Claim Missing Document
Check
Articles

Found 2 Documents
Search

Business Strategy to Achieve the Target Time of Laytime Allowed for Coal Commodities Subastian, Djamal; Anindya, Badzlina; Najoan, Denny J.; Farisyi, Sofwan; Ichwan, Gema Akbar
Jurnal Manajemen Transportasi & Logistik (JMTRANSLOG) Vol 12, No 2 (2025): Juli
Publisher : Institut Transportasi dan Logistik Trisakti

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54324/j.mtl.v12i2.1787

Abstract

For the logistics process, the company needs to pay attention to the loadings process to achieve the laytime that has already been agreed between the parties. In the logistics process, the company often gets the problem which is not an accordance mismatch between the plan and actual in the process of coal loading. As a result, the company must pay demurrage due to the laytime used for the loading process over the laytime allowed. This research aims to determine a business strategy to achieve the target laytime of the coal loadings. This author used SWOT analysis for this research by analyzing external factors and internal factors. The author uses descriptive qualitative analysis as a data analysis method. The result of this strategy formulation is backward integration. The author used matrix IFE EFE and matrix SWOT as tools for making strategies.  The implementation is the company needs to acquire a jetty around the coal mine by using the profit from increasing profit so that the coal in the stockpile can accommodate large amounts of the coal and can be distributed quickly.
Evaluasi Efektivitas Manajemen dan Rekayasa Lalu Lintas Pada Simpang Asemka Dalam Rangka Mendukung Kebijakan Low Emission Zone Kota Tua Jakarta Barat Subastian, Djamal; Suryobuwono, Abdullah Ade; Agustin, Arneta
Jurnal Sistem Transportasi & Logistik Vol. 2 No. 2 (2022): Desember
Publisher : Institut Transportasi dan Logistik Trisakti

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54324/jstl.v2i2.2442

Abstract

The Low Emission Zone policy in the Kota Tua tourist area is carried out by carrying out traffic engineering at the Asemka intersection which is the meeting place of Jl. Pintu Besar Selatan (south approach), Jl. Pintu Besar Utara- Jl. St. Kota (north approach), Jl. Jembatan Batu (east approach), and Jl. Fly Over Pasar Pagi and Jl. Asemka (western approach). After the implementation of traffic engineering, it is necessary to analyze how the performance of the intersection is to determine the impact of diverting traffic flow from several roads. The method used in this study is MKJI 1997 to determine the performance of road sections manually and PTV Vissim which is a microsimulation software to determine the performance of intersections, from both methods the parameters obtained from the research results are almost close. From the analysis results obtained speed 54.81 km/hour, delay 72.11 seconds, the vehicle stopped 2.7 seconds/pcu with level of service F, from the simulation results obtained speed 53.25 km/hour, delay 37.26 seconds, vehicle stopped 1.43 seconds/pcu with level of service D, the difference from the calculation results is below 5% with the information received.