Claim Missing Document
Check
Articles

Found 3 Documents
Search

Analisis Distribusi Pembebanan pada Bangunan Tradisional Jawa ‘Limasan’ Putri Rahayu, Anggita; Cahyaningtyas, Aisya; Setiawan, Feri; Asri Ranivan, Imam; Asnan Alvaru, Irvansyah; Rahmawati, Yovita; Eko Bawono, Septiono
Prosiding TAU SNARS-TEK Seminar Nasional Rekayasa dan Teknologi Vol. 3 No. 1 (2024): Prosiding TAU SNARS-TEK Seminar Nasional Rekayasa dan Teknologi 2024
Publisher : Fakultas Teknik dan Teknologi - TANRI ABENG UNIVERSITY

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47970/snarstek.v2i1.569

Abstract

Limasan merupakan salah satu bangunan tradisional Jawa. Bangunan ini disebut limasan karena memiliki atap yang berbentuk limas. Atap limasan merupakan jenis atap tradisional jawa yang terbuat dari kayu dan memiliki desain unik yang mempengaruhi cara distribusi beban pada struktur rangka atap. Pendekatan penelitian ini adalah deskriptif kuantitatif. Tahap penelitian meliputi: observasi lapangan, dokumentasi, analisis struktural dan penarikan kesimpulan. Dengan menggunakan metode analisis struktural dan pemodelan komputer, penelitian ini mengeksplorasi bagaimana atap limasan menanggung beban, memahami peran elemen strukturalnya dalam mendukung beban vertikal dan horizontal. Tujuan penelitian ini diharapkan dapat memberikan wawasan yang lebih baik dalam mempertahankan dan memperbaiki struktur atap tradisional agar tetap kokoh dan tahan dalam menghadapi beban-beban yang mungkin terjadi. Hasil penelitian menunjukkan bahwa limasan memiliki distribusi pembebanan yang unik, dengan penekanan pada distribusi beban. Distribusi beban dari atap sebagai beban mati dan angin sebagai beban hidup, sehingga distribusi beban terberat bertumpu di soko guru. Hasil analisis juga memberikan pemahaman mendalam tentang kinerja struktural limasan terhadap gaya dalam dan gaya lateral. Temuan ini dapat memberikan panduan untuk perencanaan konstruksi yang optimal dan memperkaya pemahaman tentang karakteristik distribusi beban pada bangunan tradisional seperti limasan.
Rizaldi Patria Efisiensi Anggaran Biaya Pada Pembangunan Masjid Haya Bohol, Rongkop, Gunungkidul Patria, Rizaldi; Eko Bawono, Septiono; Putri Rahayu, Anggita
Media Komunikasi Dunia Ilmu Sipil (MoDuluS) Vol 6 No 2 (2024): Desember 2024
Publisher : Universitas Veteran Bangun Nusantara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32585/modulus.v6i2.5913

Abstract

The construction of Masjid Haya was carried out to complement public facilities in Kalurahan Bohol, Rongkop, Gunungkidul. The construction was carried out through mutual cooperation. In the context of public buildings, collaboration and community cooperation become determining factors for the success of the project. Community participation and effective management are two mutually supportive factors in the effort to build high-quality and sustainable public facilities. This research aims to determine the efficiency of the budget for public facility construction in the implementation of development with community participation. The method used is quantitative analysis and field interviews to determine category grouping. Interviews were conducted to delve into information regarding the cost needs for development and community involvement. The results of the calculation analysis show: first, the percentage of the budgetary needs for materials/raw materials if the work involves a jointly owned building from the two groups is 3,35%; second, the percentage of the budgetary needs for third parties is 34,173% of the total; third, the percentage of the budget carried out through mutual cooperation from the overall budget is 8,341%. Work that does not require skill can be carried out through mutual cooperation if the work involves a jointly owned building, as it can reduce the budget cost by 10.564%. This third party consists of workers who have expertise in their respective fields and are capable of carrying out the work well and efficiently. The analysis results show that the labor cost ranges from 30% to 40%, depending on the difficulty of the work in the field. The percentage of the material budget contributed by the local community for the construction is 3,35%.
Desain Tempat Pembuangan Sampah Kawasan Pantai di Pantai Krakal, Gunungkidul Ranivan, Imam Asri; Abdur Rasyid, Aban; Winda Setyaningsih, Afriana; Putri Rahayu, Anggita; Fatin Hasanah, Azizah; Nur Evita Sari, Dela; Safitri, Dian; setiawan, Feri; Asnan Alfaru, Irvansyah; Winarni, Isti; Sulistyaningrum, Laela; Renaldi Febriansyah, Muhammad; Ajeng Wulandari, Putri; Dwi Pamungkas, Revangga; Putro Pamungkas, Tri; Eko Bawono, Septiono; Patria, Rizaldi
Media Komunikasi Dunia Ilmu Sipil (MoDuluS) Vol 5 No 2 (2023)
Publisher : Universitas Veteran Bangun Nusantara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32585/modulus.v5i2.4314

Abstract

This program aims to reduce the waste population in the Krakal Beach area. Because there are many piles of garbage and the beach ecosystem has begun to be disturbed which has resulted in polluted sea water, beach sand becomes dirty, and piles of garbage emit odors so that the air is also polluted. The sample from this activity program consisted of photos/images taken directly from Krakal Beach, surveys and interviews from the local community and the local Pokdarwis chairperson. The data obtained was processed using a quantitative survey method to calculate and calculate the volume of waste so that it can estimate the required size of Temporary Disposal Sites to be built to accommodate this waste. It is hoped that this program can have a positive impact on the Krakal Beach ecosystem and provide comfort for visitors for the cleanliness created.