract

Fulfilling the annual production target of PT Prima Timah Utama based on the 2019 Work Plan and Budget of 1,100,000 m3 requires the procurement of adequate mining equipment both in terms of quantity and production capacity, especially excavators. The equipment procurement plan is estimated by calculating the need for tools using a sample of 30 distribution time data, 9-time constraints data, and some supporting calculation data that results in tool requirements. The cost of ownership of the equipment to be compared with the rental cost is obtained from the purchase price, interest, residual value and economic life of the equipment, the cost comparison is then analyzed using the Net Present Value method. The calculation results show that PT Prima Timah Utama must add 2 units of CAT 320D2 excavator for overburden stripping and wash with an estimated equipment cost of Rp. 2,224,076,433.6 for 2 units of new equipment and Rp. 2,541,131,520 for 2 units of rental equipment where the difference between the rental and purchase equipment is Rp. 317,055,086.4 for one year of work. The result of the analysis with the evaluation of NPV investment has a value of Rp. 32,313,773,567.7 or >0 which states that the investment is declared feasible.
Perhitungan Volume Stockpile dan Pengoptimalan Waktu Pengolahan Stockpile 3, 5 dan 6 Terhadap Produksi Alat Gali muat dan Alat Angkut pada TB Primer Batubesi PT Timah Tbk Neni Sherina; Franto Franto; Mardiah Mardiah
MINERAL Vol 8 No 2 (2023): MINERAL
Publisher : Jurusan Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33019/mineral.v8i2.5070

Abstract

PT Timah Tbk's Batubesi Primary Large Mine has experienced a significant decline in production in recent years, causing a change in the mining process to stockpile management that is still economical with a grade of 0.2%. This study aims to determine the volume and production of stockpiles 3, 5 and 6, the type of sediment and Sn content of stockpile material and the time required to spend stockpile material 3, 5 and 6 in order to get the optimal time. The method used is a quantitative method by taking cycle time data as much as 30 data and analyzing sample levels using XRF on each stockpile. The results of this study obtained the volume of stockpile 3 material is 132,648.42 m3,, stockpile 5 is 162,570.25 m3, and stockpile 6 is 33,090.19 m3. The calculated machine productivity at stockpile 3 is 42.17 tons/hour, stockpile 5 is 48.11 tons/hour and stockpile 6 is 39.53 tons/hour. The highest Sn content is found in stockpile 6 which is 0.33% with the type of skarn sediment. While the lowest Sn content is found in stockpile 3 which is 0.2% with oxide clay sediment type. In stockpile 5, the Sn content is 0.31% with the type of oxide clay sediment. The remaining volume of stockpile material in stockpiles 3, 5 and 6 can be spent with a time of 2.78 years using 1 unit of excavation equipment and 1 unit of transportation equipment. Optimization is carried out so that the remaining stockpile reserves can be spent within 1.74 years using 1 unit of excavation equipment and 2 units of transport equipment.
Perencanaan Tahapan Persiapan Dan Perhitungan Reklamasi Di Lahan Bekas Tambang Air Rikai PT Timah Tbk Kabupaten Bangka Salsabila Oldia Zahrah; Franto Franto; Mardiah Mardiah
MINERAL Vol 9 No 1 (2024): MINERAL
Publisher : Jurusan Teknik Pertambangan Universitas Bangka Belitung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33019/mineral.v9i1.5140

Abstract

The research location chosen was the Air Rikai ex-mining land, which is an alluvial ex-mining land within the IUP of PT Timah Tbk. The negative impact that arises from mining is in the form of land damage. This research aims to overcome damage and also ensure that reclamation activities can be carried out well. The method used in this research is a quantitative method. The data taken is in the form of soil samples, soil pH and water pH data, topographic data (x,y,z coordinates) and bathymetric data for the depth of the pit. The results of data processing and analysis show that the condition of the land to be reclaimed has an area of 13 Ha and is divided into 2, namely voids with a total area of 1.57 Ha and land area of 11.43 Ha. Land use is carried out by stockpiling overburden with a required volume of overburden of 35,511.54 m³. Land leveling with a volume of pushed soil of 35,280 m³. Arrangement of the edge of the pit with a volume of soil moved of 230.29 m³. Construction of drainage channels with an excavation volume of 214.59 m³. Installation of concrete buis type culverts with dimensions of 50 x 50 cm and a length of 50 cm. In the revegetation, 1,517 oil palm trees were planted, then 463 sea cypress trees were planted along the underside and LCC seeds to help loosen the soil. Treating acid mine drainage with 350 water hyacinths. The costs required for reclamation are divided into 2, namely, Direct Costs and Indirect Costs. The direct costs required are IDR 679,286,160 and the indirect costs required are IDR 213,975,140. The total costs required for reclamation of land with an area of 13 Ha are IDR 893,261,300.