Claim Missing Document
Check
Articles

Found 4 Documents
Search
Journal : JOURNAL OF SCIENCE AND SOCIAL RESEARCH

ANALISIS WAKTU BAKU PROSES PRODUKSI ROTI DENGAN METODE STOPWATCH DI UKM FANDRA BAKERY Mufrida Meri; Hary Fandeli; Ratih Zulia Ramadhani
JOURNAL OF SCIENCE AND SOCIAL RESEARCH Vol 5, No 2 (2022): June 2022
Publisher : Smart Education

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54314/jssr.v5i2.887

Abstract

Indonesia has many industries engaged in food and culinary.  Among them are small and medium enterprises (SMEs) which are very large and make a large contribution to Indonesian economy.  To ensure the sustainability of the industry, there is a standard time for each production process.  Standard time is the work of observing and recording the working times of both each element or cycle using the tools that have been provided. UKM Fandra Bakrie is one of the small and medium-sized industries that produce bread in Padang City. It is important to know the standard time of the bread making process so that it becomes a reference for management policies. Time measurement using the stopwatch method by calculating the cycle time of each element of bread making work. Measurement data is tested statistically using uniformity tests and data adequacy tests.  Then the calculation of standard time by considering adjustment factors and leeway factors.  Standard time is used as the basis in determining the amount of production in a given period and for planning production. Based on the results of the study obtained the total time standard for bread production at UKM Fandra Bakery is 287.99 seconds / unit or 4.8 minutes / unit. Thus UKM Fandra Bakery is able to produce as much as 3,200 Pcs per day.
ANALISIS PEMILIHAN SUPPLIER OLI MENGGUNAKAN METODE ANALYTICAL HIERARCHY PROCESS DI BENGKEL JEFFRY MOTOR Mufrida Meri; Hary Fandeli; Roza Linda; Alan Muhammad Rusdi
JOURNAL OF SCIENCE AND SOCIAL RESEARCH Vol 6, No 2 (2023): June 2023
Publisher : Smart Education

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54314/jssr.v6i2.1239

Abstract

Abstract: This research discusses the analysis of the selection of lubricating oil suppliers using the AHP (Analytical Hierarchy Process) method. The problems in this research are (1) there is no proper supplier selection decision making system (2) supplier selection and determination is not optimal. The purpose of this study is (1) to help decision makers design the right decision making system in supplier selection (2) to determine the best lubricating oil supplier. The data collection techniques in this study were observation, interviews and questionnaires. Data processing is assisted by the Microsoft excel application and the Expert Choice application using the AHP method. The results of this research are as follows: (1) priority I is interest with a weight value of 0.384 or 38.4% (Ms.Excel) and 0.386 or 38.6% (Expert Choice), priority II is quality with a weight value of 0.262 or 26.2% (Ms.Excel) and 0.264 or 26.4% (Expert Choice), priority III is the price with a weighted value of 0.213 or 21.3% (Ms.Excel) and 0.212 or 21.2% (Expert Choice), priority IV is delivery with a value weighted 0.077 or 7.7% (Ms.Excel) and 0.076 or 7.6% (Expert Choice), priority V is service with a weight value of 0.063 or 6.3% (Ms.Excel) and 0.062 or 6.2% ( Expert Choice). (2) the best supplier is Prima XP with a final priority weight value of 0.348 or 34.8% (Ms.Excel) and 0.345 or 34.5% (Expert Choice), then Shell supplier with a final priority weight value of 0.250 or 25% (Ms. Excel) and 0.251 or 25.1% (Expert Choice).Keywords: decision support system; supplier selection; AHP Abstrak: Penelitian ini mengenai analisis pemilihan supplier pelumas oli dengan mengggunakan metode AHP (Analytical Hierarchy Process). Permasalahan pada penelitian ini adalah belum memiliki sistem pengambilan keputusan yang tepat untuk pemilihan supplier serta penetapan pemiliahan supplier belum optimal.. . Tujuan penelitian ini adalah membantu pengambil keputusan untuk merancang sistem pengambilan keputusan yang tepat dalam pemilihan supplier dan menentukan supplier oli yang tepat. Pengolahan data dibantu dengan aplikasi Expert Choice dengan menggunakan metode AHP. Hasil dari penelitian ini sebagai berikut: (1) prioritas I yaitu peminat dengan nilai bobot 0,384 atau 38,4% (Ms.Excel) dan 0,386 atau 38,6% (Expert Choice), prioritas II yaitu kualitas dengan nilai bobot 0,262 atau 26,2% (Ms.Excel) dan 0,264 atau 26,4% (Expert Choice), prioritas III yaitu harga dengan nilai bobot 0,213 atau 21,3% (Ms.Excel) dan 0,212 atau 21,2% (Expert Choice), prioritas IV yaitu pengiriman dengan nilai bobot 0,077 atau 7,7% (Ms.Excel) dan 0,076 atau 7,6% (Expert Choice), prioritas V yaitu layanan dengan nilai bobot 0,063 atau 6,3% (Ms.Excel) dan 0,062 atau 6,2% (Expert Choice). (2) supplier yang terbaik adalah Prima XP dengan nilai bobot prioritas akhir 0,348 atau 34,8% (Ms.Excel) dan 0,345 atau 34,5% (Expert Choice), kemudian supplier Shell dengan nilai bobot prioritas akhir 0,250 atau 25% (Ms.Excel) dan 0,251 atau 25,1% (Expert Choice).Kata kunci: sistem pendukung keputusan; pemilihan supplier; AHP
PENGUKURAN WAKTU BAKU SEBAGAI DASAR PEMBERIAN UPAH INSENTIF DI PABRIK TAHU TM KAMBANG Rozza Linda; Mufrida Meri; Hary Fandeli; Domi Hidayat
JOURNAL OF SCIENCE AND SOCIAL RESEARCH Vol 6, No 3 (2023): October 2023
Publisher : Smart Education

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54314/jssr.v6i3.1491

Abstract

Tujuan penelitian ini adalah untuk menentukan waktu baku pada proses produksi tahu di Pabrik Tahu TM Kambang Kec. Lengayang Pesisir Selatan yang sesuai dengan kemampuan karyawan, untuk menerapkan pemberian upah insentif berdasarkan waktu baku di Pabrik Tahu TM Kambang Kec. Lengayang Pesisir Selatan. Metode pengumpulan data yang digunakan dalam penelitian ini yaitu data primer yang diperoleh secara langsung dari pengukuran yang dilakukan. Sedangkan metode analisis data menggunakan metode studi waktu (time study). Jumlah sampel sebesar 18 orang pekerja di pabrik tahu TM kambang kec. Lengayang pesisir selatan. Metode yang digunakan adalah metode stopwatch time study, setelah diketahui waktu standarnya, kemudian dilakukan perbaikan berdasarkan waktu standar yang diperoleh sebelumnya, mengurangi gerakan-gerakan yang tidak efektif, dan mengurangi waktu yang terbuang sehingga dapat diketahui tingkat produktivitasnya. Dari hasil penelitian yang dilakukan proses produksi tahu Di Pabrik Tahu TM Kambang Kec. Lengayang Pesisir Selatan mulai dari proses pemanasan air sampai ke proses pemotongan tahu membutuhkan waktu baku selama 326, 486 menit atau 5, 43 jam. Berdasarkan data waktu perelemen kerja proses produksi tahu Di Pabrik Tahu TM Kambang Kec. Lengayang Pesisir Selatan di temukan pemberian insentif adalah dari output standar yang berlebihan, output standar Di Pabrik Tahu TM Kambang adalah 12 unit (karung), sehingga pemberian insentif selama 1 bulan kerja (23 hari) sebesar Rp 1.555.000,- dengan upah dasar perhari Rp. 60.000,-.
ANALISIS RISIKO ERGONOMI POSTUR KERJA KARYAWAN DENGAN METODE REBA DAN NBM DI PT. MMZ Meri, Mufrida; Linda, Rozza; Risky, Ari
JOURNAL OF SCIENCE AND SOCIAL RESEARCH Vol 8, No 2 (2025): May 2025
Publisher : Smart Education

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54314/jssr.v8i2.2969

Abstract

Abstract: Intensive manual handling activities in the spice processing industry often lead to musculoskeletal complaints among workers. This study aims to analyze the working posture of employees at the cinnamon wood unloading station at PT. MMZ using the Rapid Entire Body Assessment (REBA) and Nordic Body Map (NBM) methods. The REBA method is used to assess posture-related risk and provide improvement recommendations, while the NBM method identifies body parts experiencing discomfort. The results of the study indicate that the majority of workers fall into the high-risk category based on REBA analysis, with non-ergonomic postures such as bending, twisting the body, and lifting heavy loads being the main contributing factors. Additionally, the NBM findings show that most workers experience discomfort in the neck, shoulders, back, and waist. The conclusion of this study highlights the importance of ergonomic posture adjustments to reduce the risk of musculoskeletal injuries and improve worker well-being. Keyword: Working Posture; Musculoskeletal; REBA; NBM; Ergonomics. Abstrak: Kegiatan manual handling yang intens di industri pengolahan rempah-rempah sering kali menyebabkan keluhan muskuloskeletal pada pekerja. Penelitian ini bertujuan untuk menganalisis postur kerja karyawan di stasiun pembongkaran kayu kulit manis di PT. MMZ menggunakan metode Rapid Entire Body Assessment (REBA) dan Nordic Body Map (NBM). Metode REBA digunakan untuk menilai risiko postur kerja dan memberikan rekomendasi perbaikan, sedangkan metode NBM digunakan untuk mengidentifikasi bagian tubuh yang mengalami keluhan. Hasil penelitian menunjukkan bahwa mayoritas pekerja berada dalam kategori risiko tinggi berdasarkan analisis REBA, dengan postur kerja yang tidak ergonomis seperti membungkuk, memutar tubuh, dan mengangkat beban berat menjadi faktor utama. Selain itu, hasil NBM menunjukkan bahwa sebagian besar pekerja mengalami keluhan pada leher, bahu, punggung, dan pinggang. Kesimpulan dari penelitian ini menegaskan pentingnya penyesuaian postur kerja yang ergonomis untuk mengurangi risiko cedera muskuloskeletal dan meningkatkan kesejahteraan pekerja. Kata kunci: Postur Kerja; Muskuloskeletal; REBA; NBM; Ergonomi.