ANALYSIS OF FACTORS INHIBITING THE IMPLEMENTATION OF SMK3 IN THE WIDENING PROJECT OF KAPAS – GLENDENG BRIDGE, BOJONEGORO REGENCY Ariyanti, Menik; Oetomo, Wateno; Sajiyo, Sajiyo; Wulandari, Esti
INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM Vol. 2 No. 4 (2023): NOVEMBER
Publisher : Transpublika Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55047/ijateis.v2i4.980

Abstract

In construction projects, inadequate implementation of the Occupational Safety and Health Management System (OHSMS) poses risks to the safety and well-being of workers, resulting in decreased performance and compromised project quality. This study focuses on the Kapas-Glendeng bridge widening project in Bojonegoro Regency, identifying key obstacles such as workforce competence, limited experience, insufficient training, and challenges accessing digital information. Additionally, issues related to worker involvement in regulation-making, understanding of Personal Protective Equipment (PPE), reporting procedures, and documentation of work accidents were observed. To address these challenges, the study recommends strategies such as involving untrained workers in competence-building programs, providing apprenticeships for less experienced personnel, implementing comprehensive training information systems, actively engaging workers in project planning, enforcing OHS monitoring systems, ensuring mandatory PPE usage with penalties for violations, and establishing clear procedures for recording and reporting work accidents. This proactive approach aims to enhance OHS implementation and mitigate risks in construction projects.
ANALYSIS OF FACTORS INHIBITING THE IMPLEMENTATION OF K3 IN CONSTRUCTION PROJECTS Ariyanti, Menik; Wateno Oetomo; Sajiyo, Sajiyo
International Journal Science and Technology Vol. 3 No. 1 (2024): March: International Journal Science and Technology
Publisher : Asosiasi Dosen Muda Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56127/ijst.v3i1.1195

Abstract

Low implementation of K3 in construction projects can cause the safety and health of construction workers to be given less attention, so that construction workers feel less safe and comfortable, which can result in a decrease in performance levels. The impact of non-optimal performance results in the project being carried out not being able to meet the quality requirements that have been set. Based on data analysis from observations on the Kapas-Glendeng 8 bridge widening construction project, Bojonegoro Regency, there are inhibiting factors in implementing the occupational health and safety management system, namely workforce competency, work experience in the construction sector, job training, ability to access information via digital media. , worker involvement in making regulations, understanding and awareness in wearing PPE, reporting procedures, data recording and documentation.
Analisis Kinerja Biaya dan Waktu pada Proyek Perumahan Menggunakan Metode Earned Value: Penelitian Kasus Proyek Pembangunan Wisma Ababil Gresik Tri Prambudi, Wahyu; Widhah Kumala, Imtinan; Riwibowo, Nola; Ariyanti, Menik
Co-Value Jurnal Ekonomi Koperasi dan kewirausahaan Vol. 15 No. 8 (2025): Co-Value: Jurnal Ekonomi, Koperasi & Kewirausahaan
Publisher : Program Studi Manajemen Institut Manajemen Koperasi Indonesia Bandung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.59188/covalue.v15i8.5024

Abstract

Penelitian ini menganalisis kinerja biaya dan waktu pada proyek pembangunan perumahan Wisma Ababil di Gresik dengan menggunakan metode Earned Value Management (EVM). Proyek ini memiliki anggaran sebesar Rp 33.561.172.480 dan durasi 365 hari, namun mengalami keterlambatan selama 2 minggu. Penelitian ini bertujuan untuk menganalisis kinerja biaya dan waktu pada proyek pembangunan perumahan Wisma Ababil di Gresik menggunakan metode Earned Value Management (EVM). Dengan anggaran sebesar Rp 33.561.172.480 dan durasi rencana 365 hari, proyek ini mengalami keterlambatan selama 2 minggu, yang berdampak pada efisiensi pelaksanaan proyek. Metode EVM digunakan untuk mengevaluasi kinerja proyek secara kuantitatif melalui indikator seperti Schedule Performance Index (SPI) dan Cost Performance Index (CPI). Penelitian ini dilakukan dengan pendekatan deskriptif kuantitatif. Data dikumpulkan dari dokumen proyek, termasuk Rencana Anggaran Biaya (RAB) dan jadwal kerja, selama Maret hingga Oktober 2024. Hasil analisis menunjukkan bahwa proyek ini sedikit tertinggal dari jadwal dengan Schedule Performance Index (SPI) dan Cost Performance Index (CPI) yang menunjukkan kinerja yang kurang baik. Estimasi waktu kerja yang tersisa adalah sekitar 200 hari, sehingga total durasi proyek menjadi 368 hari. Proyek ini diproyeksikan menghemat biaya sebesar 1,06% dari jumlah kontrak, dengan total biaya akhir diperkirakan Rp 31.536.024.420. Kesimpulan penelitian menunjukkan bahwa meskipun terjadi keterlambatan waktu, pengelolaan yang baik terhadap sumber daya memungkinkan efisiensi biaya. Penelitian ini memberikan wawasan baru dalam pengelolaan proyek perumahan di Indonesia, yang sering menghadapi tantangan teknis dan operasional, serta merekomendasikan penggunaan metode yang lebih efisien dan pengawasan yang konsisten.
Pendampingan Pembangunan Jaringan Irigasi Air Tanah untuk Mendukung Ketahanan Pangan di Desa Jatimulyo Kecamatan Plumpang Kabupaten Tuban Prambudi, Wahyu Tri; Rowibowo, Nolo; Ariyanti, Menik; Cahyaningrum, Fibia Sentauri
Jurnal Pengabdian Masyarakat (ABDIRA) Vol 5, No 3 (2025): Abdira, Juli
Publisher : Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/abdira.v5i3.904

Abstract

This Community Service activity aims to optimize the groundwater irrigation network to support food security in Jatimulyo Village, Plumpang District, Tuban Regency. The main problem faced by the local community is the limited surface irrigation network, especially during the dry season. The methods used in this activity include counseling, diffusion of science and technology, training, and direct mentoring to farmer groups. The results of the activity show that farmers have increased their knowledge and skills in utilizing the groundwater irrigation system efficiently. In addition, an irrigation control tank unit has been built as a pilot model. This activity proves that a participatory approach and appropriate technology can encourage farmer empowerment and provide applicable alternative solutions to increase agricultural productivity in areas facing an irrigation water crisis. This activity was carried out in collaboration with the Bengawan Solo River Basin Authority as a form of synergy between academics and stakeholders in water resource management.
Pengaruh Efisiensi Alat Berat pada Pekerjaan Peningkatan Jalan Lingkungan Desa Sidomulyo Kecamatan Deket Kabupaten Lamongan Prambudi, Wahyu Tri; Riwibowo, N; Ariyanti, Menik; Cahyaningrum, Fibia Sentauri
Jurnal Sains Bangunan Vol 2 No 2 (2025): Jurnal Sains Bangunan Edisi September 2025
Publisher : FAKULTAS TEKNIK ITBADLA

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Penggunaan alat berat dalam pekerjaan peningkatan jalan lingkungan desa memiliki peran krusial dalam menunjang efisiensi pelaksanaan proyek, baik dari segi waktu maupun biaya. Penelitian ini bertujuan untuk menganalisis pengaruh efisiensi penggunaan alat berat terhadap keberhasilan pelaksanaan pekerjaan peningkatan jalan lingkungan di Desa Sidomulyo. Metode penelitian yang digunakan meliputi studi lapangan, pengumpulan data primer melalui observasi dan wawancara, serta analisis kuantitatif terhadap produktivitas alat berat dan korelasinya dengan durasi serta biaya pelaksanaan proyek. Hasil penelitian menunjukkan bahwa tingkat efisiensi alat berat, khususnya pada pekerjaan pemadatan dan pengangkutan material, memiliki pengaruh yang signifikan terhadap percepatan waktu penyelesaian dan pengurangan biaya operasional proyek. Penggunaan alat berat terbukti mampu mempersingkat waktu pelaksanaan pekerjaan menjadi 14 hari dari waktu rencana yang dijadwalkan semula yang memakan waktu 90 hari. Efisiensi waktu pelaksanaan proyek tersebut berdampak pada biaya operasional proyek yang dikeluarkan. Semakin cepat pelaksanaan suatu proyek maka semakin kecil pula biaya operasional yang akan dikeluarkan. Selain itu, ditemukan bahwa pemilihan jenis alat berat yang tepat serta pengelolaan waktu operasional yang optimal menjadi faktor utama dalam meningkatkan efisiensi kerja di lapangan. Penelitian ini merekomendasikan penerapan sistem manajemen alat berat yang lebih terstruktur pada proyek infrastruktur berskala desa untuk meningkatkan efektivitas pelaksanaan dan keberlanjutan pembangunan.
Bisar 3.0 for Analytical Road Pavement Design: Bisar 3.0 untuk Desain Jalan Beraspal Analitis N. Riwibowo; Prambudi, Wahyu Tri; Cahyaningrum, Fibia Sentauri; Ariyanti, Menik; Rizki, M. Alvan
Indonesian Journal of Innovation Studies Vol. 26 No. 4 (2025): October
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/ijins.v26i4.1751

Abstract

Background: Safe and comfortable road pavement is a fundamental requirement, yet most designs rely on empirical methods that limit the ability to analyze detailed structural behavior. Specific Background: Analytical methods allow comprehensive evaluation of pavement layer strength, enabling faster and more precise calculations. Knowledge Gap: Limited studies have applied Bisar 3.0 guided by the Nottingham Design Method to calculate strain and service life in pavements using CTB (Concrete Treated Base) and Class B aggregate layers. Aim: This study applies the Bisar 3.0 program to determine road service life under fatigue cracking and permanent deformation criteria. Results: Calculations show analytical methods predict a longer service life (~±20 years) than empirical methods. Higher foundation stiffness and low average daily traffic reduce service life, and fatigue cracking criteria indicate a longer lifespan than permanent deformation. Novelty: Integration of Bisar 3.0 with Nottingham Design Method for precise service life estimation provides a detailed analytical approach rarely applied in road pavement studies. Implications: Findings support engineers in optimizing pavement design, selecting appropriate layer materials, and predicting long-term road performance more accurately. Highlights: Analytical design predicts longer road service life than empirical methods Fatigue cracking lifespan exceeds permanent deformation lifespan Bisar 3.0 enables rapid and precise calculation of pavement layer strains Keywords: Road Pavement, Analytical Method, Bisar 3.0, Nottingham Design Method, Service Life
Time Delay Risk Analysis in SMPN 2 Mantup Classroom Construction: Analisis Risiko Penundaan Waktu dalam Konstruksi Ruang Kelas SMPN 2 Mantup Prambudi, Wahyu Tri; N. Riwibowo; Cahyaningrum, Fibia Sentauri; Ariyanti, Menik; Rizki, M. Alvan
Indonesian Journal of Innovation Studies Vol. 26 No. 4 (2025): October
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/ijins.v26i4.1752

Abstract

General Background: Timely completion of construction projects is critical for operational efficiency and cost management. Specific Background: The New Classroom Building Project at SMPN 2 Mantup-Lamongan experienced delays caused by human resources, material availability, and weather conditions, highlighting challenges in project scheduling and risk management. Knowledge Gap: Limited studies provide quantitative assessments of combined environmental, material, and workforce factors on construction delays in local school infrastructure projects. Aims: This study aims to analyze the magnitude of time delays, identify dominant risk factors, and propose mitigation strategies to manage project risks effectively. Results: Data from 45 respondents using questionnaires and analyzed via SPSS revealed that rainfall intensity (21.6%), workforce skill (16.8%), and worker discipline (14.4%) were the leading contributors to delays, with an overall project delay of 6 days compared to the planned schedule. Novelty: The research integrates Critical Path Method calculations with survey-based risk assessment to provide a precise, practical strategy for local construction projects. Implications: Findings offer actionable guidance for contractors and project managers to optimize resource allocation, reduce delays, and improve project reliability. Highlights: Rainfall intensity identified as the highest delay factor. Workforce skill and discipline significantly affect project duration. CPM combined with survey analysis provides actionable mitigation strategies. Keywords: Construction Delays, Risk Analysis, Critical Path, Project Management, SMPN 2 Mantup