Claim Missing Document
Check
Articles

Found 4 Documents
Search

IMPLEMENTASI BIM DENGAN TEKNOLOGI CLOUD COMPUTING PADA PROSES PEMBANGUNAN RSU DI SIDOARJO Rizki, M. Alvan; Eviyanti, Ade; Hermawan, Hendri; Lazuardi, Fajar; Pranatadityo, Billy
Martabe : Jurnal Pengabdian Kepada Masyarakat Vol 8, No 5 (2025): MARTABE : JURNAL PENGABDIAN KEPADA MASYARAKAT
Publisher : Universitas Muhammadiyah Tapanuli Selatan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31604/jpm.v8i5.1944-1950

Abstract

Pembangunan Rumah Sakit Umum (RSU) sering menghadapi kendala dalam memahami dan menerapkan standar pembangunan yang sesuai dengan regulasi terbaru, seperti KRIS dan Permenkes No. 40 Tahun 2022. Pengabdian masyarakat ini bertujuan untuk meningkatkan efisiensi dan transparansi dalam proses pembangunan RSU melalui implementasi Building Information Management (BIM) berbasis Cloud Computing agar data didpatkan secara real-time. Metode yang digunakan meliputi pengumpulan data spesifikasi teknis RSU, sosialisasi penggunaan sistem cloud sebagai platform penyimpanan data, pemilihan Google Drive sebagai cloud serta penerapan fitur Google yang lain untuk proses tender terbuka. Hasilnya menunjukkan bahwa penggunaan teknologi cloud, terutama aplikasi gratis dan familiar, mampu meningkatkan aksesibilitas, keamanan, transparansi data tender dan efisien. Implementasi ini mendukung RSU dalam mematuhi standar regulasi dan meminimalkan risiko kesalahan selama proses pembangunan.
Bisar 3.0 for Analytical Road Pavement Design: Bisar 3.0 untuk Desain Jalan Beraspal Analitis N. Riwibowo; Prambudi, Wahyu Tri; Cahyaningrum, Fibia Sentauri; Ariyanti, Menik; Rizki, M. Alvan
Indonesian Journal of Innovation Studies Vol. 26 No. 4 (2025): October
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/ijins.v26i4.1751

Abstract

Background: Safe and comfortable road pavement is a fundamental requirement, yet most designs rely on empirical methods that limit the ability to analyze detailed structural behavior. Specific Background: Analytical methods allow comprehensive evaluation of pavement layer strength, enabling faster and more precise calculations. Knowledge Gap: Limited studies have applied Bisar 3.0 guided by the Nottingham Design Method to calculate strain and service life in pavements using CTB (Concrete Treated Base) and Class B aggregate layers. Aim: This study applies the Bisar 3.0 program to determine road service life under fatigue cracking and permanent deformation criteria. Results: Calculations show analytical methods predict a longer service life (~±20 years) than empirical methods. Higher foundation stiffness and low average daily traffic reduce service life, and fatigue cracking criteria indicate a longer lifespan than permanent deformation. Novelty: Integration of Bisar 3.0 with Nottingham Design Method for precise service life estimation provides a detailed analytical approach rarely applied in road pavement studies. Implications: Findings support engineers in optimizing pavement design, selecting appropriate layer materials, and predicting long-term road performance more accurately. Highlights: Analytical design predicts longer road service life than empirical methods Fatigue cracking lifespan exceeds permanent deformation lifespan Bisar 3.0 enables rapid and precise calculation of pavement layer strains Keywords: Road Pavement, Analytical Method, Bisar 3.0, Nottingham Design Method, Service Life
Time Delay Risk Analysis in SMPN 2 Mantup Classroom Construction: Analisis Risiko Penundaan Waktu dalam Konstruksi Ruang Kelas SMPN 2 Mantup Prambudi, Wahyu Tri; N. Riwibowo; Cahyaningrum, Fibia Sentauri; Ariyanti, Menik; Rizki, M. Alvan
Indonesian Journal of Innovation Studies Vol. 26 No. 4 (2025): October
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/ijins.v26i4.1752

Abstract

General Background: Timely completion of construction projects is critical for operational efficiency and cost management. Specific Background: The New Classroom Building Project at SMPN 2 Mantup-Lamongan experienced delays caused by human resources, material availability, and weather conditions, highlighting challenges in project scheduling and risk management. Knowledge Gap: Limited studies provide quantitative assessments of combined environmental, material, and workforce factors on construction delays in local school infrastructure projects. Aims: This study aims to analyze the magnitude of time delays, identify dominant risk factors, and propose mitigation strategies to manage project risks effectively. Results: Data from 45 respondents using questionnaires and analyzed via SPSS revealed that rainfall intensity (21.6%), workforce skill (16.8%), and worker discipline (14.4%) were the leading contributors to delays, with an overall project delay of 6 days compared to the planned schedule. Novelty: The research integrates Critical Path Method calculations with survey-based risk assessment to provide a precise, practical strategy for local construction projects. Implications: Findings offer actionable guidance for contractors and project managers to optimize resource allocation, reduce delays, and improve project reliability. Highlights: Rainfall intensity identified as the highest delay factor. Workforce skill and discipline significantly affect project duration. CPM combined with survey analysis provides actionable mitigation strategies. Keywords: Construction Delays, Risk Analysis, Critical Path, Project Management, SMPN 2 Mantup
Implementasi Biopori untuk Peningkatan Kualitas Lingkungan di Desa Kesimantengah Prima R., Audi; Rismawati, Pingki; Rizki, M. Alvan
Jurnal Pengabdian kepada Masyarakat Nusantara Vol. 5 No. 1 (2024): Jurnal Pengabdian kepada Masyarakat Nusantara (JPkMN)
Publisher : Lembaga Dongan Dosen

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55338/jpkmn.v5i1.2945

Abstract

Permasalahan lingkungan yang terus meningkat mempengaruhi kualitas lingkungan. Kurangnya pengelolaan sampah organik di Desa Kesimantengah Kecamatan Pacet perlu mendapatkan perhatian khusus. Sehingga mahasiswa yang melakukan Pengabdian Masyarakat melalui kegiatan kerja nyata (KKN) bertujuan untuk meningkatkan pemahaman pada warga Desa Kesimantengah dalam meningkatkan kualitas lingkungan terutama pengelolaan sampah organik. Metode kualitatif digunakan untuk meyelesaikan permasalahan yang ada dimulai dari observasi, studi literatur, penerapan inovasi, serta sosialisasi. Hasil yang diperoleh berupa pemasangan biopori serta diseminasi tentang manfaat positif bagi masyarakat setempat, terutama dalam hal pengetahuan dan keterampilan dalam meningkatkan kualitas lingkungan dengan mengelola sampah organik. Kesimpulan menunjukkan bahwa pemasangan biopori dan penyuluhan manfaat biopori yang telah dilakukan dapat meningkatkan kualitas lingkungan Kesimantengah, Kecamatan Pacet terutama pengelolaan sampah organik.