Mengoptimalkan Pemeliharaan Infrastruktur melalui Analisis Genangan Banjir di Graha Artha Residence Menggunakan Storm Water Management Model (SWMM) Nanda, Mahdika Putra; Rochman, Fatkhur; Abdulgani, Hamdani
Jurnal Teknik Sipil dan Lingkungan Vol. 9 No. 1: April 2024
Publisher : Departemen Teknik Sipil dan Lingkungan IPB

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29244/jsil.9.1.71-82

Abstract

Kecamatan Sindang yang terletak di Kabupaten Indramayu, secara berulang mengalami genangan saat hujan terjadi, terutama di sepanjang saluran drainase di Perumahan Graha Artha Residence. Faktor utama pemicunya adalah perubahan lingkungan yang awalnya pada tahun 2015 merupakan lahan rawa yang berfungsi sebagai resapan air, mengakibatkan sistem drainase yang ada saat ini tidak dapat mengatasi secara efisien aliran air hujan yang tinggi dan sering mengakibatkan genangan, berdasarkan hal itu tujuan dari penelitian ini yaitu untuk menganalisi saluran yang terdampak untuk periode 5 tahun dan 10 tahun kedepan mengunakan software SWMM. Berdasarkan hasil analisis data periode 5 tahun pada saluran di perumahan Graha Artha, terlihat bahwa genangan air mengalami variasi yang signifikan di berbagai lokasi, dengan durasi dan volume genangan yang berbeda-beda. Langkah-langkah pencegahan dan perbaikan dapat diambil, seperti perbaikan pada sistem drainase dan penerapan sistem retensi air. Selain itu, data periode ulang 5 dan 10 tahun menunjukkan temuan menonjol, seperti tinggi genangan yang signifikan di Blok E3, Blok E6, dan JL. Cendrawasih, serta potensi risiko banjir lebih besar di lokasi tersebut selama periode ulang 10 tahun. Meskipun Blok B1 memiliki total runoff yang lebih rendah, lama genangan yang cukup lama menunjukkan potensi masalah drainase. Oleh karena itu, penanganan yang terfokus dan adaptasi solusi yang sesuai dengan kondisi setiap lokasi sangat penting untuk mengurangi dampak banjir di wilayah Graha Artha Residence.
Analisis Kesiapan Manajemen K3L Pembangkit Listrik Tenaga Uap (PLTU) Indramayu Dalam Menghadapi Keadaan Darurat Rosalinda, Rosalinda; Nanda, Mahdika Putra; Abdulgani, Hamdani
Jurnal Rekayasa Infrastruktur Vol. 10 No. 1 (2024): Jurnal Rekayasa Infrastruktur
Publisher : Program Studi Teknik Sipil Universitas Wiralodra

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31943/jri.v10i1.244

Abstract

Penelitian ini dilatarbelakangi oleh pentingnya kesiapan manajemen K3L dalam menghadapi keadaan darurat untuk melindungi keselamatan, kesehatan kerja, dan lingkungan. Tujuan utama penelitian adalah untuk menganalisis kesiapan manajemen K3L Pembangkit Listrik Tenaga Uap (PLTU) Indramayu dalam menghadapi keadaan darurat, dengan fokus pada pemahaman definisi keadaan darurat, tanggap darurat, elemen pokok sistem tanggap darurat, dan rencana pemulihan keadaan darurat. Metode penelitian yang digunakan adalah deskriptif kuantitatif, yang memberikan gambaran persentase capaian setiap variabel yang diteliti menggunakan angket dengan pengukuran menggunakan skala Guttman. Hasil penelitian menunjukkan bahwa secara keseluruhan persentase rata-rata kesiapan manajemen K3L dalam menghadapi keadaan darurat adalah 88,9%, yang dikategorikan Baik. Kesimpulan dari penelitian ini adalah bahwa manajemen K3L PLTU Indramayu memiliki kesiapan yang sangat baik dalam menghadapi keadaan darurat, namun pelaksanaan dan perencanaan yang telah dibuat perlu ditingkatkan dalam pengawasannya dengan pengembangan program pelatihan lanjutan, evaluasi berkala dan pembaruan rencana dalam meningkatkan keselamatan, kesehatan kerja, dan lingkungan secara menyeluruh. Kata kunci: Manajemen K3L, keadaan darurat, tanggap darurat, PLTU Indramayu
Optimasi Komposisi Silica Fume Dalam Meningkatkan Mutu Beton Agregat Daur Ulang Rahma, Midia; Nanda, Mahdika Putra; Afrianto, Arif; Kurniawati, Mega
Jurnal Rekayasa Infrastruktur Vol. 10 No. 1 (2024): Jurnal Rekayasa Infrastruktur
Publisher : Program Studi Teknik Sipil Universitas Wiralodra

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31943/jri.v10i1.246

Abstract

Penggunaan agregat daur ulang dan silica fume dalam produksi beton telah menjadi perhatian signifikan dalam beberapa tahun terakhir karena potensi mereka untuk mengurangi limbah dan meningkatkan keberlanjutan bahan konstruksi. Studi ini bertujuan untuk menyelidiki pengaruh agregat daur ulang dan silica fume terhadap kekuatan tekan beton pada usia yang berbeda. Studi ini menggunakan kombinasi agregat daur ulang dan silica fume dalam produksi beton. Kekuatan tekan beton diuji pada usia 7, 14, 21, dan 28 hari. Hasilnya dibandingkan untuk menentukan pengaruh aditif terhadap kekuatan tekan beton. Hasilnya menunjukkan bahwa kekuatan tekan beton dengan agregat daur ulang meningkat dengan usia, dengan nilai 11,32 MPa, 17,55 MPa, 19,25 MPa, dan 21,70 MPa pada usia 7, 14, 21, dan 28 hari, respectively. Penambahan silica fume juga meningkatkan kekuatan tekan beton, dengan kekuatan tertinggi dicapai pada kandungan silica fume 12%. Nilai kekuatan tekan pada usia 7, 14, 21, dan 28 hari adalah 15,66 MPa, 20,19 MPa, 22,65 MPa, dan 23,97 MPa, berdasarkan hal itu penggunaan agregat daur ulang dan silica fume dapat meningkatkan kekuatan tekan beton, membuatnya sesuai untuk digunakan dalam proyek konstruksi
Optimization of Technical Calculation of Precast Wall Application for Kawo Secondary Canal Improvement in Sempor Irrigation Area, Kebumen, Central Java Septiani, S; Nanda, Mahdika Putra; Piera, Nuno
JACEE (Journal of Advanced Civil and Environmental Engineering) Vol 7, No 1 (2024): April
Publisher : Universitas Islam Sultan Agung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30659/jacee.7.1.80-90

Abstract

This study aims to perform technical calculations using precast lining in the repair of secondary channels. The planning data used included a concrete grade of fc 18.68 MPa and a reinforcement grade of fy 500 MPa. The service condition analysis was carried out by taking into account the loading during the most critical condition, where the channel is empty and active soil pressure and external water pressure are the main loads. The fixed load calculation was the main focus, where the active earth pressure (PD) was calculated by considering the soil-specific gravity, soil shear angle, and soil coefficient. The calculation results show that the PD reaches 12.24 kN, which gives an idea of the load that the structure has to bear. Furthermore, the internal force analysis provides a deeper understanding of the moments occurring at specific points in the structure. For example, the maximum negative moment at point A was calculated by considering the moments due to fixed load and transient load, which reached 12.73 kNm. This research contributes to improving efficiency and safety in the application of precast lining for secondary channel improvement.
Optimasi Biaya Rehabilitasi Saluran Irigasi Dengan Pendekatan Value Engineering (VE) Menggunakan Metode Paired Comparison Mario Ferdiansyah; Nanda, Mahdika Putra; Suhana, Nono; Sunaryo, Sunaryo
Jurnal Rekayasa Infrastruktur Vol. 11 No. 2 (2025): Jurnal Rekayasa Infrastruktur
Publisher : Program Studi Teknik Sipil Universitas Wiralodra

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31943/jri.v11i2.301

Abstract

The rehabilitation of irrigation channels is essential to improving the efficiency of agricultural water distribution. This study analyzes alternative irrigation channel designs in the D.I Macan Subang project using a Value Engineering (VE) approach with the Paired Comparison method. The existing design uses U-Ditch, which was compared to three alternatives: stone masonry, conventional ferosemen concrete, and geomembrane. The analysis shows that geomembrane provides the highest cost efficiency, with a total cost of IDR 562,075,772.46, resulting in savings of IDR 203,807,083.26 (26.61%) compared to the existing U-Ditch design. The Paired Comparison method effectively evaluates alternatives based on cost and technical criteria. This research contributes to cost-efficient irrigation design decision-making.
Faktor-Faktor Yang Menpengaruhi Hasil Belajar Mata Kuliah Alat Berat Dan Pemindahan Tanah Mekanis Program Studi Pendidikan Teknik Bangunan FT UNP Kurniawati, Mega; Nanda, Mahdika Putra; Arizal, An
Jurnal Ilmiah Kanderang Tingang Vol 14 No 2 (2023): Jurnal Ilmiah Kanderang Tingang
Publisher : FKIP Universitas Palangka Raya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37304/jikt.v14i2.272

Abstract

Learning is a process of interaction between the delivery of the message to the recipient via the media messenger. Lessons take place effectively and efficiently will result in maximum learning results. Factors that affect learning outcomes are individual factors include the physical and spiritual conditions of students, and students of environmental conditions around, social and non-social, as well as the factor of learning approach. Factor approach to learning was an attempt by both teachers and students that includes strategies and methods in the learning process. Based on the observation of the learning process at SMK 5 of Padang found more teachers dominate the classroom, so that active students in the classroom is not visible. Low student learning outcomes SMK 5 of Padang caused by various factors. One of these students are less actively involved in the learning process. Statics studies more are understanding the concepts and formulas, requires an understanding of older students with exercises that much. By using the expository method, the dominance of teachers more reduced. Guided Note Taking is studies active students who can assist in the learning process so that students can be independent in understanding and being able to build his own knowledge. This study aims to determine differences in the results of class X student TGB1-A SMK 5 of Padang after the application of the expository method using Guided Note Taking a class X TKB-A which uses conventional learning. This research uses research Quasi-Experimental (quasi-experiment). This type of research design Pretest-Posttest Control Group Design. Pre-test conducted before implementing learning to know the students' prior knowledge. After application of the expository method using a guided note taking increased learning outcomes in the experimental group compared with the control group.
ANALISIS LIFE CYCLE COST PADA PENERAPAN KONSEP GREEN BUILDING UNTUK MEWUJUDKAN EFISIENSI ANGGARAN PUBLIK : STUDI KASUS PEMBANGUNAN RUMAH DINAS Nanda, Mahdika Putra; Kurniawati, Mega
Jurnal Kajian Teknik Sipil Vol 11, No 1 (2026): JURNAL KAJIAN TEKNIK SIPIL
Publisher : Universitas 17 Agustus 1945 Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.52447/jkts.v11i1.9405

Abstract

Pembangunan rumah dinas sebagai aset publik pemerintah selama ini hanya mempertimbangkan biaya konstruksi awal (initial cost) tanpa memperhitungkan biaya jangka panjang. Pendekatan ini berpotensi mengakibatkan inefisiensi anggaran publik karena biaya operasional dan pemeliharaan yang tinggi sepanjang umur bangunan. Penelitian ini bertujuan menganalisis Life Cycle Cost (LCC) pada tiga skenario penerapan konsep green building dalam pembangunan rumah dinas guna mewujudkan efisiensi anggaran publik. Data primer bersumber dari Rencana Anggaran Biaya (RAB) pembangunan rumah dinas dua lantai senilai Rp 2,235 miliar. Analisis LCC dilakukan selama 30 tahun dengan discount rate 6%. Hasil analisis menunjukkan Skenario Green Building Dasar menghemat 11,07% dan Skenario Green Building Optimal menghemat 16,47% dari total LCC dibandingkan skenario konvensional. Break-even period dicapai pada tahun ke-18 dan ke-22, yang semakin memendek seiring kenaikan harga energi. Temuan ini menegaskan bahwa investasi green building pada rumah dinas merupakan strategi efisiensi anggaran publik jangka panjang yang terukur dan berbasis bukti