Analisis Perbandingan Uprating dan Sisip Transformator Tiga Fase untuk Mengantisipasi Terjadinya Overload pada Transformator Distribusi Penyulang GJN-12 Nomor Tiang U3-89/1 PT PLN (Persero) ULP Yogyakarta Kota Ningrum, Nur Risya Difa Kusuma; Ginting, Nina Loenca Br; Muflih, Haidar Nabil; Ramadhan, Muhammad Dwi Cahyo; Nugraha, Candra Febri
Jurnal Listrik, Instrumentasi, dan Elektronika Terapan Vol 4, No 2 (2023)
Publisher : Departemen Teknik Elektro dan Informatika Sekolah Vokasi UGM

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22146/juliet.v4i2.87124

Abstract

Seiring bertambahnya jumlah penduduk, kebutuhan listrik juga mengalami peningkatan tiap tahun. Pesatnya pertumbuhan penduduk dan ekonomi di area PLN (Persero) ULP Yogyakarta Kota berpengaruh pada bertambahnya permohonan tambah daya listrik oleh pelanggan yang mengakibatkan terjadinya overload (beban lebih) pada transformator distribusi. Berdasarkan ketetapan SPLN No. 17 Tahun 1979 menyatakan bahwa terdapat tiga macam kondisi transformator yaitu normal, waspada dan darurat. Menurut persentase pembebanan transformator, kondisi waspada dan darurat terjadi saat pembebanan lebih dari 80%. Oleh karena itu, dilakukan simulasi dilakukan untuk mengetahui kondisi transformator ketika dilakukan penambahan daya. Pada metode penelitan ini membandingkan pengaruh uprating dan sisip transformator untuk mengantisipasi terjadinya overload. Metode perbandingan tersebut berdasarkan tiga aspek yaitu persentase pembebanan, persentase drop voltage dan biaya pengerjaan. Berdasarkan hasil simulasi pada penelitian ini, kedua metode tersebut menunjukkan hasil efektivitas yang sama, dengan persentase pembebanan mengalami penurunan 75,9% dan penurunan persentase drop voltage 1,81%. Sedangkan biaya pengerjaan untuk uprating sebesar Rp44.417.670, sedangkan untuk sisip transformator sebesar Rp48.843.740. Biaya pengerjaan uprating transformator lebih murah karena tidak memerlukan biaya pemasangan tiang serta konstruksi CC7. Maka dari itu, metode upratinglebih efisien dari metode sisip transformator dalam hal biaya pengerjaan. 
Analysis of Mean Time Between Failures and Reliability of a 150 kV Circuit Breaker at Bantul Substation Using the Maximum Likelihood Estimation Method Rachmanto, Arsya Hilmana; Nugraha, Candra Febri
Emitor: Jurnal Teknik Elektro Vol 24, No 3: November 2024
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.23917/emitor.v24i3.5908

Abstract

As technology advances in the modern era, the need and consumption of electrical energy in society has increased rapidly. With the need for electrical energy continuing to increase, various disturbances in the electrical system, including in substations, cannot be predicted when they will occur. The Power Breaker (PMT) is a vital equipment in the Bantul 150 kV substation power system that functions to break the electrical circuit under load to prevent interference and damage to equipment and ensure the smooth distribution of electrical energy to consumers. Based on the role of PMT, the estimation of PMT failure time has not been studied in depth. This study aims to analyze the Mean Time Between Failure and Reliability of the Bantul 150 kV Substation PMT. The method used in assessing PMT life is Maximum Likelihood Estimation. The data used are the results of observations of ten different PMTs in Bantul Substation. The results of the analysis show that the average value of the time period between failures (MTBF) varies between different PMTs. The highest MTBF value is PMT Wirobrajan 2 with a damage period of about 14.55 months, while the lowest MTBF is PMT Semanu 2 with a damage period of 5.48 months. The results of the analysis of failure probability, cumulative failure probability, reliability probability, and damage rate of 150 kV PMTs show significant variations between different PMTs. Reliability value produces the lowest value on PMT Transformer 3. While the highest Reliability value produces the highest value, namely on PMT Kopel. With the known MTBF and Reliability of 150 kV PMT at Bantul Substation, it can be used as a basis for maintenance and maintenance of PMT in its operation at Bantul Substation.
A Techno-Economic Analysis for Raja Ampat Off-Grid System Subekti, Lukman; Nugraha, Candra Febri; Arrofiq, Muhammad; Muthahhari, Ahmad Adhiim; Prasetyo , Budi Eko; A’yun, Qurrota
JURNAL NASIONAL TEKNIK ELEKTRO Vol 13, No 1: March 2024
Publisher : Jurusan Teknik Elektro Universitas Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25077/jnte.v13n1.1180.2024

Abstract

Indonesia, an expansive archipelagic nation with over 17,000 islands, encounters significant challenges in ensuring a sustainable and dependable electricity supply, particularly in its West Papua region. The reliance on diesel fuel for electricity generation in this area poses substantial environmental risks and incurs high costs. A comprehensive research study addressing the environmental and economic challenges associated with diesel dependence in West Papua proposed a shift towards sustainable and cost-effective solutions by advocating for adopting off-grid hybrid power systems. This study targeted Yensawai Village in the Raja Ampat Islands, employing a detailed techno-economic analysis through HOMER Pro to identify the most cost-effective system configurations. The findings indicated that the optimal setup consists of a 160 kW diesel generator, complemented by a 70.1 kW solar photovoltaic (PV) system, a 30 kW inverter, and an 80 kWh battery storage unit. This configuration not only proved to be economically viable by reducing the levelized cost of electricity (CoE) by 15.7%—achieving a CoE of $0.236/kWh compared to the base scenario's $0.280/kWh—but also highlighted the potential for similar benefits across regional systems. By focusing on the economic advantages of hybrid energy configurations, this research contributes significantly to the broader discourse on sustainability and the urgent need to reduce diesel dependence, offering a practical approach to cutting electricity generation costs in remote island communities and advancing sustainability initiatives.