Assyarbini, Muhammad Akbar
Unknown Affiliation

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Pengaruh Aktifitas Alat Berat dan Peledakan Terhadap Stabilitas Lereng Timbunan Tambang Batubara Suparno, Fanteri Aji Dharma; Aminah, Siti; Haeruddin, Haeruddin; Rini, Utari Retno Sulistyo; Mulyani, Kurnia Dewi; Manek, Emanuel Grace; Assyarbini, Muhammad Akbar
MEDIA KOMUNIKASI TEKNIK SIPIL Volume 31, Nomor 2, DESEMBER 2025 (IN PROGRESS)
Publisher : Department of Civil Engineering, Diponegoro University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.14710/mkts.v31i2.69177

Abstract

Open-pit mining generates voids backfilled with overburden, forming artificial slopes susceptible to landslides. Improper slope design and external factors such as heavy equipment loads, blasting vibrations, and groundwater may trigger instability. This study examines the stability of a disposal slope adjacent to the blasting zone at PT X Coal Mine in East Kalimantan, Indonesia. The research uses secondary data from PT X. including geotechnical parameters and operational details, Slope stability was evaluated via the Limit Equilibrium Method (Bishop and Morgenstern-Price) and Finite Element Method (FEM). Initial analyses revealed critical safety factors (FoS) of 0.853 (Bishop, Morgenstern-Price) and 0.520 (FEM), indicating high instability under combined dynamic and hydrogeological stresses. A slope redesign was proposed, improving FoS to 3.932 (dry) and 3.523 (wet) via Limit Equilibrium, and 1.570 (dry) and 1.370 (wet) via FEM. These value;s comply with the safety threshold (FoS ≥ 1.1) specified in KEPMEN ESDM No. 1827 K/30/MEM/2018, ensuring operational safety. The study underscores the necessity of integrating geotechnical and operational constraints in slope design to mitigate landslide risks in open-pit mining.