Claim Missing Document
Check
Articles

Found 2 Documents
Search

Feasibility Study for the Construction of the Dekranasda Gallery Building in Pangkalpinang City Putri Ayu Dwiyana; Junita Eka Susanti
G-Tech: Jurnal Teknologi Terapan Vol 9 No 3 (2025): G-Tech, Vol. 9 No. 3 July 2025
Publisher : Universitas Islam Raden Rahmat, Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.70609/g-tech.v9i3.7158

Abstract

The construction of the Dekranasda Gallery Building in Pangkalpinang City is planned as part of a strategy to strengthen the creative economy sector and increase the added value of local craft products. This study aims to identify the priority location for the construction of the Dekranasda Gallery Building by evaluating three alternative sites from technical, economic, social, and environmental perspectives. Each aspect is analyzed by considering the availability of basic infrastructure, land use suitability, investment value, and community perception and social support for the gallery's construction. The assessment is carried out comparatively to obtain the most optimal location recommendations. The analysis results show that Alternative Location 1 (Taman Mandara) has the highest overall score, relatively complete infrastructure support, good social suitability, and an estimated investment requirement of IDR 13,929,500,000. Alternative Location 2 (Tampuk Pinangpura) shows a reasonably good feasibility value but is not yet optimal from a technical perspective. Meanwhile, Alternative Location 3 (Tugu Kepiting) has limited infrastructure and a low social score, requiring a higher investment of IDR 14,229,500,000. Considering all aspects of feasibility, Alternative Location 1 is recommended as a priority location for constructing the Pangkalpinang City Dekranasda Gallery Building.
Comparative Analysis of Concrete QTO Using BIM and Conventional on XYZ Project Rizki Adithya Wibowo; Putri Ayu Dwiyana; Junita Eka Susanti
G-Tech: Jurnal Teknologi Terapan Vol 9 No 4 (2025): G-Tech, Vol. 9 No. 4 October 2025
Publisher : Universitas Islam Raden Rahmat, Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.70609/g-tech.v9i4.8075

Abstract

The rapid advancement of technology in the construction sector has encouraged the integration of digital modeling systems such as Building Information Modeling (BIM) to improve project efficiency and accuracy. This study analyzes the implementation of BIM using Autodesk Revit 2025 in the integrated design and build construction of the XYZ Project. The objective is to compare the Quantity Take Off (QTO) results between the BIM method and conventional concrete calculation for column and beam structures, as well as to evaluate the resulting cost differences. A quantitative comparative approach was employed by modeling the structure using Revit and manually calculating the quantities through conventional methods. The results show that both methods produced the same concrete volume for columns (891.6 m³), while for beams, the BIM method produced 1,104.59 m³ compared to 1,227.47 m³ from conventional calculations, yielding a difference of 122.88 m³ (11.12%) equivalent to IDR 294,831,618.37 in cost savings. The study concludes that BIM provides higher precision and reduces potential material waste, supporting more efficient budgeting and sustainable construction management.