Study of the Role of Construction Companies on the K3 Management System as an Effort to Improve the Quality of the Company Nurjanah; Hangga Prima Setiawan; Bambang Hardadi; Iqbal Novarino
Civilla : Jurnal Teknik Sipil Universitas Islam Lamongan Vol 9 No 2 (2024): SEPTEMBER
Publisher : Program Studi Teknik Sipil, Fakultas Teknik, Universitas Islam Lamongan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30736/cvl.v9i2.1168

Abstract

Measurement of construction companies can be declared good if implementing the Occupational Health and Safety Management System (OHSAS). Meanwhile, the most important element in the OHSAS implementation program is the company's policy on designing the construction work safety system or support from the Board of Directors for the implementing occupational safety design. This study aims to check the influence of the company's owner on the OHSA quality of the company. The survey was followed by distributing questionnaires to several construction company owners in Blitar for data collection. It was taken to determine whether this research is very influential or not at all regarding the importance of the company's owner's role regarding OHSA and the application of protective equipment to reduce work accidents on the quality and competitiveness of the company in the construction project auction in the construction project for private, local, and national governments. The results of the study showed superiors and directors of construction service companies whose roles and responsibilities have not been maximized in implementing the company’s occupational health and safety management system in Blitar. In this case, the implementation of OHSA by the company indirectly contributes to maintaining the quality of the services provided.
Evaluasi Waktu dan Biaya Proyek Konstruksi Menggunakan Kombinasi Metode Precedence Diagram Method dan Program Evaluation and Review Technique: Studi Kasus Pembangunan Ruang Kelas SMK Sore Tulungagung Deni Cahya Saputra; Hangga Prima Setiawan; Heru Hendri Iswanto
Venus: Jurnal Publikasi Rumpun Ilmu Teknik  Vol. 4 No. 4 (2026): Venus: Jurnal Publikasi Rumpun Ilmu Teknik
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/venus.v4i4.1632

Abstract

Inaccurate project planning can lead to delays and cost overruns, as occurred in the classroom-building project at SMK Sore Tulungagung, which experienced a slowdown in work progress during Phase 1 (structural work) and Phase 2 (architectural work). This study aims to analyze time planning, the critical path, project completion probability, and time and cost efficiency using a combination of the Precedence Diagram Method (PDM) and the Program Evaluation and Review Technique (PERT), through a quantitative descriptive-analytical case-study approach. The results show that the combined PDM-PERT method reduced the duration of Phase 1 from 91 to 85 days (6.59% efficiency) and Phase 2 from 140 to 120 days (14.29% efficiency), with a completion probability of 99.99% (Z = 4.14) and 100% (Z = 11.36) respectively. Application of the combined method also produced a total cost saving of IDR 87,225,902.97 (12.02%). These findings prove that the combined PDM-PERT method is effective as a tool for planning and controlling the time and cost of construction projects.
PENERAPAN VALUE ENGINEERING PADA PROYEK PEMBANGUNAN GEDUNG KAMPUS 2 POLITEKNIK NEGERI MADIUN: PENERAPAN VALUE ENGINEERING PADA PROYEK PEMBANGUNAN GEDUNG KAMPUS 2 POLITEKNIK NEGERI MADIUN Faiq; Hangga Prima Setiawan; Eva Khafidotu Purnia
Jurnal Qua Teknika Vol 16 No 02 (2026): September 2026
Publisher : Universitas Islam Balitar Blitar

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35457/quateknika.v16i02.5983

Abstract

Nilai kontrak Proyek Pembangunan Gedung Kampus 2 Politeknik Negeri Madiun sebesar Rp51.191.994.221 menuntut efisiensi biaya tanpa mengurangi fungsi dan mutu bangunan. Penelitian ini menerapkan Value Engineering (VE) melalui empat tahap job plan untuk mengidentifikasi unnecessary cost pada kelompok pekerjaan berbiaya terbesar. Hasil analisis cost model dan Pareto menunjukkan pekerjaan struktur, terutama plat, balok, dan kolom, memiliki rasio cost/worth di atas 1. Alternatif berupa penggantian merek beton ready mix, besi beton, semen site mix, dan vendor menghasilkan penghematan Rp689.155.863 (4,27%) pada pekerjaan struktur dan Rp764.963.008 (1,49%) pada total proyek. VE terbukti efektif mengoptimalkan biaya konstruksi tanpa mengorbankan fungsi dan kualitas bangunan.
ANALISIS DAMPAK LALU LINTAS KAWASAN WISATA KABUPATEN BLITAR DENGAN METODE PKJI 2023 DAN SIMULASI PTV VISSIM (Studi Kasus: Blitar Park, Jalan Raya Pojok, Kecamatan Garum, Kabupaten Blitar): ANALISIS DAMPAK LALU LINTAS KAWASAN WISATA KABUPATEN BLITAR DENGAN METODE PKJI 2023 DAN SIMULASI PTV VISSIM Arvina Salshabilla; Hendrig Sudradjat; Hangga Prima Setiawan
Jurnal Qua Teknika Vol 16 No 02 (2026): September 2026
Publisher : Universitas Islam Balitar Blitar

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35457/quateknika.v16i02.5984

Abstract

Penelitian ini menganalisis dampak lalu lintas Kawasan Wisata Blitar Park di Jalan Raya Pojok, Garum, Blitar berdasarkan PKJI 2023. Tujuannya menilai kinerja ruas jalan dan simpang, bangkitan–tarikan perjalanan, serta kebutuhan parkir. Metode yang digunakan adalah deskriptif kuantitatif melalui survei lapangan, wawancara, dokumentasi, dan simulasi VISSIM. Data dikumpulkan tiga hari (Senin, Sabtu, Minggu) dengan pencatatan volume setiap 15 menit pada 07.00–21.00 WIB. Hasil menunjukkan aktivitas Blitar Park meningkatkan volume lalu lintas, terutama akhir pekan dan hari libur. Kinerja ruas dan simpang masih baik, namun beberapa titik mengalami tundaan akibat keluar-masuk kendaraan dan keterbatasan parkir. Kebutuhan parkir melebihi kapasitas tersedia.
Evaluasi Kinerja Biaya dan Waktu Proyek dengan Metode Earned Value Management (EVM) dan Gap Analysis pada Pembangunan Rumah Kos Tiga Lantai di Kota Blitar: EVALUASI KINERJA BIAYA DAN WAKTU PROYEK DENGAN METODE EARNED VALUE MANAGEMENT (EVM) DAN GAP ANALYSIS Deka Yuda Krisna Permana; Hangga Prima Setiawan; Heru Hendri Iswanto
Jurnal Qua Teknika Vol 16 No 02 (2026): September 2026
Publisher : Universitas Islam Balitar Blitar

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35457/quateknika.v16i02.5985

Abstract

Keterlambatan jadwal dan pembengkakan biaya masih menjadi persoalan yang berulang pada proyek konstruksi gedung sederhana, termasuk pada bangunan rumah kos bertingkat yang dikerjakan oleh kontraktor skala kecil-menengah. Penelitian ini mengevaluasi kinerja biaya dan waktu pada proyek pembangunan rumah kos tiga lantai di Kota Blitar dengan luas bangunan 324 m² dan nilai kontrak (Budget at Completion/BAC) sebesar Rp1.408.700.000, menggunakan kombinasi Earned Value Management (EVM) dan Gap Analysis. EVM digunakan untuk menghitung Planned Value (PV), Earned Value (EV), Actual Cost (AC), Schedule Variance (SV), Cost Variance (CV), Schedule Performance Index (SPI), Cost Performance Index (CPI), serta proyeksi Estimate at Completion (EAC), Estimate to Completion (ETC), Variance at Completion (VAC), dan Estimate All Schedule (EAS); Gap Analysis kemudian digunakan untuk membandingkan kondisi rencana dan kondisi aktual sehingga titik kritis penyebab deviasi dapat diidentifikasi. Pada kondisi tanpa penerapan sistem pengendalian, progres aktual pada akhir minggu ke-23 hanya mencapai 80% dengan EV sebesar Rp1.126.960.000 dan AC sebesar Rp1.549.570.000, menghasilkan SPI 0,80 dan CPI 0,73 — menunjukkan proyek terlambat sekaligus tidak efisien dari segi biaya. Proyeksi EAC mencapai Rp1.929.726.027 dengan VAC minus Rp521.026.027 dan EAS sekitar 29 minggu, atau berpotensi mundur 6 minggu dari rencana. Gap Analysis menunjukkan gap waktu 20% dan gap biaya Rp140.870.000, dengan titik kritis pada pekerjaan beton (35,04%) dan pekerjaan pasangan (17,21%) yang bersama-sama menyumbang 52,25% bobot proyek. Setelah tindakan korektif berbasis EVM dan Gap Analysis disimulasikan — berupa monitoring mingguan, penambahan personil, dan lembur terbatas pada pekerjaan kritis — progres meningkat menjadi 95% dengan SPI dan CPI sama-sama 0,95 dan EAS tereduksi menjadi ±24,21 minggu. Target belum sepenuhnya tercapai karena tersisa 5% pekerjaan senilai Rp70.435.000, namun nilai tersebut merupakan pekerjaan yang belum menjadi earned value, bukan biaya tambahan di luar kontrak. Hasil ini menegaskan bahwa integrasi EVM dan Gap Analysis efektif untuk mendeteksi deviasi sejak dini sekaligus mengarahkan tindakan korektif pada pekerjaan yang paling berpengaruh terhadap kinerja proyek secara keseluruhan.