Claim Missing Document
Check
Articles

Found 2 Documents
Search

BIMBINGAN TEKNIS KEPALA LABORATORIUM SEBAGAI UPAYA PENINGKATAN KEGIATAN PRAKTIKUM DI LABORATORIUM IPA Imam Satibi; Hastri Firharmawan; Isnaini Lilis Elviyanti; Ahmad Aftah Syukron; Umi Barokah; Aulia Rahmawati; Ervian Arif Muhafid; Rasyid Zuhdi; Vian Dwi Chalisty
Community Development Journal : Jurnal Pengabdian Masyarakat Vol. 4 No. 3 (2023): Volume 4 Nomor 3 Tahun 2023
Publisher : Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/cdj.v4i3.17499

Abstract

Laboratorium IPA merupakan kegiatan untuk melakukan pengamatan dan mempraktikan hal yang telah dipelajari secara teori. Hal yang penting dalam laboraturium IPA adalah sistem pengelolaannya, supaya laboratorium IPA dapat berfungsi dengan baik dan sesuai standart. Berdasarkan hal tersebut, telah dilakukan bimbingan teknis kepada kepala laboratorium sebagai upaya peningkatan kegiatan praktikum di laboraturium IPA yang sesuai standart dari pemerintah. Bimbingan teknis ini dilakukan dengan memberikan wawasan tentang kebijakan kepala laboratorium IPA, manajemen laboratorium IPA, analisis SWOT, administrasi laboratorium IPA, sarana dan prasarana laboratorium IPA, manajemen alat dan bahan laboratorium IPA serta tata cara pembuatan modul. Kegiatan ini diikuti oleh kepala laboratorium atau guru yang mengelola laboraturium IPA di seluruh Indonesia. Bimbingan teknis ini dilakukan secara online menggunakan aplikasi Zoom. Hasil kegiatan ini yaitu menganalisis hasil pretest dan posttest selama kegiatan berlangsung dan menunjukkan hasil yang positif. sehingga kegiatan ini dapat menunjukkan bahwa bimbingan teknik kepala laboratorium IPA dapat memberikan dan meningkatkan wawasan tentang sistem pengelolaan laboratorium IPA yang bermanfaat kepada peserta.
Analisis Perbandingan Biaya dan Waktu Metode Konstruksi Modular dan Konvensional Menggunakan Microsoft Project Fredy Ekamaz; Isnaini Lilis Elviyanti; Titi Maemunah; Dwiyono Waluyo; Ahmad Aftah Syukron; Eko Priyanto; Imam Satibi
Venus: Jurnal Publikasi Rumpun Ilmu Teknik  Vol. 4 No. 3 (2026): Juni: Venus: Jurnal Publikasi Rumpun Ilmu Teknik
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/venus.v4i3.1576

Abstract

The development of the construction industry requires building methods that are faster, more cost-efficient, and capable of delivering higher quality. Conventional construction methods are still widely used in building projects; however, they often face challenges such as longer construction durations, high labor requirements, and the risk of material waste. One alternative approach is modular construction, which can accelerate project execution, improve construction quality, and reduce both material waste and project costs. This study compares conventional and modular construction methods in the development of the building at Universitas Ma'arif Nahdlatul Ulama (UMNU) Kebumen using Microsoft Project for cost and schedule analysis. The results indicate that the estimated construction cost using the conventional method is IDR 1.322.412.000, while the modular method requires IDR 830.000.000. This represents a cost saving of IDR 492.412.000, equivalent to 37,24%, when using the modular method. In terms of project duration, the conventional method is estimated to require 120 calendar days, whereas the modular method requires only 40 calendar days. Consequently, the modular method reduces the construction duration by 80 days, achieving a time efficiency of 66,67%. The findings demonstrate that the modular construction method is more efficient than the conventional method for the construction of the UMNU Kebumen building in terms of both project cost and construction duration.