Claim Missing Document
Check
Articles

Found 2 Documents
Search

SOSIALISASI PELATIHAN PEMBUATAN PUPUK ORGANIK CAIR DARI LIMBAH CAIR TAHU KKN PMD UNRAM DESA PUYUNG Maryam, Siti; Mazlina, Resta; Hadinata, Angga Pratama; Imanullah, Idwar; Putri, Indri Widia; Irham, Irham; Hilmiati, Hilmiati; Firas, Muhammad Aldi Julian; Febriani, Nilmala; Nirmayani, Sujarti
Jurnal Wicara Vol 3 No 3 (2025): Jurnal Wicara Desa
Publisher : Universitas Mataram

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29303/wicara.v3i3.6784

Abstract

Limbah tahu cair merupakan salah satu sumber pencemaran lingkungan jika tidak dikelola dengan baik. Oleh karena itu, program Kuliah Kerja Nyata Pengabdian Masyarakat (KKN PMD) Universitas Mataram Desa Puyung mengadakan sosialisasi dan pelatihan pembuatan pupuk organik cair dari limbah tahu cair sebagai solusi inovatif dalam pengelolaan sampah. Kegiatan ini bertujuan untuk meningkatkan kesadaran masyarakat akan pentingnya pengolahan sampah dan memberikan keterampilan dalam memanfaatkan limbah tahu menjadi produk yang memiliki utilitas bagi sektor pertanian. Metode yang digunakan dalam kegiatan ini antara lain sosialisasi dan demonstrasi pembuatan pupuk organik cair. Hasil kegiatan menunjukkan bahwa masyarakat Desa Puyung sangat antusias mengikuti pelatihan dan memahami proses pembuatan pupuk organik cair. Program ini diharapkan dapat menjadi langkah awal dalam menciptakan sistem pertanian yang lebih ramah lingkungan dan berkelanjutan, serta mendukung konsep Zero Waste dalam pengelolaan limbah industri domestik dan kecil.
Analisis Hasil Commissioning Test Transformator Distribusi 100 kVA pada Rumah Sakit As Syifa Hadinata, Angga Pratama; Nrartha, I Made Ari; Nababan, Sabar
JEITECH (JOURNAL OF ELECTRICAL ENGINEERING, INFORMATION TECHNOLOGY, CONTROL ENGINEERING, AND ROBOTIC) Vol. 3 No. 2 (2025): Edisi Agustus 2025
Publisher : Depertment of Electrical Engineering University of Mataram

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Commissioning test on a distribution transformer is a series of tests conducted to ensure that the distribution transformer functions properly and meets the specifications before it is put into operation. This testing is crucial to verify that the transformer is ready for use in the electrical distribution system and to prevent potential issues or failures in the future. The commissioning test includes measuring insulation resistance, ground resistance, and phase-to-phase and phase-to-neutral voltages. The instruments used for these measurements are an insulation tester, earth tester, and clamp meter. The measurement results in this study are all in accordance with PLN standards. The insulation resistance measurements for phases R, S, and T are 2.99 GΩ, 2.34 GΩ, and 2.54 GΩ, respectively. For grounding resistance, the measurements for the neutral of the main distribution panel (PHB), transformer body, and lightning arrester are 2.72 Ω, 3.32 Ω, and 2.87 Ω, respectively. In the phase-to-phase voltage measurements, the values for phases R-S, R-T, and S-T are 406 V, 405 V, and 407 V, respectively. In the phase-to-neutral voltage measurements, the values for phases R, S, and T are 232 V, 233 V, and 233 V.