Claim Missing Document
Check
Articles

Found 2 Documents
Search
Journal : J-Com (Journal of Computer)

PENERAPAN ALGORITMA NAIVE BAYES UNTUK PREDIKSI WAKTU TUNGGU ALUMNI MENDAPATKAN PEKERJAAN PADA LEMBAGA PUSAT LAYANAN KARIR STMIK ROYAL Aulia, Tasyia Dita; Siagian, Yessica; Putri, Pristiyanilicia
J-Com (Journal of Computer) Vol. 3 No. 2 (2023): Juli 2023
Publisher : STMIK Royal Kisaran

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33330/j-com.v3i2.2504

Abstract

Abstract: Getting a job is a goal by graduates after completing their studies. But in this process, getting a job inevitably requires waiting time. If one measure of success in the field of education of a tertiary institution is the number of graduates entering the workforce. So to implement this goal, alumni data is needed that can be used in decision making. Existing tracer study data at the STMIK Royal Career Service Center (LPLK) have not been utilized optimally by the campus. If we dig deeper, we will get some knowledge from this data by applying data mining techniques. Therefore, it is clear that using data mining to predict alumni waiting time is important for a university to determine its strategy. The purpose of this study is to predict the waiting time for alumni to get a job using data mining by applying the Naive Bayes algorithm. Training and testing data were taken from 193 data tracer study alumni of STMIK Royal in 2021 who had graduated and were working. The criteria used to predict alumni waiting time are gender, major, year of entry, year of graduation, GPA, and length of time getting a job. The results of modeling using the Naive Bayes algorithm produce an accuracy of 94%. Keyword: data mining; naive bayes; waiting time  Abstrak: Mendapatkan pekerjaan merupakan tujuan oleh lulusan setelah menyelesaikan studi mereka. Tetapi dalam proses ini, mendapatkan pekerjaan pasti membutuhkan waktu tunggu. Jika salah satu ukuran keberhasilan di bidang pendidikan suatu perguruan tinggi adalah banyaknya lulusan yang masuk ke dunia kerja. Maka untuk menerapkan tujuan itu, maka diperlukan data alumni yang dapat digunakan dalam pengambilan keputusan. Data tracer study yang ada di Lembaga Pusat Layanan Karir (LPLK) STMIK Royal belum dimanfaatkan secara optimal oleh kampus. Jika kita gali lebih dalam, kita akan mendapatkan suatu pengetahuan dari data ini dengan menerapkan teknik data mining. Oleh karena itu, jelas bahwa menggunakan data mining untuk memprediksi waktu tunggu alumni penting bagi suatu perguruan tinggi untuk menentukan strateginya. Tujuan dari penelitian ini adalah untuk memprediksi waktu tunggu alumni mendapatkan pekerjaan  menggunakan data mining dengan menerapkan algoritma naive bayes. Data training dan testing diambil dari 193 data tracer study alumni STMIK Royal tahun 2021 yang sudah lulus dan bekerja. Kriteria yang digunakan untuk memprediksi waktu tunggu kerja alumni yaitu jenis kelamin, jurusan, tahun masuk, tahun lulus, IPK, dan lama mendapatkan pekerjaan. Hasil pemodelan dengan menggunakan algoritma naive bayes menghasilkan akurasi sebesar 94%. Kata Kunci: data mining; naive bayes; waktu tunggu
PENGGUNAAN METODE SCRUM DALAM MEMBANGUN APLIKASI SISTEM MONITORING UPDATE MAINTENANCE SITE DAN GENSET PT. SIBATEL Harahap, Endang Sri Wangi; Kurniawan, Edi; Putri, Pristiyanilicia
J-Com (Journal of Computer) Vol. 3 No. 2 (2023): Juli 2023
Publisher : STMIK Royal Kisaran

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33330/j-com.v3i2.2505

Abstract

Abstract: The use of technology is currently progressing and its development can be used in the processing, dissemination, and presentation of good information. The application system so far has been able to provide attractive services and make work easier for the public, both in information services and documentation services, such as monitoring applications. In line with the problems that exist in PT. SIBATEL, where in the previous update monitoring process work in the field to report to their superiors was considered to be inefficient. The purpose of this research is to design an application system for site and generator maintenance update monitoring that is useful at PT. SIBATEL. In designing this system application, it is hoped that it can be completed quickly and properly according to needs by using Scrum or the Agile Scrum framework. The results of this application development are considered effective and efficient in terms of time and are structured in carrying out the features needed by going through the stages: Product Backlog, Sprint Planning Meeting, Sprint Backlog, Daily Stand Up Meeting, Sprint Review, and Sprint Retrospective, with Focus factors which are used by 0.8 or 80% with a different sprint length in each sprint. So the selection of the scrum method in the development of site and generator maintenance update monitoring applications at PT. SIBATEL is considered quite good and useful.            Keywords: scrum; application; system; monitoring; maintenance; site; genset  Abstrak: Pemanfaatan teknologi saat ini sudah berkembang maju dan perkembangannya dapat digunakan dalam pengolahan, penyebaran, dan penyajian informasi yang baik. Sistem aplikasi hingga saat ini telah mampu memberikan layanan yang menarik dan meringankan pekerjaan kepada khalayak publik, baik dalam layanan informasi maupun dalam layanan dokumentasi, seperti halnya aplikasi monitoring. Sejalan dengan masalah yang ada pada PT. SIBATEL, dimana pada proses update monitoring sebelumnya pemantauan pekerjaan dilapangan untuk melaporkan ke atasannya dinilai kurang efisien. Tujuan dari penelitian ini adalah untuk merancang sistem aplikasi monitoring update maintenance site dan genset yang berguna pada PT. SIBATEL. Dalam perancangan aplikasi sistem ini diharapkan dapat diselesaikan dengan cepat dan baik sesuai kebutuhan dengan menggunakan scrum atau kerangka kerja Agile Scrum. Hasil dari pengembangan aplikasi ini dinilai efektif dan efisien dari segi waktu serta terstruktur dalam pengerjaan fitur-fitur yang dibutuhkan dengan melalui tahapan : Product Backlog, Sprint Planning Meeting, Sprint Backlog, Daily Stand Up Meeting, Sprint Review, dan Sprint Retrospective, dengan Focus factor yang digunakan sebesar 0,8 atau 80% dengan panjang sprint yang berbeda pada tiap-tiap sprint. Sehingga pemilihan metode scrum dalam pengembangan aplikasi monitoring update maintenance site dan genset pada PT. SIBATEL dinilai cukup baik dan berguna. Kata kunci: scrum; application; system; monitoring; maintenance; site; genset