Perencanaan Gedung Hunian Terpadu Provinsialat dan Panti Jompo CIJ Flores Timur Yansiku, Sandy; Geusephe A.A. Djoja; Alexius Jodi; Maria H. Alior
Abdimas Toddopuli: Jurnal Pengabdian Pada Masyarakat Vol. 7 No. 2 (2026): Volume 7, No 2, Juni 2026
Publisher : Universitas Cokroaminoto Palopo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30605/atjpm.v7i2.7672

Abstract

Kegiatan pengabdian kepada masyarakat ini bertujuan menyusun perencanaan komprehensif Gedung Provinsialat CIJ Flores Timur yang mencakup rumah biara, kapela, ruang tidur, ruang makan, ruang pertemuan, serta fasilitas panti jompo untuk para suster purnabakti. Perencanaan ini dilatarbelakangi kebutuhan CIJ akan hunian terpadu yang aman, nyaman, serta mendukung aktivitas harian para penghuni, termasuk suster lansia yang memerlukan fasilitas khusus. Proses perancangan dilakukan melalui survei lapangan, pengukuran lahan, wawancara dengan pimpinan biara dan warga sekitar, serta diskusi teknis bersama tim dari Universitas Nusa Nipa. Tantangan utama teridentifikasi pada kondisi kontur lahan miring, keberadaan jalur sungai kering di sisi timur, serta kebutuhan penimbunan dan penguatan tanah. Desain bangunan dibuat menggunakan aplikasi BIM (Revit) untuk mengintegrasikan aspek arsitektur, struktur, mekanikal, dan elektrikal serta mempermudah perhitungan volume material. Hasil kegiatan berupa paket lengkap gambar perencanaan yang meliputi denah, tampak, potongan, detail struktur, utilitas, model 3D, serta Rencana Anggaran Biaya (RAB) sebagai dasar penggalangan dana dan pelaksanaan pembangunan. Kegiatan ini diharapkan menjadi kontribusi nyata dalam mendukung keberlanjutan karya pelayanan CIJ Flores Timur.
Kajian Eksperimental dan Numerikal Kekuatan dan Daktilitas Mortar-filled Hollow Column akibat Beban Aksial Konsentris Yansiku, Sandy Immanuel; Duran, Yohanes G. G. L.; Santos, Anjeli Dos
Jurnal Talenta Sipil Vol 9, No 1 (2026): Februari
Publisher : Universitas Batanghari Jambi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33087/talentasipil.v9i1.1176

Abstract

The axial load-carrying capacity of hollow concrete columns significantly decreases when the wall thickness is inadequate, leading to premature crushing or instability of the outer shell. The internal void causes the column wall to behave as a thin shell structure, rendering it susceptible to local buckling and stiffness degradation. Several structural failures, particularly in hollow pile foundations and prestressed concrete poles, have been attributed to this reduction in load-bearing capacity. This study aims to evaluate the effectiveness of mortar infill as an internal strengthening technique to enhance the strength and ductility of hollow concrete columns while maintaining a reduced self-weight. The research employs both experimental and numerical approaches. The experimental program involves axial compression tests on eleven hollow cylindrical specimens with varying wall thicknesses and mortar infill configurations. Complementary finite element analyses are conducted to calibrate a material constitutive model consistent with the experimental behavior, followed by the development of a numerical interaction diagram tailored for hollow column systems. The results demonstrate that mortar infill substantially improves the axial compressive strength, with the extent of enhancement being proportional to the mortar’s compressive strength. Furthermore, the infill induces a more uniform stress distribution and triaxial confinement effect, leading to an improvement of up to 5.6% in lateral performance. Overall, mortar infill is shown to be an effective internal strengthening method that enhances structural stability and delays sudden failure in hollow concrete columns.
CRITICAL PATH SCHEDULLING PADA PROYEK KONSTRUKSI GEDUNG KULIAH UNIVERSITAS NUSA NIPA DENGAN PERBEDAAN STANDAR ANALISA PRODUKTIVITAS Neri Wara, Silvina Saraphova Putri; Yansiku, Sandy Immanuel; Kaidu, Triapriono
SIARTEK - Jurnal Teknik Sipil dan Arsitektur Vol 12 No 1 (2026): SIARTEK - Jurnal Teknik Sipil dan Arsitektur
Publisher : Program Studi Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Dalam bidang konstruksi baik gedung, jalan maupun jembatan, penjadwalan memiliki peranan penting karena mengatur waktu dan urutan berbagai tahap, serta hubungan antar aktivitas pekerjaan. Penjadwalan yang dibuat berdasarkan bobot pekerjaan dan perkiraan waktu per minggu sering sekali digunakan dalam proyek konstruksi yang bersifat lokal/setempat. Penjadwalan seperti ini dapat menimbulkan penyimpangan interpretasi mengenai urutan dan durasi setiap kegiatan proyek selama konstruksi berlangsung. Penjadwalan yang efektif harus disusun berdasarkan estimasi waktu yang tepat, dan hal ini dapat dilakukan dengan menggunakan metode network planning. Penelitian ini bertujuan untuk mengetahui sistem penjadwalan proyek konstruksi, estimasi durasi akhir proyek konstruksi serta kegiatan-kegiatan yang berada pada jalur kritis berdasarkan produktivitas berbasis SNI 2008 dan Peraturan Menteri PUPR Tahun 2024. Penelitian ini dilakukan menggunakan bantuan program Microsoft Project dengan metode Crticial Path Method. Hasil penelitian dengan analisis Critical Path Method menunjukkan bahwa SNI 2008 membutuhkan waktu 225 hari sedangkan Permen PUPR membutuhkan waktu 246 hari. Pekerjaan yang termasuk dalam jalur kritis berdasarkan SNI 2008 dan Peraturan Menteri PUPR 2024 sama yaitu pekerjaan persiapan, pekerjaan fondasi foot plat, pekerjaan beton bertulang lantai 1, pekerjaan beton bertulang lantai 2, pekerjaan beton bertulang lantai 3, pekerjaan pelat atap, pekerjaan dinding dan kusen, pekerjaan plafon dan plesteran, pekerjaan acian dan pekerjaan keramik