PERENCANAAN PERBAIKAN RUANG FAKULTAS TEKNIKDI LANTAI 7 KAMPUS UNIVERSITAS MPU TANTULAR Manurung, Edison Hatoguan; Wardiningsih, Siti; Sinambela, Pahal; Sukma, Franka Hendra; Sitorus, Berlin P; Wardani, Retno Indriyati Kusuma; Santosa, Rudy Ady; Aziz, Maher; Kurniawan, Erik; Surya, Kevin Ganda; Sulung, Mukhamad Shodiq; Sihite, Boy; Purba, Dedy Saputra; Putra, Hagit; Gopur, Abdul; Septiawan, Didi; Pamtoro, Dodi Hadi; Arifin, Reza Nazar
MAJU : Indonesian Journal of Community Empowerment Vol. 3 No. 1 (2026): MAJU : Indonesian Journal of Community Empowerment, January 2026
Publisher : Lembaga Pendidikan dan Penelitian Manggala Institute

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.62335/maju.v3i1.2289

Abstract

Mpu Tantular University Jakarta (UMT) is a private university located in Cipinang Besar, East Jakarta, DKI Jakarta, under the coordination of the Higher Education Service Institution (LLDIKTI) Region III. UMT operates under the Murni Education Foundation (YPBM). The Community Service Program (KKN) is a compulsory course that must be taken by students as one of the requirements for completing undergraduate studies, particularly in the Civil Engineering and Architecture Study Programs at Mpu Tantular University Jakarta. The implementation of the KKN includes planning and renovation activities for lecturers’ and department head offices. One of the activities carried out involves creating several conceptual drawings, including the layout design for the head of the department’s office, planning and design improvements for the seventh-floor room, and rendering of the proposed design.
Evaluation Of Design Change Risks On Time And Quality Control In Apartment Projects In Samarinda City Hutagaol, Kerlima; Samosir, Maret Jerman; Sihite, Boy; E, Meliana Nur
Dharmawangsa: International Journal of the Social Sciences, Education and Humanitis Vol 7, No 1 (2026): Social Sciences, Education and Humanities
Publisher : Universitas Dharmawangsa Medan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.46576/ijsseh.v7i1.8426

Abstract

Design change is a common risk in construction projects and can significantly impact the efficiency of time control and work quality. This study aims to evaluate the impact of design change risk on time and quality control in a flat construction project in Samarinda. The research method used is a case study with a quantitative and qualitative descriptive approach, through interviews with the project team and analysis of project documents such as shop drawings, implementation schedules, and work progress reports. The results show that design changes that occurred in structural and architectural work caused a delay of 32 days from the initial schedule (from 365 days to 397 days). In addition, a decrease in quality efficiency was found due to revisions to working drawings and adjustments to technical specifications in the field. This impact can be minimized through the implementation of more intensive design coordination between planning consultants, supervisors, and contractors before work begins. This study emphasizes the importance of implementing design change risk management to maintain time control and quality in construction projects.