IMPLEMENTASI BIM DENGAN TEKNOLOGI CLOUD COMPUTING PADA PROSES PEMBANGUNAN RSU DI SIDOARJO Rizki, M. Alvan; Eviyanti, Ade; Hermawan, Hendri; Lazuardi, Fajar; Pranatadityo, Billy
Martabe : Jurnal Pengabdian Kepada Masyarakat Vol 8, No 5 (2025): MARTABE : JURNAL PENGABDIAN KEPADA MASYARAKAT
Publisher : Universitas Muhammadiyah Tapanuli Selatan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31604/jpm.v8i5.1944-1950

Abstract

Pembangunan Rumah Sakit Umum (RSU) sering menghadapi kendala dalam memahami dan menerapkan standar pembangunan yang sesuai dengan regulasi terbaru, seperti KRIS dan Permenkes No. 40 Tahun 2022. Pengabdian masyarakat ini bertujuan untuk meningkatkan efisiensi dan transparansi dalam proses pembangunan RSU melalui implementasi Building Information Management (BIM) berbasis Cloud Computing agar data didpatkan secara real-time. Metode yang digunakan meliputi pengumpulan data spesifikasi teknis RSU, sosialisasi penggunaan sistem cloud sebagai platform penyimpanan data, pemilihan Google Drive sebagai cloud serta penerapan fitur Google yang lain untuk proses tender terbuka. Hasilnya menunjukkan bahwa penggunaan teknologi cloud, terutama aplikasi gratis dan familiar, mampu meningkatkan aksesibilitas, keamanan, transparansi data tender dan efisien. Implementasi ini mendukung RSU dalam mematuhi standar regulasi dan meminimalkan risiko kesalahan selama proses pembangunan.
PENGEMBANGAN INSTRUMEN EVALUASI MAHARAH QIRA’AH: Indonesia Lazuardi, Fajar; Zhafir Al Hazmi, Muhammad; Ridlo, Ubaid; Raswan
As-Sulthan Journal of Education Vol. 2 No. 2 (2025): November
Publisher : As-Sulthan Journal of Education

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Penelitian ini bertujuan untuk mengkaji secara komprehensif konsep, problematika, tahapan, dan instrumen penilaian Mahārah al-Qirā’ah (keterampilan membaca) dalam pembelajaran bahasa Arab. Menggunakan pendekatan kualitatif dengan jenis penelitian kepustakaan (library research), data diperoleh melalui kajian berbagai literatur ilmiah seperti buku dan artikel jurnal. Analisis data menggunakan teknik analisis isi (content analysis) untuk menelaah konsep dan praktik pengembangan keterampilan membaca. Hasil penelitian menunjukkan bahwa keterampilan membaca dalam bahasa Arab adalah proses bertahap, dimulai dari penguasaan aspek mekanis pada tahap permulaan hingga pemahaman makna secara mendalam pada tahap lanjutan. Kesenjangan kemampuan awal, lingkungan keluarga, dan rendahnya minat belajar merupakan problematika utama yang dihadapi. Untuk mencapai tujuan pembelajaran, penilaian Mahārah al-Qirā’ah harus bersifat bertingkat, meliputi tes dan non-tes, serta disesuaikan dengan tiga jenjang kemampuan (dasar, menengah, lanjut). Penilaian mencakup kemampuan melafalkan huruf, memahami makna leksikal dan kontekstual, menemukan ide pokok, hingga menerjemahkan dan mengkritisi isi teks. Penguasaan gramatika (nahwu dan sharaf) menjadi kunci penting dalam mencapai kemampuan membaca pemahaman tingkat lanjut.
Project Cost and Time Performance Analysis using the Earned Value Concept Method in Building Shophouses in Papua: Analisa Kinerja Biaya dan Waktu Proyek dengan Metode Earned Value Concept dalam Pembangunan Ruko di Papua Lazuardi, Fajar; Rizki, Muhammad Alvan
JRST (Jurnal Riset Sains dan Teknologi) Volume 10 No. 1, March 2026: JRST
Publisher : Universitas Muhammadiyah Purwokerto

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30595/jrst.v10i1.25969

Abstract

In construction implementation, effective management of cost, time, and resources is crucial to avoid the risk of project failure. Many problems encountered in construction projects stem from discrepancies between actual execution and initial planning, as well as a lack of accuracy in cost estimation during the planning phase, which can lead to budget overruns and scheduling deviations. This study aims to evaluate project performance using the Earned Value Concept (EVC) by assessing the ongoing work performance to provide a comprehensive overview of project efficiency. The research employs a descriptive quantitative method with an analytical approach to weekly project progress data collected at weeks 20, 23, 25, 27, and 30. The results indicate that the project experienced delays, as reflected by the Schedule Performance Index (SPI) consistently remaining below 1 and negative Schedule Variance (SV) values. Cost efficiency was initially achieved with a Cost Performance Index (CPI) of 1.23 in the early phase, but declined to 0.88 by week 30 due to increased actual costs. Based on estimation, the project is expected to be completed in 38 weeks, exceeding the original plan of 35 weeks, with a total projected cost of IDR 22,436,134,730.24, which is lower than the original budget of IDR 25,001,696,716.00   ABSTRAK (Bahasa Indonesia) Dalam Pelaksanaan konstruksi manajemen terhadap biaya, waktu, dan sumber daya sangat penting, untuk menghindari risiko kegagalan dalam pelaksanaan konstruksi. Banyak permasalahaan dalam pelaksanaan proyek konstruksi yang disebabkan karena ketidaksesuaian pelaksanaan dengan rencana, serta kurang ketelitian perhitungan biaya dalam tahap perencanaan yang dapat mengakibatkan pembengkakan biaya, selain itu ketidaksesuaian waktu yang direncanakan. Penelitian ini bertujuan untuk mengkaji kinerja proyek dengan pendekatan earned value concept dengan menilai kinerja pekerjaan yang sedang berlangsung sehingga dapat diperoleh gambaran mengenai evaluasi kinerja proyek. Penelitian ini menggunakan metode kuantitatif deskriptif, dengan pendekatan analitis terhadap data progres mingguan proyek pada minggu ke-20, 23, 25, 27, dan 30. Hasil penelitian menunjukkan bahwa proyek mengalami keterlambatan, tercermin dari nilai SPI yang selalu di bawah 1 dan SV yang bernilai negatif. Efisiensi biaya sempat tercapai pada awal pelaksanaan dengan CPI sebesar 1,23, namun menurun hingga 0,88 pada minggu ke-30 akibat peningkatan biaya aktual. Berdasarkan estimasi, proyek diperkirakan selesai dalam 38 minggu dari rencana awal 35 minggu, dengan total biaya penyelesaian sebesar Rp22.436.134.730,24, lebih rendah dari anggaran awal Rp25.001.696.716,00.