Implementasi Kode Etik Insinyur dan Profesionalisme terhadap Signifikansi Metode Pelaksanaan dan Manajemen Proyek pada Proyek Konstruksi Rehabilitasi Laboratorium dan Lapangan SMPN 2 Kota Mojokerto Rahmanita Nuzula; Ridho Bayu Aji; M. Sigit Darmawan; Budi Suswanto; RPX Rooswan Happmono
Inisiatif: Jurnal Ekonomi, Akuntansi dan Manajemen Vol. 4 No. 2 (2025): April : Inisiatif : Jurnal Ekonomi, Akuntansi dan Manajemen
Publisher : Universitas 45 Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30640/inisiatif.v4i2.3809

Abstract

The implementation method and project management are important points in the running of this rehabilitation project. In accordance with the planning document, it is expected that the significance of planning and implementation does not have a much different percentage. The implementation method is the center of the formation of the plan until it becomes a new building after rehabilitation, as well as project management that focuses on time and quality control is also part of the implementation of the project. The results of the observation of engineering practices found that the percentage of building rehabilitation implementation methods that occurred in the field was 97.43%, while the percentage of field rehabilitation was 97.33%. So the total percentage of the overall work carried out against the plan is 97.38%. The results for time and quality management were obtained that from the 19th to the 20th week there was a delay in the work because in that week there was a material delay, this is known from the analysis of the daily report on the project. In completing the work according to the specified time is carried out with quality according to specifications, re-scheduling is carried out on certain work. From these results, it can be said that they are responsible for their profession which reflects the code of ethics of engineers as well as the ability to complete work well which reflects professionalism.
Construction Management in the New Building Project for the Haji Medan General Hospital Nur Anisa Syafira Bestari; Ridho Bayu Aji
INTERDISIPLIN: Journal of Qualitative and Quantitative Research Vol. 1 No. 2 (2024)
Publisher : Penerbit Hellow Pustaka

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61166/interdisiplin.v1i2.10

Abstract

Improving health services is one of the priorities in North Sumatra Province, a province that is currently carrying out a lot of development, one of which is the construction of hospitals which are used to meet the health needs of the people in North Sumatra. The development process carried out is a form of service improvement. This study was carried out to analyze the development management of RSU Haji Medan which was carried out by PT. KSO Adhi-Penta. Good construction management needs to be implemented to ensure that work can be completed according to the implementation schedule. The problem formulation in this research discusses three research focuses, namely: 1) Supervision of project management at RSU Haji Medan, 2) Arrangement of human and material resources, 3) Arrangement of scheduling of RSU Haji Medan project activities. The analytical method in this research was carried out using the and Build principle. The Design and Build method provides opportunities to increase time and cost efficiency. The results of this research are: 1) Construction supervision management ensures that all construction activities take place in accordance with the plans, specifications and standards that have been set. 2) Human resources (HR) and material factors cannot be separated because they will have an impact on the quality and running of the business activities carried out. Not only that, the quality of human resources and materials will provide maximum results. 3) PT. KSO Adhi-Penta's target for completion and implementation was successful in achieving the progress that had been determined step by step in accordance with the plan, this indicates that in the construction of RSU Haji Medan, the contractor or developer was successful in implementing management principles well.
Kajian Profesionalisme dan Kode Etik Insinyur dalam Kualitas Pekerjaan Proyek Pembangunan Gedung X Merisa Ayu Pramesti; Ridho Bayu Aji; Nufrizal Faried Hanafi; M. Sigit Darmawan; Budi Suswanto
Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil Vol. 3 No. 3 (2025): Juli: Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipi
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/konstruksi.v3i3.981

Abstract

This study examines the application of engineering professionalism and ethical conduct in the construction of Building X, focusing on the quality of both substructure and superstructure works. The research was conducted through field observation, interviews with project stakeholders, and literature review, analyzed using a qualitative descriptive approach. Several issues were identified on site, including bore pile misalignment, waterlogging due to excess soil accumulation, poor concrete quality (honeycomb), and work delays caused by reinforcement order errors and subcontractor replacement. The assessment of professionalism and ethics refers to the 2021 Indonesian Code of Ethics for Engineers. The findings indicate that several aspects of professionalism, such as supervisory decisiveness, technical responsibility, and proactive communication, were applied appropriately. However, deviations were also observed, particularly in planning, quality control, and safety implementation. The study recommends improved coordination between supervisors and contractors, technical training for workers, and stronger enforcement of ethical compliance to enhance the overall quality of construction outcomes.
Analisis Keterlambatan dalam Pelaksanaan Proyek Konstruksi Rumah Hunian Dempsey Hill, Citraland Utara, Kota Surabaya Yafie Abdillah Akbar; Ridho Bayu Aji; Gentur Prihartono; Muhammad Sigit Darmawan; Budi Suswanto
Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipil Vol. 3 No. 3 (2025): Juli: Konstruksi: Publikasi Ilmu Teknik, Perencanaan Tata Ruang dan Teknik Sipi
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/konstruksi.v3i3.983

Abstract

This journal examines the factors that have the potential to cause delays in the implementation of the Dempsey Hill residential housing construction project, North Citraland, Surabaya. Projects managed by CV. Tirta Kusuma has a target of completion in 10 months, but there are indications of delays that affect the schedule and costs. This study aims to identify and analyze the dominant factors causing delays, such as project management, material procurement, and human resources. The methods used include observation, questionnaire distribution, and literature study. The results of this analysis are expected to provide recommendations to improve time management, resource efficiency, and control of future construction projects. The results of data analysis in this study indicate that project delays are primarily caused by material delays and errors in work execution, as concluded based on the results of factor analysis.